    "title": {
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/crbp1040.jpg",
          "alt": "Man Stands On Siphon",
          "caption": null,
          "credit": "Columbia River Basin Project: Dam Construction in the Pacific Northwest"
        },
        "text": {
          "headline": "Columbia River Basin Project: Dam Construction in the Pacific Northwest Timeline",
          "text": "Digitized photographs pertaining to the Columbia Basin Project (which includes the construction of the Grand Coulee Dam and the canal systems of Central Washington) and other dams constructed in Washington, Idaho, and Oregon. The bulk of photographs pertain to the construction of the Grand Coulee Dam."
        }
    },
    "events": [
      {
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1244_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. 54-B shovel is loading 10 yard Euclid trucks with rock from the G.N.R.R. crossing plug at the station 1043/20. Water in the canal came from snow melt and subsurface infiltration. A small patch of snow appears above the truck at the right. The subsurface flow had to be pumped out of the canal. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer.",
          "caption": "2nd Section West Canal",
          "link": "/digital/crbp/items/crbp1244.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "2nd Section West Canal",
          "text": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. 54-B shovel is loading 10 yard Euclid trucks with rock from the G.N.R.R. crossing plug at the station 1043/20. Water in the canal came from snow melt and subsurface infiltration. A small patch of snow appears above the truck at the right. The subsurface flow had to be pumped out of the canal. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1277_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. Job-made A.E.A. dispenser on one of the Koehring 34E concrete mixers being examined by Chief Inspector Lloyd C. Russell. It is the rubber bag type, actuated by the charging skip. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer",
          "caption": "Chief Inspector Inspects A Concrete Mixer",
          "link": "/digital/crbp/items/crbp1277.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "05",
          "year": "1950"
        },
        "text": {
          "headline": "Chief Inspector Inspects A Concrete Mixer",
          "text": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. Job-made A.E.A. dispenser on one of the Koehring 34E concrete mixers being examined by Chief Inspector Lloyd C. Russell. It is the rubber bag type, actuated by the charging skip. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1274_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Hoppers and discharge pipes for concrete in Guntert and Zimmerman paver. Shuttle car is visible in the upper right corner.",
          "caption": "Closeup Of Hoppers And Drainage Pipes Inside The Paver",
          "link": "/digital/crbp/items/crbp1274.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "Closeup Of Hoppers And Drainage Pipes Inside The Paver",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Hoppers and discharge pipes for concrete in Guntert and Zimmerman paver. Shuttle car is visible in the upper right corner."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1245_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 1st section, Potholes East Canal, Specs. 2787. 54 B dragline excavating shot rock and loading into 18 cy. Yd. dump trucks hauling and wasting on right of station 231/00. Work is being performed by Guy F. Atkinson Co. under above specifications. H. E. Foss, photographer.",
          "caption": "Dragline Excavation",
          "link": "/digital/crbp/items/crbp1245.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Dragline Excavation",
          "text": "Columbia Basin Project, Irrigation Division, 1st section, Potholes East Canal, Specs. 2787. 54 B dragline excavating shot rock and loading into 18 cy. Yd. dump trucks hauling and wasting on right of station 231/00. Work is being performed by Guy F. Atkinson Co. under above specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1276_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Finished canal, with curing compound applied. Sprayers work from platform nearest the camera, this moves independently from the paver.",
          "caption": "Finished Canal Sans Water",
          "link": "/digital/crbp/items/crbp1276.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "Finished Canal Sans Water",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Finished canal, with curing compound applied. Sprayers work from platform nearest the camera, this moves independently from the paver."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1246_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 1st section, Potholes East Canal, Specs. 2787. 120 B dragline electrically operated excavating canal section at station 328. Work is being performed by Guy F. Atkinson Co. under above specifications. H.E. Foss, photographer",
          "caption": "Heavy Equipment Excavation",
          "link": "/digital/crbp/items/crbp1246.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Heavy Equipment Excavation",
          "text": "Columbia Basin Project, Irrigation Division, 1st section, Potholes East Canal, Specs. 2787. 120 B dragline electrically operated excavating canal section at station 328. Work is being performed by Guy F. Atkinson Co. under above specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1275_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co, Reinforcing steel jumbo in middle distance and paver farthest from the camera.",
          "caption": "Jumbo And Paver In The Distance, Support Machinery Along The Sides Of The Canal",
          "link": "/digital/crbp/items/crbp1275.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "Jumbo And Paver In The Distance, Support Machinery Along The Sides Of The Canal",
          "text": "West Canal, Specs. 1286, Winston-Utah Co, Reinforcing steel jumbo in middle distance and paver farthest from the camera."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1243_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division I, Main Canal, Specifications 1236, J. A. Terteling and Sons, Inc., Contractors. Main canal looking upstream from sta. 33/00. Monighan dragline building up right bank with borrow material prior to placing rock on face of bank from canal excavation.",
          "caption": "Main Canal",
          "link": "/digital/crbp/items/crbp1243.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "04",
          "year": "1948"
        },
        "text": {
          "headline": "Main Canal",
          "text": "Columbia Basin Project, Irrigation Division I, Main Canal, Specifications 1236, J. A. Terteling and Sons, Inc., Contractors. Main canal looking upstream from sta. 33/00. Monighan dragline building up right bank with borrow material prior to placing rock on face of bank from canal excavation."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1240_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. This is a montage showing various stages in the construction of the West and East low canals. From the upper left proceeding clockwise: sloping; tamping; paving, West Canal; spraying, paving, East Low Canal; trimming, West Canal.",
          "caption": "Montage",
          "link": "/digital/crbp/items/crbp1240.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "17",
          "year": "1949"
        },
        "text": {
          "headline": "Montage",
          "text": "Columbia Basin Project, Irrigation Division. This is a montage showing various stages in the construction of the West and East low canals. From the upper left proceeding clockwise: sloping; tamping; paving, West Canal; spraying, paving, East Low Canal; trimming, West Canal."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1241_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Utah Construction Company and Winston Bros. Co., Contractor. This view of the Schedule II excavation looking downstream from station 465/50/, shows the 1' sq. bar welded near the bottom of the 4' x 4' angle iron staub for the support of the outer curtain of re-steel. In the upper center, the contractor's men are preparing the invert for the staubs and the protective mortar slab. H. E. Foss, Photographer",
          "caption": "Schedule Ii Excavation",
          "link": "/digital/crbp/items/crbp1241.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1949"
        },
        "text": {
          "headline": "Schedule Ii Excavation",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Utah Construction Company and Winston Bros. Co., Contractor. This view of the Schedule II excavation looking downstream from station 465/50/, shows the 1' sq. bar welded near the bottom of the 4' x 4' angle iron staub for the support of the outer curtain of re-steel. In the upper center, the contractor's men are preparing the invert for the staubs and the protective mortar slab. H. E. Foss, Photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1239_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream at approximate station 2015.00 at caterpillar dozer with one tooth ripper doing rough excavation for chute. Winnin and Shilling--contractor. H. E. Foss--photographer.",
          "caption": "Tooth Ripper Excavation",
          "link": "/digital/crbp/items/crbp1239.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "04",
          "year": "1950"
        },
        "text": {
          "headline": "Tooth Ripper Excavation",
          "text": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream at approximate station 2015.00 at caterpillar dozer with one tooth ripper doing rough excavation for chute. Winnin and Shilling--contractor. H. E. Foss--photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1272_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. View of curing jumbo and completed lining from the finishing jumbo. Four workmen are applying white pigmented curing compound to the concrete lining. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "View Of Completed Lining, And Curing Jumbo",
          "link": "/digital/crbp/items/crbp1272.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "03",
          "year": "1950"
        },
        "text": {
          "headline": "View Of Completed Lining, And Curing Jumbo",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. View of curing jumbo and completed lining from the finishing jumbo. Four workmen are applying white pigmented curing compound to the concrete lining. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1273_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Finishers' platform following Guntert and Zimmerman paver.",
          "caption": "View Of Finisher'S Platform From Inside The Canal",
          "link": "/digital/crbp/items/crbp1273.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "View Of Finisher'S Platform From Inside The Canal",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Finishers' platform following Guntert and Zimmerman paver."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1242_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 2. View looking north westerly into ditch being excavated for W 645 drain culvert under third section of the West Canal at station 1632.25. The buildings in the background are a portion of homes and businesses in the incorporated city limits of Quincy, Washington. Marshall, Haas and Royce and Haas and Rothschild--Contractor. H.E.Foss, Photographer.",
          "caption": "W 645 Drain Excavation",
          "link": "/digital/crbp/items/crbp1242.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "04",
          "year": "1950"
        },
        "text": {
          "headline": "W 645 Drain Excavation",
          "text": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 2. View looking north westerly into ditch being excavated for W 645 drain culvert under third section of the West Canal at station 1632.25. The buildings in the background are a portion of homes and businesses in the incorporated city limits of Quincy, Washington. Marshall, Haas and Royce and Haas and Rothschild--Contractor. H.E.Foss, Photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1262_sm.jpg",
          "alt": "Columbia River Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. A general view of operations in the chute seen from the highway bridge at station 12+27. The floor pour in the immediate foreground has just been completed and the concrete finisher is setting bolts in the fresh concrete which will be used to anchor wall form bracing. Work is being performed by J.A. Tertling and Sons, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "A View Of Work Being Performed On Fresh Concrete At Winchester Wasteway",
          "link": "/digital/crbp/items/crbp1262.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "18",
          "year": "1950"
        },
        "text": {
          "headline": "A View Of Work Being Performed On Fresh Concrete At Winchester Wasteway",
          "text": "Columbia River Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. A general view of operations in the chute seen from the highway bridge at station 12+27. The floor pour in the immediate foreground has just been completed and the concrete finisher is setting bolts in the fresh concrete which will be used to anchor wall form bracing. Work is being performed by J.A. Tertling and Sons, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1248_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation division, Specifications No. 2648, Winchester Wasteway, Earthwork and Structures Station 1/28.67 to station 964/00. Contractor: J.A. Tertling and Sons, Inc. Blasting in the vicinity of Station 7/00 in the chute section. The picture is taken, looking north, from the highway 8 miles east of Quincy, Wash. Harold Foss, photographer.",
          "caption": "Blasting",
          "link": "/digital/crbp/items/crbp1248.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Blasting",
          "text": "Columbia Basin Project, Irrigation division, Specifications No. 2648, Winchester Wasteway, Earthwork and Structures Station 1/28.67 to station 964/00. Contractor: J.A. Tertling and Sons, Inc. Blasting in the vicinity of Station 7/00 in the chute section. The picture is taken, looking north, from the highway 8 miles east of Quincy, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1283_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bridge bents and abutments for the county road bridge at station 1151+87. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Bridge Bents And Abutments",
          "link": "/digital/crbp/items/crbp1283.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Bridge Bents And Abutments",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bridge bents and abutments for the county road bridge at station 1151+87. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1296_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Main Canal. General view of completed section of Main Canal, looking west (downstream). H. Foss, photographer.",
          "caption": "Car Parked In Completed Section Of Main Canal",
          "link": "/digital/crbp/items/crbp1296.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "11",
          "year": "1949"
        },
        "text": {
          "headline": "Car Parked In Completed Section Of Main Canal",
          "text": "Columbia Basin Project, Irrigation Division, Main Canal. General view of completed section of Main Canal, looking west (downstream). H. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1247_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Third Section, West Canal, Specifications 2844, Schedule No. 1 and 2. View in bottom of West Canal as excavated at Statio 1272/00 looking downstream at D 8 Cat with ripper working at loosening caliche for excavation by 54B Dragling shown at Station 1272/00. Marshall Haas, and Royce, Haas and Rothschild--Contractor. He. E. Foss, photographer.",
          "caption": "Cat With Ripper",
          "link": "/digital/crbp/items/crbp1247.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "Cat With Ripper",
          "text": "Columbia Basin Project, Irrigation Division, Third Section, West Canal, Specifications 2844, Schedule No. 1 and 2. View in bottom of West Canal as excavated at Statio 1272/00 looking downstream at D 8 Cat with ripper working at loosening caliche for excavation by 54B Dragling shown at Station 1272/00. Marshall Haas, and Royce, Haas and Rothschild--Contractor. He. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1269_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Close-up of lining machine showing trailing edge of slip form and hinged spring-loaded pressure plate extending the full length of the slope to trowel the concrete. Longitudinal groove cutters are attached to the underside of the pressure plate. The man watching the action of the machine is Loyd C. Russell, Chief Inspector. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer",
          "caption": "Close Up Of Lining Machine",
          "link": "/digital/crbp/items/crbp1269.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "05",
          "year": "1950"
        },
        "text": {
          "headline": "Close Up Of Lining Machine",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Close-up of lining machine showing trailing edge of slip form and hinged spring-loaded pressure plate extending the full length of the slope to trowel the concrete. Longitudinal groove cutters are attached to the underside of the pressure plate. The man watching the action of the machine is Loyd C. Russell, Chief Inspector. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1253_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Close-up showing drive mechanism excavating buckets and conveyor belts on the right front side of the trimmer. Left side is similar. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Close-Up Of Drive Mechanism",
          "link": "/digital/crbp/items/crbp1253.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Close-Up Of Drive Mechanism",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Close-up showing drive mechanism excavating buckets and conveyor belts on the right front side of the trimmer. Left side is similar. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1249_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 1st Section Potholes East Canal, Specs. 2787. Compacted core bank construction in thoro-fill section Sta. 330 to 348. All material hauled from borrow areas by WD-10 scrapers and rolled with sheepsfoot roller. Work was performed by Guy F. Atkinson Co. under above specifications. H.E. Foss, photographer",
          "caption": "Compacted Core Bank Construction",
          "link": "/digital/crbp/items/crbp1249.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Compacted Core Bank Construction",
          "text": "Columbia Basin Project, Irrigation Division, 1st Section Potholes East Canal, Specs. 2787. Compacted core bank construction in thoro-fill section Sta. 330 to 348. All material hauled from borrow areas by WD-10 scrapers and rolled with sheepsfoot roller. Work was performed by Guy F. Atkinson Co. under above specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1348_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Inlet end of completed drain inlet at station 1175+44. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Completed Drain Inlet",
          "link": "/digital/crbp/items/crbp1348.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Completed Drain Inlet",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Inlet end of completed drain inlet at station 1175+44. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1286_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal, Specification 1422, Utah Construction Co. and Winston Bros., Contractors. Cracking of an experimental section of the 4 1/2 inch reinforced concrete canal lining which was placed without transverse grooves for approximately 1400 linear feet. These cracks, which vary in width from hairline to 1/4 inch, appear from 50 to 75 foot intervals and extend transversely across the canal almost at exact right angles to the centerline. Note the fracturing of the concrete adjacent to the cracks. The lining was laid during the first week of June, the cracks were first laid during the latter part of July. H.E. Foss, photographer.",
          "caption": "Cracks In The Lining",
          "link": "/digital/crbp/items/crbp1286.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "30",
          "year": "1949"
        },
        "text": {
          "headline": "Cracks In The Lining",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal, Specification 1422, Utah Construction Co. and Winston Bros., Contractors. Cracking of an experimental section of the 4 1/2 inch reinforced concrete canal lining which was placed without transverse grooves for approximately 1400 linear feet. These cracks, which vary in width from hairline to 1/4 inch, appear from 50 to 75 foot intervals and extend transversely across the canal almost at exact right angles to the centerline. Note the fracturing of the concrete adjacent to the cracks. The lining was laid during the first week of June, the cracks were first laid during the latter part of July. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1294_sm.jpg",
          "alt": "Feeder Canal, Sta. 65+27, 50' rt. Of canal centerline. Photograph of core boxes Nos. 1 and 2 of Feder Canal diamond drill hole No. 61",
          "caption": "Diamond Drill Hole",
          "link": "/digital/crbp/items/crbp1294.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "13",
          "year": "1947"
        },
        "text": {
          "headline": "Diamond Drill Hole",
          "text": "Feeder Canal, Sta. 65+27, 50' rt. Of canal centerline. Photograph of core boxes Nos. 1 and 2 of Feder Canal diamond drill hole No. 61"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1288_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View from the operation deck looking N.W. at slab #1 right. Hand compacted backfill operations are being conducted by pushing material over the top with a D-& dozer. A level shelf is being formed by hand shoveling from loose material pushed in and the material is compacted in horizontal layers 3 to 4 inches in depth. The inlet cutoff wall in the center of the picture is the upstream limit of the structure. Work is being performed by George B. Henly Construction Co., Inc. under Schedule 1 of above Specifications. H. E. Foss, photographer.",
          "caption": "Dozer In Backfill Operation",
          "link": "/digital/crbp/items/crbp1288.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "12",
          "year": "1950"
        },
        "text": {
          "headline": "Dozer In Backfill Operation",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View from the operation deck looking N.W. at slab #1 right. Hand compacted backfill operations are being conducted by pushing material over the top with a D-& dozer. A level shelf is being formed by hand shoveling from loose material pushed in and the material is compacted in horizontal layers 3 to 4 inches in depth. The inlet cutoff wall in the center of the picture is the upstream limit of the structure. Work is being performed by George B. Henly Construction Co., Inc. under Schedule 1 of above Specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1295_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. West and East Low Canals--Specifications 1286 and 1422. Winston Bros. Co. and Utah Construction Company, Contractors. View shows entire group of cores removed to date from 4 1/2-inch canal lining. Excellent consolidation and absence of segregation in this air entrained concrete is shown. West Canal specimens show transverse and longitudinal cuts of reinforcing steel. East Low lining is unreinforced. Calculated overrun in West Canal was much greater than in East Low Canal, a fact verified by this photograph. H.E. Foss, photographer",
          "caption": "East And West Canal Core Samples",
          "link": "/digital/crbp/items/crbp1295.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "28",
          "year": "1948"
        },
        "text": {
          "headline": "East And West Canal Core Samples",
          "text": "Columbia Basin Project--Irrigation Division. West and East Low Canals--Specifications 1286 and 1422. Winston Bros. Co. and Utah Construction Company, Contractors. View shows entire group of cores removed to date from 4 1/2-inch canal lining. Excellent consolidation and absence of segregation in this air entrained concrete is shown. West Canal specimens show transverse and longitudinal cuts of reinforcing steel. East Low lining is unreinforced. Calculated overrun in West Canal was much greater than in East Low Canal, a fact verified by this photograph. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1290_sm.jpg",
          "alt": "South Coulee Dam--Embankment placing operations, stations 33+50 to 34+50, approximate elevation 1499. Closeup of standard and narrow-drum rollers, showing effect of cleaners. Approximate needle moisture reading of 2700",
          "caption": "Embankment Placing Operations",
          "link": "/digital/crbp/items/crbp1290.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "26",
          "year": "1947"
        },
        "text": {
          "headline": "Embankment Placing Operations",
          "text": "South Coulee Dam--Embankment placing operations, stations 33+50 to 34+50, approximate elevation 1499. Closeup of standard and narrow-drum rollers, showing effect of cleaners. Approximate needle moisture reading of 2700"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1252_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. Contractors employees erecting the Guntert and Zimmerman trimmer at about station 1045. This view shows the back of the machine. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer",
          "caption": "Erecting The Trimmer",
          "link": "/digital/crbp/items/crbp1252.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "Erecting The Trimmer",
          "text": "Columbia Basin Project, Irrigation Division, 2nd section West Canal, Specs. 2541. Contractors employees erecting the Guntert and Zimmerman trimmer at about station 1045. This view shows the back of the machine. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1289_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2844, 3rd Section, West Canal, Schedule 3. Contractor: Minnis and Shilling. Looking downstream into chute from left bank at Station 1992+50 showing finished wall sections of chute. Concrete is being placed in forms set at station 2001+00 approximately. H. E. Foss, photographer",
          "caption": "Finished Wall Sections Of Chute",
          "link": "/digital/crbp/items/crbp1289.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "08",
          "year": "1950"
        },
        "text": {
          "headline": "Finished Wall Sections Of Chute",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2844, 3rd Section, West Canal, Schedule 3. Contractor: Minnis and Shilling. Looking downstream into chute from left bank at Station 1992+50 showing finished wall sections of chute. Concrete is being placed in forms set at station 2001+00 approximately. H. E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1268_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station 74+80 to Station 1101+29.00--Main Canal. Contractor: Western Contracting Corp. Front view of the slip form lining machine. Harold Foss, photographer",
          "caption": "Front View Of The Slip Form Lining Machine [01]",
          "link": "/digital/crbp/items/crbp1268.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "15",
          "year": "1949"
        },
        "text": {
          "headline": "Front View Of The Slip Form Lining Machine [01]",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station 74+80 to Station 1101+29.00--Main Canal. Contractor: Western Contracting Corp. Front view of the slip form lining machine. Harold Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1267_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station 745+80 to Station 1101+29.0--Main Canal. Contractor: Western Contracting Corp. Front view of the slip form lining machine. The near mixer discharges concrete onto a conveyor belt leading to the hopper in the center, from which it is distributed by a shuttle-car to the right half of the lining. A similar car on the left is supplied by concrete by the far mixer. Water for sprinkling the subgrade is carried in tanks mounted on the lining machine and are supplied by 3000-gallon tank trucks. Harold Foss, photographer.",
          "caption": "Front View Of The Slip Form Lining Machine [02]",
          "link": "/digital/crbp/items/crbp1267.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "09",
          "year": "1949"
        },
        "text": {
          "headline": "Front View Of The Slip Form Lining Machine [02]",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 2, Long Lake Dam Headworks and Concrete Canal Lining and Structures Station 745+80 to Station 1101+29.0--Main Canal. Contractor: Western Contracting Corp. Front view of the slip form lining machine. The near mixer discharges concrete onto a conveyor belt leading to the hopper in the center, from which it is distributed by a shuttle-car to the right half of the lining. A similar car on the left is supplied by concrete by the far mixer. Water for sprinkling the subgrade is carried in tanks mounted on the lining machine and are supplied by 3000-gallon tank trucks. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1254_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Guntert and Zimmerman trimmer (front view) at about station 1050. This machine is trimming the canal bottom and slopes to the neat line of the underside of the concrete lining. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer",
          "caption": "Front View Of The Trimmer In Operation",
          "link": "/digital/crbp/items/crbp1254.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "17",
          "year": "1950"
        },
        "text": {
          "headline": "Front View Of The Trimmer In Operation",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Guntert and Zimmerman trimmer (front view) at about station 1050. This machine is trimming the canal bottom and slopes to the neat line of the underside of the concrete lining. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1291_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Abutments and pier for the G.N.R.R. bridge at canal station 1224+57. Backfilling is complete around the abutment at the right and nearly completion that at the left. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications",
          "caption": "Gnrr Bridge Construction",
          "link": "/digital/crbp/items/crbp1291.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Gnrr Bridge Construction",
          "text": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Abutments and pier for the G.N.R.R. bridge at canal station 1224+57. Backfilling is complete around the abutment at the right and nearly completion that at the left. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1285_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This photograph shows the gravel trap sump and the baffles with their drains very clearly. Flow is from upper right to lower left of the picture. The iron ladder steps for getting in and out of the open transition are shown in the lower right corner of the picture. They are at the beginning of the transition and a similar set is installed on the right side of the transition. Work is being performed by Winston-Utah under Schedule I of above Specifications. H. E. Foss, photographer.",
          "caption": "Gravel Trap Sump",
          "link": "/digital/crbp/items/crbp1285.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "Gravel Trap Sump",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This photograph shows the gravel trap sump and the baffles with their drains very clearly. Flow is from upper right to lower left of the picture. The iron ladder steps for getting in and out of the open transition are shown in the lower right corner of the picture. They are at the beginning of the transition and a similar set is installed on the right side of the transition. Work is being performed by Winston-Utah under Schedule I of above Specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1250_sm.jpg",
          "alt": "Closeup of Guntert and Zimmerman trimmer being used by Winston-Utah on East Low Canal. Photograph taken especially for Popular Mechanics Magazine. Photographer: F. B. Pomeroy",
          "caption": "Heavy Machine And Man",
          "link": "/digital/crbp/items/crbp1250.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "30",
          "year": "1949"
        },
        "text": {
          "headline": "Heavy Machine And Man",
          "text": "Closeup of Guntert and Zimmerman trimmer being used by Winston-Utah on East Low Canal. Photograph taken especially for Popular Mechanics Magazine. Photographer: F. B. Pomeroy"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1261_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Placing concrete on the floor slap of the Winchester Wateway chute in the vicinity of station 21+00. In foreground workmen are placing the paving forms which serve as a base for the outside wall forms. Work is being performed by J.A. Tertling and Sons, Inc. under above Specifications. H.E. Foss, photographer",
          "caption": "Laying Concrete On The Floor Of Winchester Wasteway",
          "link": "/digital/crbp/items/crbp1261.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "08",
          "year": "1950"
        },
        "text": {
          "headline": "Laying Concrete On The Floor Of Winchester Wasteway",
          "text": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Placing concrete on the floor slap of the Winchester Wateway chute in the vicinity of station 21+00. In foreground workmen are placing the paving forms which serve as a base for the outside wall forms. Work is being performed by J.A. Tertling and Sons, Inc. under above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1257_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. 2nd Section, West Canal, Specs. 2541. The liner moving along the left main bank east of Soap Lake at about station 369. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of the above Specifications. H.E. Foss, photographer.",
          "caption": "Liner Moving Along The Bank",
          "link": "/digital/crbp/items/crbp1257.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "13",
          "year": "1950"
        },
        "text": {
          "headline": "Liner Moving Along The Bank",
          "text": "Columbia Basin Project, Irrigation Division. 2nd Section, West Canal, Specs. 2541. The liner moving along the left main bank east of Soap Lake at about station 369. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of the above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1266_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Guntert and Zimmerman lining machine in operation. At the right are the two tractor-propelled mixers which serve the paver. A truck is dumping aggregates and cement in the hopper of the mixer. Photo by F.B. Pomeroy",
          "caption": "Lining Machine In Operation",
          "link": "/digital/crbp/items/crbp1266.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1950"
        },
        "text": {
          "headline": "Lining Machine In Operation",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Guntert and Zimmerman lining machine in operation. At the right are the two tractor-propelled mixers which serve the paver. A truck is dumping aggregates and cement in the hopper of the mixer. Photo by F.B. Pomeroy"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1279_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Lining the canal through the city of Ephrata at about Station 757. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Lining The Canal, Ephrata In The Background",
          "link": "/digital/crbp/items/crbp1279.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "19",
          "year": "1948"
        },
        "text": {
          "headline": "Lining The Canal, Ephrata In The Background",
          "text": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Lining the canal through the city of Ephrata at about Station 757. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1347_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking across the canal at the completed drain inlet at station 1175+44. Work is being performed by Morrison, Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer",
          "caption": "Looking Across The Canal At Complete Drain Inlet",
          "link": "/digital/crbp/items/crbp1347.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Looking Across The Canal At Complete Drain Inlet",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking across the canal at the completed drain inlet at station 1175+44. Work is being performed by Morrison, Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1282_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking upstream at the completed lining from the Baily Bridge at Ephrata. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer",
          "caption": "Looking Upstream At Completed Lining",
          "link": "/digital/crbp/items/crbp1282.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "03",
          "year": "1950"
        },
        "text": {
          "headline": "Looking Upstream At Completed Lining",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Looking upstream at the completed lining from the Baily Bridge at Ephrata. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1293_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. The General Electric dry film thickness gage is being used to ascertain that the completed coal-tar enamel coating thickness conforms to specification requirements of 1/16 to 1/8 inch. This work is being performed by Walter Ferem Company, Los Angeles, sub-contractor for Winston-Utah under Schedule II of the above specifications. H. E. Foss, photographer",
          "caption": "Man Inspects Soap Lake Siphon",
          "link": "/digital/crbp/items/crbp1293.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "17",
          "year": "1950"
        },
        "text": {
          "headline": "Man Inspects Soap Lake Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. The General Electric dry film thickness gage is being used to ascertain that the completed coal-tar enamel coating thickness conforms to specification requirements of 1/16 to 1/8 inch. This work is being performed by Walter Ferem Company, Los Angeles, sub-contractor for Winston-Utah under Schedule II of the above specifications. H. E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1349_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal. Spec. # 1286--Utah construction Co. and Winston Bros. Co. Contractor. Close up view of concrete bucket used in placing of concrete in canal lining in Section 3. Immediately after concrete is dumped from the bucket the surface is leveled with a mechanical screed. A. W. Bauman, photographer.",
          "caption": "Man Negotiates Concrete Bucket",
          "link": "/digital/crbp/items/crbp1349.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "17",
          "year": "1947"
        },
        "text": {
          "headline": "Man Negotiates Concrete Bucket",
          "text": "Columbia Basin Project, Irrigation Division, West Canal. Spec. # 1286--Utah construction Co. and Winston Bros. Co. Contractor. Close up view of concrete bucket used in placing of concrete in canal lining in Section 3. Immediately after concrete is dumped from the bucket the surface is leveled with a mechanical screed. A. W. Bauman, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1292_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal Second Station, Specifications No. 2541. Morrison Knudsen Company Inc., contractor. Making field control tests for entrained air in canal lining concrete using a Press-Ur-Meter type air meter of 1/4 cubic foot capacity. H.E. Foss, photographer",
          "caption": "Man Tests Canal Lining",
          "link": "/digital/crbp/items/crbp1292.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "17",
          "year": "1950"
        },
        "text": {
          "headline": "Man Tests Canal Lining",
          "text": "Columbia Basin Project, Irrigation Division, West Canal Second Station, Specifications No. 2541. Morrison Knudsen Company Inc., contractor. Making field control tests for entrained air in canal lining concrete using a Press-Ur-Meter type air meter of 1/4 cubic foot capacity. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1271_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Concrete finisher troweling the curb at the top edge of the lining with a specially shaped tool. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer",
          "caption": "Man Trowels The Curb On The Top Of The Canal",
          "link": "/digital/crbp/items/crbp1271.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "03",
          "year": "1950"
        },
        "text": {
          "headline": "Man Trowels The Curb On The Top Of The Canal",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Concrete finisher troweling the curb at the top edge of the lining with a specially shaped tool. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1346_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation division. Majestic joint filler being placed in transverse joint during lining operations on West Canal. Majestic joint filler and white pigmented curing compound application is handled from this jumbo which travels on the same track used by the lining machine. H.E. Foss, photographer",
          "caption": "Man Working The Joint Filler",
          "link": "/digital/crbp/items/crbp1346.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "22",
          "year": "1948"
        },
        "text": {
          "headline": "Man Working The Joint Filler",
          "text": "Columbia Basin Project--Irrigation division. Majestic joint filler being placed in transverse joint during lining operations on West Canal. Majestic joint filler and white pigmented curing compound application is handled from this jumbo which travels on the same track used by the lining machine. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1256_sm.jpg",
          "alt": "Columbia Basin project, Irrigation division, Main Canal, Specifications No. 2324, Western Contracting Corporation contractors. Rolling compacted cushion on 1st slope of main canal densities have been obtained with from six to eight passes on a 4 inch thick lift. Harold Foss, photographer.",
          "caption": "Manual Sloping",
          "link": "/digital/crbp/items/crbp1256.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "19",
          "year": "1949"
        },
        "text": {
          "headline": "Manual Sloping",
          "text": "Columbia Basin project, Irrigation division, Main Canal, Specifications No. 2324, Western Contracting Corporation contractors. Rolling compacted cushion on 1st slope of main canal densities have been obtained with from six to eight passes on a 4 inch thick lift. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1270_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Workman in the foreground is applying white pigmented curing compound. The two men on the platform in the bottom of the ditch are filling grooves with mastic. The man on the platform near the center of the machine controls the travel of the curing jumbo. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Men Apply Curing Compounds To The Canal",
          "link": "/digital/crbp/items/crbp1270.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "03",
          "year": "1950"
        },
        "text": {
          "headline": "Men Apply Curing Compounds To The Canal",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Workman in the foreground is applying white pigmented curing compound. The two men on the platform in the bottom of the ditch are filling grooves with mastic. The man on the platform near the center of the machine controls the travel of the curing jumbo. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1278_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Close-up view of some of the lining operation. Looking down on the lining as it appears at the rear of the lining machine. Very little hand troweling is required. The finishers place wood slats in the grooves, cut by the lining machine, to keep them from closing up before they are finally finished up as shown. H.E. Foss, photographer",
          "caption": "Men Working On The Rear Of The Lining Machine",
          "link": "/digital/crbp/items/crbp1278.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "26",
          "year": "1948"
        },
        "text": {
          "headline": "Men Working On The Rear Of The Lining Machine",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Close-up view of some of the lining operation. Looking down on the lining as it appears at the rear of the lining machine. Very little hand troweling is required. The finishers place wood slats in the grooves, cut by the lining machine, to keep them from closing up before they are finally finished up as shown. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1287_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section, West Canal, Specs. 2541. Moving the lining machine from the west to the east side of Soap Lake. The man walking behind the liner is pointing at the vibrating tube. Directly to the right, the vibrator is the slip form, then the press plate to which the longitudinal groove outers are attached. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer.",
          "caption": "Moving The Lining Machine",
          "link": "/digital/crbp/items/crbp1287.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "13",
          "year": "1950"
        },
        "text": {
          "headline": "Moving The Lining Machine",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section, West Canal, Specs. 2541. Moving the lining machine from the west to the east side of Soap Lake. The man walking behind the liner is pointing at the vibrating tube. Directly to the right, the vibrator is the slip form, then the press plate to which the longitudinal groove outers are attached. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1258_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. Contractor. View of canal section, looking east from station 256, shows rock drilled and loaded and nearly ready for shooting. Located approx. 2 miles east of Soap Lake, Wash. Taken by request of F.S. Arnold, resident engineer, for record purposes.",
          "caption": "Preparing For Blast",
          "link": "/digital/crbp/items/crbp1258.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "05",
          "year": "1946"
        },
        "text": {
          "headline": "Preparing For Blast",
          "text": "Columbia Basin Project, Irrigation Division. West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. Contractor. View of canal section, looking east from station 256, shows rock drilled and loaded and nearly ready for shooting. Located approx. 2 miles east of Soap Lake, Wash. Taken by request of F.S. Arnold, resident engineer, for record purposes."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1265_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Reinforcing steel crew at work, aided by truck-mounted crane on jumbo. Bridge of jumbo is a war-surplus Baily Bridge. Photo by F.B. Pomeroy.",
          "caption": "Reinforcing Steel Crew At Work",
          "link": "/digital/crbp/items/crbp1265.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "Reinforcing Steel Crew At Work",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Reinforcing steel crew at work, aided by truck-mounted crane on jumbo. Bridge of jumbo is a war-surplus Baily Bridge. Photo by F.B. Pomeroy."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1259_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bucyrus-Erie 51-B dragline and dozer removing snow from the canal at about station 1155. Note the size of the blocks of snow as compared with the man and the dozer in the canal. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer",
          "caption": "Removing Snow From The Canal",
          "link": "/digital/crbp/items/crbp1259.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "24",
          "year": "1950"
        },
        "text": {
          "headline": "Removing Snow From The Canal",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Bucyrus-Erie 51-B dragline and dozer removing snow from the canal at about station 1155. Note the size of the blocks of snow as compared with the man and the dozer in the canal. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1343_sm.jpg",
          "alt": "View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond prior to being permanently transferred to a second pond because of leakage. Depth of water in pictures is about 3 inches. Marks showing normal 3-foot depth can be seen on the posts below the numbers. White deposits on posts are alkali deposits. Note serious deterioration of specimens of batches 55, 56, 57, 58, 59, 60, 61, 62, and 64. Behind platform are fresh water specimens from the second pond stored on the ground during the interchange of specimens.",
          "caption": "Testing Concrete",
          "link": "/digital/crbp/items/crbp1343.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "18",
          "year": "1949"
        },
        "text": {
          "headline": "Testing Concrete",
          "text": "View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond prior to being permanently transferred to a second pond because of leakage. Depth of water in pictures is about 3 inches. Marks showing normal 3-foot depth can be seen on the posts below the numbers. White deposits on posts are alkali deposits. Note serious deterioration of specimens of batches 55, 56, 57, 58, 59, 60, 61, 62, and 64. Behind platform are fresh water specimens from the second pond stored on the ground during the interchange of specimens."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1263_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. This photograph shows the sump of the gravel trap and the partially constructed open inlet transition. The gap between the concrete and the circular re-steel is the location of the closed inlet transition. Work is performed by Winston Utah under Schedule I of the above specifications. H. E. Foss, photographer.",
          "caption": "The Sump Of The Gravel Trap",
          "link": "/digital/crbp/items/crbp1263.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "The Sump Of The Gravel Trap",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. This photograph shows the sump of the gravel trap and the partially constructed open inlet transition. The gap between the concrete and the circular re-steel is the location of the closed inlet transition. Work is performed by Winston Utah under Schedule I of the above specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1281_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Photo of top deck of trimmer taken from the stacker belt. Shows power units, welding equipment, etc. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Top Deck Of Trimmer",
          "link": "/digital/crbp/items/crbp1281.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Top Deck Of Trimmer",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Photo of top deck of trimmer taken from the stacker belt. Shows power units, welding equipment, etc. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1251_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Canal trimmer, build by Guntert and Zimmerman for the contractor. Lining machine is setting behind the trimmer. Roller in the foreground is a Hyster grid roller used to roll the blanket material on the slopes. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer",
          "caption": "Trimmer And Lining Machine",
          "link": "/digital/crbp/items/crbp1251.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "10",
          "year": "1950"
        },
        "text": {
          "headline": "Trimmer And Lining Machine",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Canal trimmer, build by Guntert and Zimmerman for the contractor. Lining machine is setting behind the trimmer. Roller in the foreground is a Hyster grid roller used to roll the blanket material on the slopes. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of the above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1255_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. 2nd Section West Canal, Specs. 2541. Trimmer at about sta. 366+00. Soap Lake in the background. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer.",
          "caption": "Trimmer In Operation",
          "link": "/digital/crbp/items/crbp1255.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "18",
          "year": "1950"
        },
        "text": {
          "headline": "Trimmer In Operation",
          "text": "Columbia Basin Project, Irrigation Division. 2nd Section West Canal, Specs. 2541. Trimmer at about sta. 366+00. Soap Lake in the background. Work is being performed by Morrison-Knudsen, Inc. under Schedule 1 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1260_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Mixer truck discharging concrete into a 'laydown type' bucket during the first concrete pour in the chute and stilling pool section in the vicinity of Sta. 38+00. The concrete is manufactured in Ephrata, approximately 9 1/2 miles distance. Work is being performed by J. A. Tertling and Sons, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer",
          "caption": "Truck Pouring Concrete",
          "link": "/digital/crbp/items/crbp1260.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "10",
          "year": "1950"
        },
        "text": {
          "headline": "Truck Pouring Concrete",
          "text": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Mixer truck discharging concrete into a 'laydown type' bucket during the first concrete pour in the chute and stilling pool section in the vicinity of Sta. 38+00. The concrete is manufactured in Ephrata, approximately 9 1/2 miles distance. Work is being performed by J. A. Tertling and Sons, Inc. under Schedule 2 of above Specifications. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1284_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Photo of highway crossing at station 666+76 looking south, downstream. The maximum water surface in reservoir, which is located upstream from this structure, is 10 feet above the invert of the culverts. A pair of 5' x 6' gates will be installed to regulate the surface elevation of the water in the reservoir and the flow of [it] through the culvert. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 2 of above Specifications. H. E. Foss, photographer.",
          "caption": "Two Men Inspect Culverts",
          "link": "/digital/crbp/items/crbp1284.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Two Men Inspect Culverts",
          "text": "Columbia Basin Project, Irrigation Division, Winchester Wasteway, Specs. 2648. Photo of highway crossing at station 666+76 looking south, downstream. The maximum water surface in reservoir, which is located upstream from this structure, is 10 feet above the invert of the culverts. A pair of 5' x 6' gates will be installed to regulate the surface elevation of the water in the reservoir and the flow of [it] through the culvert. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 2 of above Specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1280_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Diamond drill crew taking a sample of the lining for visual inspection of the concrete and grooves. Work is being performed by government forces from Coulee Dam. H.E. Foss, photographer.",
          "caption": "Two Men Use Diamond Drill On Lining",
          "link": "/digital/crbp/items/crbp1280.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "Two Men Use Diamond Drill On Lining",
          "text": "Columbia Basin Project--Irrigation Division, 2nd Section West Canal, Specs. 2541. Diamond drill crew taking a sample of the lining for visual inspection of the concrete and grooves. Work is being performed by government forces from Coulee Dam. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1264_sm.jpg",
          "alt": "West Canal, Specs. 1286, Winston-Utah Co. Welder finishing joints on reinforcing steel. Photo by F.B. Pomeroy.",
          "caption": "Welder Finishing Joints",
          "link": "/digital/crbp/items/crbp1264.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "07",
          "year": "1948"
        },
        "text": {
          "headline": "Welder Finishing Joints",
          "text": "West Canal, Specs. 1286, Winston-Utah Co. Welder finishing joints on reinforcing steel. Photo by F.B. Pomeroy."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp909_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, O'Sullivan Dam. Aerial view looking west, shows dam between stations 60+00 at extreme left and station 196+00 at lower right. The area seen above the dam will be largely covered when the water behind the dam is operation level. H.E. Foss, photographer.",
          "caption": "Aerial View Of O'Sullivan Dam",
          "link": "/digital/crbp/items/crbp909.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "31",
          "year": "1950"
        },
        "text": {
          "headline": "Aerial View Of O'Sullivan Dam",
          "text": "Columbia Basin Project, Irrigation Division, O'Sullivan Dam. Aerial view looking west, shows dam between stations 60+00 at extreme left and station 196+00 at lower right. The area seen above the dam will be largely covered when the water behind the dam is operation level. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp940_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View of the Headworks structure taken from the left canal bank opposite station 755+00 looking upstream and showing start of backfill work behind the outlet warp transition. Backfill material is loaded into trucks by the crane in the background and hauled to the point where the truck is unloading. The dirt is spread in place by hand and compacted with air-tampers. The white floor slab at the left of the picture was placed on March 27, 1950. Work is being performed by George B. Henly Construction So., Inc. under Schedule I of above specifications. H.E. Foss, photographer.",
          "caption": "Backfill Work",
          "link": "/digital/crbp/items/crbp940.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Backfill Work",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Headworks, Specs. 2324. View of the Headworks structure taken from the left canal bank opposite station 755+00 looking upstream and showing start of backfill work behind the outlet warp transition. Backfill material is loaded into trucks by the crane in the background and hauled to the point where the truck is unloading. The dirt is spread in place by hand and compacted with air-tampers. The white floor slab at the left of the picture was placed on March 27, 1950. Work is being performed by George B. Henly Construction So., Inc. under Schedule I of above specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp915_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. Bending reinforcing bars for Dry Coulee",
          "caption": "Bending Reinforcement Bars",
          "link": "/digital/crbp/items/crbp915.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "26",
          "year": "1947"
        },
        "text": {
          "headline": "Bending Reinforcement Bars",
          "text": "Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. Bending reinforcing bars for Dry Coulee"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp981_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal, 1st Section, Specs. 1422. Aerial photo, showing general view of Broken Rock Siphon #1 and check, and typical surrounding area.",
          "caption": "Broken Rock Siphon",
          "link": "/digital/crbp/items/crbp981.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "31",
          "year": "1950"
        },
        "text": {
          "headline": "Broken Rock Siphon",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal, 1st Section, Specs. 1422. Aerial photo, showing general view of Broken Rock Siphon #1 and check, and typical surrounding area."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp929_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, West Canal, Second Section. Contractor: Morrison-Knudsen Company, Inc. Bulldozer pushing material into final position in stockpile produced by M.E. Nelson Construction Company, subcontractor furnishing the gravel for concrete. This material will be rescreened by the subcontractor prior to batching. Note top of batching plant beyond the stockpile. H. E. Foss, photographer",
          "caption": "Bulldozer Pushing Material Into Position",
          "link": "/digital/crbp/items/crbp929.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "Bulldozer Pushing Material Into Position",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, West Canal, Second Section. Contractor: Morrison-Knudsen Company, Inc. Bulldozer pushing material into final position in stockpile produced by M.E. Nelson Construction Company, subcontractor furnishing the gravel for concrete. This material will be rescreened by the subcontractor prior to batching. Note top of batching plant beyond the stockpile. H. E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp907_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 1401, Long Lake Dam, Contractor: J.A. Terteling and Sons, Inc. A view of the completed dam from the east abutment. Long Lake Dam is 2 miles northeast of Stratford, Wa. Harold Foss, photographer.",
          "caption": "Completed Long Lake Dam",
          "link": "/digital/crbp/items/crbp907.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "11",
          "year": "1949"
        },
        "text": {
          "headline": "Completed Long Lake Dam",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 1401, Long Lake Dam, Contractor: J.A. Terteling and Sons, Inc. A view of the completed dam from the east abutment. Long Lake Dam is 2 miles northeast of Stratford, Wa. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp930_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, West Canal, Second Section. Contractor: Morrison-Knudsen Inc. View shows construction of bins and rescreening plant installed by subcontractor M.E. Nelson Construction Company with prime contractor's batching plant in the background. Materials rescreened are stored in the timber bins and fed through gates in the bottom onto conveyor belt in tunnel. Sloping sides have been constructed within the bins to eliminate dead storage space.",
          "caption": "Construction Of Bins And Rescreening Plant",
          "link": "/digital/crbp/items/crbp930.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "Construction Of Bins And Rescreening Plant",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, West Canal, Second Section. Contractor: Morrison-Knudsen Inc. View shows construction of bins and rescreening plant installed by subcontractor M.E. Nelson Construction Company with prime contractor's batching plant in the background. Materials rescreened are stored in the timber bins and fed through gates in the bottom onto conveyor belt in tunnel. Sloping sides have been constructed within the bins to eliminate dead storage space."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp906_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Dam, Spec. #1401, J.A. Terteling and Sons, contractor. Long Lake Dam 169 days after start of construction. Long Lake Dam is two miles northeast of Stratford, Washington. A.W. Bauman, photographer.",
          "caption": "Days After Construction Begins On Long Lake Dam",
          "link": "/digital/crbp/items/crbp906.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "14",
          "year": "1947"
        },
        "text": {
          "headline": "Days After Construction Begins On Long Lake Dam",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Dam, Spec. #1401, J.A. Terteling and Sons, contractor. Long Lake Dam 169 days after start of construction. Long Lake Dam is two miles northeast of Stratford, Washington. A.W. Bauman, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp924_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is being performed by Western Contracting Corporation under Schedule #2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Defective Concrete [01]",
          "link": "/digital/crbp/items/crbp924.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "31",
          "year": "1950"
        },
        "text": {
          "headline": "Defective Concrete [01]",
          "text": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is being performed by Western Contracting Corporation under Schedule #2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp923_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is being performed by Western Contracting Corporation under Schedule #2 of above Specifications. H.E. Foss, photographer.",
          "caption": "Defective Concrete [02]",
          "link": "/digital/crbp/items/crbp923.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "31",
          "year": "1950"
        },
        "text": {
          "headline": "Defective Concrete [02]",
          "text": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal, Specs. 2879. Defective concrete removed on pin bearings, Weber Wasteway Turnout Sta. 1951+00, East Low Canal. Anchor bolts welded to re-steel for additional strength. Work is being performed by Western Contracting Corporation under Schedule #2 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp936_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking west into open outlet transition of Dry Coulee Siphon No. 2. The forms are warped from vertical to 1:1 slope on a 40-degree curve. H.E. Foss, photographer",
          "caption": "Dry Coulee Siphon",
          "link": "/digital/crbp/items/crbp936.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "28",
          "year": "1948"
        },
        "text": {
          "headline": "Dry Coulee Siphon",
          "text": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking west into open outlet transition of Dry Coulee Siphon No. 2. The forms are warped from vertical to 1:1 slope on a 40-degree curve. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp953_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph shows the left berm of the open outlet transition being excavated to original ground, preparatory to the placing of compacted backfill against the sides of the open outlet transition. Concrete is placed from the beginning of the open inlet transition, Station 510+50 to the end of the last buttress, Station 511+10. When compacted backfill is in place and the slope replaced from Station 511+10 to 511+35 the uniformed bottom and sides will be concreted between the above two stations. The work is being performed by Winston-Utah under Schedule I of the above specifications. H. E. Foss, photographer.",
          "caption": "Excavation For The Left Berm Of The Open Outlet Transition",
          "link": "/digital/crbp/items/crbp953.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "31",
          "year": "1950"
        },
        "text": {
          "headline": "Excavation For The Left Berm Of The Open Outlet Transition",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph shows the left berm of the open outlet transition being excavated to original ground, preparatory to the placing of compacted backfill against the sides of the open outlet transition. Concrete is placed from the beginning of the open inlet transition, Station 510+50 to the end of the last buttress, Station 511+10. When compacted backfill is in place and the slope replaced from Station 511+10 to 511+35 the uniformed bottom and sides will be concreted between the above two stations. The work is being performed by Winston-Utah under Schedule I of the above specifications. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp914_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View of flash-pressure welding machine in operation, welding 1-3/4' square reinforcing hoop. A.W. Bauman, photographer.",
          "caption": "Flash-Pressure Welding Machine",
          "link": "/digital/crbp/items/crbp914.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1947"
        },
        "text": {
          "headline": "Flash-Pressure Welding Machine",
          "text": "Columbia Basin Project, Irrigation Division, West Canal. Spec. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View of flash-pressure welding machine in operation, welding 1-3/4' square reinforcing hoop. A.W. Bauman, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp917_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. View of equipment used by contractor Winston-Utah Construction Company to charge overhead aggregate bins at Adco batching plant. Truck is dumping 1 1/2' gravel from Adrian gravel plant into wooden bin equipped with sprinklers. Conveyor belt runs through tunnel under four bins, enabling operator to charge any size aggregate bins (see August report--photo No. 2006-4). Note bulk cement cars on railroad spur",
          "caption": "Gravel Dumping And Conveyor Belt",
          "link": "/digital/crbp/items/crbp917.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1948"
        },
        "text": {
          "headline": "Gravel Dumping And Conveyor Belt",
          "text": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. View of equipment used by contractor Winston-Utah Construction Company to charge overhead aggregate bins at Adco batching plant. Truck is dumping 1 1/2' gravel from Adrian gravel plant into wooden bin equipped with sprinklers. Conveyor belt runs through tunnel under four bins, enabling operator to charge any size aggregate bins (see August report--photo No. 2006-4). Note bulk cement cars on railroad spur"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp921_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. East Low Canal, Specifications #1422. View shows inspector making slump test on canal lining concrete. Remaining concrete in wheelbarrow will be used to make concrete cylinders, yield and air entrainment tests. Bucket of water and brush in foreground are used to wash test equipment",
          "caption": "Inspecting The Canal Lining",
          "link": "/digital/crbp/items/crbp921.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "05",
          "year": "1948"
        },
        "text": {
          "headline": "Inspecting The Canal Lining",
          "text": "Columbia Basin Project--Irrigation Division. East Low Canal, Specifications #1422. View shows inspector making slump test on canal lining concrete. Remaining concrete in wheelbarrow will be used to make concrete cylinders, yield and air entrainment tests. Bucket of water and brush in foreground are used to wash test equipment"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp922_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Assistant Resident Engineer, Donald B. McLaren checking fill moisture by the use of a proctor plasticity penetrometer. Representative material from the spread and processed lift is obtained, given standard laboratory compaction and resistance to penetration of a needle of definite end area is measured. A resistance to penetration range from 1000 to 2000 pounds per square inch indicates that the material contains the proper moisture for compaction. A needle reading less than 1000 pounds per square inch indicates that material is too wet and must be dried out by processing or mixing with drier material. A needle reading greater than 2000 pounds per square inch indicates that the material is too dry and moisture must be added. Harold Foss, photographer.",
          "caption": "Inspecting The Moisture Of Lining Concrete",
          "link": "/digital/crbp/items/crbp922.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "24",
          "year": "1948"
        },
        "text": {
          "headline": "Inspecting The Moisture Of Lining Concrete",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Assistant Resident Engineer, Donald B. McLaren checking fill moisture by the use of a proctor plasticity penetrometer. Representative material from the spread and processed lift is obtained, given standard laboratory compaction and resistance to penetration of a needle of definite end area is measured. A resistance to penetration range from 1000 to 2000 pounds per square inch indicates that the material contains the proper moisture for compaction. A needle reading less than 1000 pounds per square inch indicates that material is too wet and must be dried out by processing or mixing with drier material. A needle reading greater than 2000 pounds per square inch indicates that the material is too dry and moisture must be added. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp931_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure during concrete placing in the outlet counterfort warped wall right side. Concrete is placed from the concrete bucket to small chutes in front of each counterfort. Long Lake Headworks is 2 miles northeast of Stratford, Wash.",
          "caption": "Laying Concrete For Long Lake Dam",
          "link": "/digital/crbp/items/crbp931.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Laying Concrete For Long Lake Dam",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure during concrete placing in the outlet counterfort warped wall right side. Concrete is placed from the concrete bucket to small chutes in front of each counterfort. Long Lake Headworks is 2 miles northeast of Stratford, Wash."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp905_sm.jpg",
          "alt": "Photo of Long Lake Dam taken for display purposes",
          "caption": "Long Lake Dam",
          "link": "/digital/crbp/items/crbp905.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "06",
          "year": "1949"
        },
        "text": {
          "headline": "Long Lake Dam",
          "text": "Photo of Long Lake Dam taken for display purposes"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp908_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station745+80 to Station 1101 +29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. View of inlet floor slab Long Lake Headworks and men working on inlet counterfort warped wall forms. Counterfort forms are shown on the extreme right. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer.",
          "caption": "Long Lake Dam Headworks",
          "link": "/digital/crbp/items/crbp908.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Long Lake Dam Headworks",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station745+80 to Station 1101 +29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. View of inlet floor slab Long Lake Headworks and men working on inlet counterfort warped wall forms. Counterfort forms are shown on the extreme right. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp979_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure taken from left bank of intake channel looking southwest across the operation deck and service bridge. Reinforcement steel for the operation deck and electrical conduit and ground wires are in place ready for concrete. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer.",
          "caption": "Long Lake Headworks During Concrete Placing [01]",
          "link": "/digital/crbp/items/crbp979.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Long Lake Headworks During Concrete Placing [01]",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks structure taken from left bank of intake channel looking southwest across the operation deck and service bridge. Reinforcement steel for the operation deck and electrical conduit and ground wires are in place ready for concrete. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp935_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks during concrete placing operations in the right outlet warp wall. Concrete is being placed in tremies which allow the concrete to be deposited in the counterforts back of the wall. Men in foreground with Klug Construction Co. hand trimming canal section for lining. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer.",
          "caption": "Long Lake Headworks During Concrete Placing [02]",
          "link": "/digital/crbp/items/crbp935.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Long Lake Headworks During Concrete Placing [02]",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule I, Long Lake Headworks and Concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Contractor: George B. Henly Construction Co., Inc. View of Long Lake Headworks during concrete placing operations in the right outlet warp wall. Concrete is being placed in tremies which allow the concrete to be deposited in the counterforts back of the wall. Men in foreground with Klug Construction Co. hand trimming canal section for lining. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp937_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Third Section, West Canal, Specification 2844, Schedule 3. View looking upstream from invert of stilling pool at Station 2044+50 West Canal approximately, showing end of concrete chute at Station 2043+20. The stilling pool was excavated from a columnar basalt rock formation. Minnis and Schilling--Contractor. H.E. Foss, photographer",
          "caption": "Man Stands In Concrete Chute",
          "link": "/digital/crbp/items/crbp937.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "Man Stands In Concrete Chute",
          "text": "Columbia Basin Project, Irrigation Division, Third Section, West Canal, Specification 2844, Schedule 3. View looking upstream from invert of stilling pool at Station 2044+50 West Canal approximately, showing end of concrete chute at Station 2043+20. The stilling pool was excavated from a columnar basalt rock formation. Minnis and Schilling--Contractor. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp910_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co., and Winston Bros. Co., Contractor. Using a Jackson electric vibrator to place compacted backfill at the lateral turnout, Station 163+25. The material being compacted is sent with very little gravel. The vibrator did not work satisfactorily in this particular material.",
          "caption": "Men Compact Backfill",
          "link": "/digital/crbp/items/crbp910.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "25",
          "year": "1949"
        },
        "text": {
          "headline": "Men Compact Backfill",
          "text": "Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co., and Winston Bros. Co., Contractor. Using a Jackson electric vibrator to place compacted backfill at the lateral turnout, Station 163+25. The material being compacted is sent with very little gravel. The vibrator did not work satisfactorily in this particular material."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp920_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. East Low Canal--Specifications No. 1422. View of mobile laboratory used to make test cylinders and air entrainment tests of canal lining concrete. Equipment shown includes half-cubic foot unit weight measure, electric vibrator, scale, and gasoline-powered generator. In left foreground is covered box where test cylinders are stored until picked up on the following day. Cylinders from previous day's test may be seen in ambulance used for transportation. H.E. Foss, photographer.",
          "caption": "Mobile Laboratory",
          "link": "/digital/crbp/items/crbp920.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1948"
        },
        "text": {
          "headline": "Mobile Laboratory",
          "text": "Columbia Basin Project--Irrigation Division. East Low Canal--Specifications No. 1422. View of mobile laboratory used to make test cylinders and air entrainment tests of canal lining concrete. Equipment shown includes half-cubic foot unit weight measure, electric vibrator, scale, and gasoline-powered generator. In left foreground is covered box where test cylinders are stored until picked up on the following day. Cylinders from previous day's test may be seen in ambulance used for transportation. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp938_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., contractor. Open outlet transition of Dry Coulee Siphon No. 2 showing back forms. Transition warps from vertical with a 25-foot bottom to a light slope with a 38-foot bottom on a 40 degree curve. Openings in the forms are for buttresses. Canal lining shows in the foreground. H.E. Foss, photographer.",
          "caption": "Open Outlet Transition Of Dry Coulee Siphon",
          "link": "/digital/crbp/items/crbp938.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "24",
          "year": "1948"
        },
        "text": {
          "headline": "Open Outlet Transition Of Dry Coulee Siphon",
          "text": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., contractor. Open outlet transition of Dry Coulee Siphon No. 2 showing back forms. Transition warps from vertical with a 25-foot bottom to a light slope with a 38-foot bottom on a 40 degree curve. Openings in the forms are for buttresses. Canal lining shows in the foreground. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp980_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream from station 1992+45 showing placement of concrete at approximate Station 1993+40 and placement of reinforcement steel at approximate Station 1994+50 and road grader back can be seen in the contractor's field camp. *This patrol is fine grading the subgrade. Hinnin and Schilling--Contractor. H.E. Foss, photographer.",
          "caption": "Placing Concrete And Steel In Canal Lining",
          "link": "/digital/crbp/items/crbp980.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "04",
          "year": "1950"
        },
        "text": {
          "headline": "Placing Concrete And Steel In Canal Lining",
          "text": "Columbia Basin Project, Irrigation Division, Third Section West Canal, Specifications 2844, Schedule 3. Looking downstream from station 1992+45 showing placement of concrete at approximate Station 1993+40 and placement of reinforcement steel at approximate Station 1994+50 and road grader back can be seen in the contractor's field camp. *This patrol is fine grading the subgrade. Hinnin and Schilling--Contractor. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp928_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway, Specs. 2879. Forms and reinforcing steel for culvert, Weber Wasteway Sta. 88+97.28, under Chicago, Milwaukie, St. Paul and Pacific Railway. Shoofly in the background. View looking south. Work being done by Western Contracting Corporation. H.E. Foss, photographer.",
          "caption": "Reinforcing Steel For Weber Wasteway",
          "link": "/digital/crbp/items/crbp928.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Reinforcing Steel For Weber Wasteway",
          "text": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway, Specs. 2879. Forms and reinforcing steel for culvert, Weber Wasteway Sta. 88+97.28, under Chicago, Milwaukie, St. Paul and Pacific Railway. Shoofly in the background. View looking south. Work being done by Western Contracting Corporation. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp926_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway Turnout. Specifications No. 2879. Rock pockets caused by insufficient vibration. Note the reinforcing steel in the lower right corner of the photograph and the hole being chipped through a repair area at left. Work performed by Western Contracting Corporation.",
          "caption": "Rock Pockets",
          "link": "/digital/crbp/items/crbp926.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Rock Pockets",
          "text": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway Turnout. Specifications No. 2879. Rock pockets caused by insufficient vibration. Note the reinforcing steel in the lower right corner of the photograph and the hole being chipped through a repair area at left. Work performed by Western Contracting Corporation."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp927_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway Turnout Structure, Specifications No. 2879. Gate support showing rock pocket and exposed reinforcing steel prior to chipping. Inadequate vibration has resulted in numerous concrete repairs to be necessary in this structure. Concrete placed in subsequent structures have been free from rock pockets as more attention is given to correct placing methods. Work performed by Western Contracting Corporation. H.E. Foss, photographer.",
          "caption": "Rock Pockets And Exposed Reinforcing Steel",
          "link": "/digital/crbp/items/crbp927.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "22",
          "year": "1950"
        },
        "text": {
          "headline": "Rock Pockets And Exposed Reinforcing Steel",
          "text": "Columbia Basin Project, Irrigation Division, 3rd Section East Low Canal and Weber Wasteway Turnout Structure, Specifications No. 2879. Gate support showing rock pocket and exposed reinforcing steel prior to chipping. Inadequate vibration has resulted in numerous concrete repairs to be necessary in this structure. Concrete placed in subsequent structures have been free from rock pockets as more attention is given to correct placing methods. Work performed by Western Contracting Corporation. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp913_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. LaPlant-Choate rooter pulled by D-8 caterpillar tractor through cemented gravel at about Sta. 785. Only two outside ripper teeth are being used. Note difference in penetration of teeth, indicating varying hardness of deposit. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer.",
          "caption": "Rooter Pulled By Tractor Through Cemented Gravel",
          "link": "/digital/crbp/items/crbp913.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "20",
          "year": "1949"
        },
        "text": {
          "headline": "Rooter Pulled By Tractor Through Cemented Gravel",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. LaPlant-Choate rooter pulled by D-8 caterpillar tractor through cemented gravel at about Sta. 785. Only two outside ripper teeth are being used. Note difference in penetration of teeth, indicating varying hardness of deposit. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp916_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal. Sep. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View taken of a test weld. One test weld is made for every 50 production welds. This is then tested for yield point and tensile strength. A.W. Bauman, photographer.",
          "caption": "Test Weld",
          "link": "/digital/crbp/items/crbp916.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1947"
        },
        "text": {
          "headline": "Test Weld",
          "text": "Columbia Basin Project, Irrigation Division, West Canal. Sep. #1286--Utah Construction Co. and Winston Bros. Co. contractor. View taken of a test weld. One test weld is made for every 50 production welds. This is then tested for yield point and tensile strength. A.W. Bauman, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp968_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Backfilling around the Winchester Wasteway turnout. Allis Chalmers HD-5 tractor with Tractor-Loader is used to place material and to pull small roller used in areas inaccessible to the larger sheepsfoot rollers. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E.Foss, photographer.",
          "caption": "Use Of Smaller Tractors",
          "link": "/digital/crbp/items/crbp968.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "24",
          "year": "1950"
        },
        "text": {
          "headline": "Use Of Smaller Tractors",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section West Canal, Specs. 2541. Backfilling around the Winchester Wasteway turnout. Allis Chalmers HD-5 tractor with Tractor-Loader is used to place material and to pull small roller used in areas inaccessible to the larger sheepsfoot rollers. Work is being performed by Morrison-Knudsen, Inc. under Schedule 2 of above specifications. H.E.Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp918_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. View showing weighing equipment at Adco batching plant. Back of housing for cement scale dial and recorder tape are shown at right foreground. Portion of aggregate scale dial may be seen in right background. At left is screw conveyor from cement silo to cement weighing hopper in center of picture. Behind this hopper is the aggregate weighing hopper. H.E. Foss, photographer.",
          "caption": "Weighing Equipment",
          "link": "/digital/crbp/items/crbp918.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1948"
        },
        "text": {
          "headline": "Weighing Equipment",
          "text": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. View showing weighing equipment at Adco batching plant. Back of housing for cement scale dial and recorder tape are shown at right foreground. Portion of aggregate scale dial may be seen in right background. At left is screw conveyor from cement silo to cement weighing hopper in center of picture. Behind this hopper is the aggregate weighing hopper. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp919_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. Workman unloading bulk cement with Butler Car scoop. Job Hazards are minimized by the use of proper safety equipment. H.E. Foss, photographer.",
          "caption": "Workman Unloading Bulk Cement",
          "link": "/digital/crbp/items/crbp919.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1948"
        },
        "text": {
          "headline": "Workman Unloading Bulk Cement",
          "text": "Columbia Basin Project--Irrigation Division. West Canal and East Low Canal--Specifications 1286 and 1422. Workman unloading bulk cement with Butler Car scoop. Job Hazards are minimized by the use of proper safety equipment. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1039_sm.jpg",
          "alt": "Columbia Basin Project. Irrigation Division. Bacon Siphon, Specifications 1236, T.E. Connolly Inc., Contractor. Bacon Siphon and Main Canal looking upstream from top of cliff above inlet to the Bacon Tunnel. Canal is completed with inlet structure of the siphon yet to be done.",
          "caption": "Bacon Siphon And Main Canal",
          "link": "/digital/crbp/items/crbp1039.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "04",
          "year": "1949"
        },
        "text": {
          "headline": "Bacon Siphon And Main Canal",
          "text": "Columbia Basin Project. Irrigation Division. Bacon Siphon, Specifications 1236, T.E. Connolly Inc., Contractor. Bacon Siphon and Main Canal looking upstream from top of cliff above inlet to the Bacon Tunnel. Canal is completed with inlet structure of the siphon yet to be done."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1048_sm.jpg",
          "alt": "Crab Creek siphon. Photo shows workmen covering siphon in background and pouring the elbow in the foreground",
          "caption": "Crab Creek Siphon [01]",
          "link": "/digital/crbp/items/crbp1048.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "08",
          "year": "1948"
        },
        "text": {
          "headline": "Crab Creek Siphon [01]",
          "text": "Crab Creek siphon. Photo shows workmen covering siphon in background and pouring the elbow in the foreground"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1042_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Looking northeasterly over Crab Creek Siphon No. 1. Bifurcation works junction of Main, West, and East Low Canals is at the end of the siphon in left background. Fill over siphon beyond the form jumbo is crossing of P.S. Highway No. 7 Form stands at Section 95 and re-steel is in the place to Section 110 in foreground. Harold Foss, Photographer.",
          "caption": "Crab Creek Siphon [02]",
          "link": "/digital/crbp/items/crbp1042.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "30",
          "year": "1943"
        },
        "text": {
          "headline": "Crab Creek Siphon [02]",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications No. 1422--Utah Construction Co. and Winston Bros. Co., Contractor. Looking northeasterly over Crab Creek Siphon No. 1. Bifurcation works junction of Main, West, and East Low Canals is at the end of the siphon in left background. Fill over siphon beyond the form jumbo is crossing of P.S. Highway No. 7 Form stands at Section 95 and re-steel is in the place to Section 110 in foreground. Harold Foss, Photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1050_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co. and Winston Bros. Co., Contractor. Looking east along the west canal showing Dry Coulee Siphon No. 2 in the foreground, the section of 12-foot bottom lined canal, Dry Coulee Siphon No. 1 and another portion of the lined canal in the background. A portion of the warped open outlet transition is shown in the immediate foreground is a 40-degree curve. Also shown in the foreground is the reinforcing steel for the uncompleted portion of the siphon barrel and the siphon form in place over a completed standard 25-foot section of the siphon barrel. The forms for the closed inlet transition are under construction. The contractor's shops and offices are on the right of the canal section. H.E. Foss, photographer.",
          "caption": "Dry Coulee Siphon",
          "link": "/digital/crbp/items/crbp1050.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "25",
          "year": "1949"
        },
        "text": {
          "headline": "Dry Coulee Siphon",
          "text": "Columbia Basin Project, Irrigation Division, West Canal, Specifications 1286, Utah Construction Co. and Winston Bros. Co., Contractor. Looking east along the west canal showing Dry Coulee Siphon No. 2 in the foreground, the section of 12-foot bottom lined canal, Dry Coulee Siphon No. 1 and another portion of the lined canal in the background. A portion of the warped open outlet transition is shown in the immediate foreground is a 40-degree curve. Also shown in the foreground is the reinforcing steel for the uncompleted portion of the siphon barrel and the siphon form in place over a completed standard 25-foot section of the siphon barrel. The forms for the closed inlet transition are under construction. The contractor's shops and offices are on the right of the canal section. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1051_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specifications No. 2603. Job fabricated wood burning hot water heating plant set up at jobsite in preparation for cold weather control of concrete temperatures. Water is pumped through a circulating coil in the fire box. See photograph 4514-4 for detail on pump hook up. Work performed by J.A. Terteling and Sons, Inc., contractor. H.E. Foss, photographer",
          "caption": "Hot Water Heating Plant",
          "link": "/digital/crbp/items/crbp1051.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "02",
          "year": "1950"
        },
        "text": {
          "headline": "Hot Water Heating Plant",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specifications No. 2603. Job fabricated wood burning hot water heating plant set up at jobsite in preparation for cold weather control of concrete temperatures. Water is pumped through a circulating coil in the fire box. See photograph 4514-4 for detail on pump hook up. Work performed by J.A. Terteling and Sons, Inc., contractor. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1046_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros. Co., Contractor. This longitudinal view shows the outer curtain of re-steel. The liner curtain and 'liner' support staubs and channel iron. The 'liner' placing gantry--a liner section and the stiffener ring replacement jigs. H.E. Foss, photographer",
          "caption": "Interior Of The Liner",
          "link": "/digital/crbp/items/crbp1046.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "27",
          "year": "1949"
        },
        "text": {
          "headline": "Interior Of The Liner",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros. Co., Contractor. This longitudinal view shows the outer curtain of re-steel. The liner curtain and 'liner' support staubs and channel iron. The 'liner' placing gantry--a liner section and the stiffener ring replacement jigs. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1045_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, of the horizontal curve, P.I. Station 468+54.95. In the foreground are shown two of Humiston-Rosendhal's 'ferris wheels' used in making the field weld joining the liner sections. H.E. Foss, photographer.",
          "caption": "Joining The Liner Sections",
          "link": "/digital/crbp/items/crbp1045.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "05",
          "year": "1949"
        },
        "text": {
          "headline": "Joining The Liner Sections",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, of the horizontal curve, P.I. Station 468+54.95. In the foreground are shown two of Humiston-Rosendhal's 'ferris wheels' used in making the field weld joining the liner sections. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1047_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon. Lowering a \"can\" for placement in the steel-lined section of the Siphon (Schedule II).",
          "caption": "Lowering A \"Can\"",
          "link": "/digital/crbp/items/crbp1047.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "01",
          "year": "1949"
        },
        "text": {
          "headline": "Lowering A \"Can\"",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon. Lowering a \"can\" for placement in the steel-lined section of the Siphon (Schedule II)."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1040_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph taken from concrete section 84A, looking upstream, shows a man on section 82A. Infra-red was used to accentuate the cloud effect. Work is being performed by Winston-Utah under Schedule II of the above specs. H.E. Foss, photographer.",
          "caption": "Man Stands On Siphon",
          "link": "/digital/crbp/items/crbp1040.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "Man Stands On Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph taken from concrete section 84A, looking upstream, shows a man on section 82A. Infra-red was used to accentuate the cloud effect. Work is being performed by Winston-Utah under Schedule II of the above specs. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1044_sm.jpg",
          "alt": "Dry Coulee Siphon No. 1. --This overall photograph shows the cycle in placing concrete in Dry Coulee Siphon No. 1 by Winston-Utah. Nearest the camera is the first pour of concrete with the outside form removed and the inside form still in place. The outside form has been moved to the right preparatory to another pour. Reinforcing steel is in place farther to the right.",
          "caption": "Placing Concrete In Dry Coulee Siphon",
          "link": "/digital/crbp/items/crbp1044.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "17",
          "year": "1947"
        },
        "text": {
          "headline": "Placing Concrete In Dry Coulee Siphon",
          "text": "Dry Coulee Siphon No. 1. --This overall photograph shows the cycle in placing concrete in Dry Coulee Siphon No. 1 by Winston-Utah. Nearest the camera is the first pour of concrete with the outside form removed and the inside form still in place. The outside form has been moved to the right preparatory to another pour. Reinforcing steel is in place farther to the right."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1041_sm.jpg",
          "alt": "Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside shell for the concrete-placing cycle.",
          "caption": "Reinforcing Steel Being Placed",
          "link": "/digital/crbp/items/crbp1041.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "19",
          "year": "1947"
        },
        "text": {
          "headline": "Reinforcing Steel Being Placed",
          "text": "Winton-Utah Contract on West Canal under Specs. 1286. This view, looking east, shows (right to left) reinforcing steel being placed for Dry Coulee Siphon No. 1, the two invert forms, which fit inside the steel for placing concrete, and the outside shell for the concrete-placing cycle."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1052_sm.jpg",
          "alt": "This view shows the sand blasting operations on the exterior surface of the exposed section of the pumping plant discharge pipe #1 in preparation for painting the exterior surface. This work is being performed by Machinist, Inc., subcontractor of Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Specifications No. 2329.",
          "caption": "Sand Blasting Operations",
          "link": "/digital/crbp/items/crbp1052.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "02",
          "year": "1950"
        },
        "text": {
          "headline": "Sand Blasting Operations",
          "text": "This view shows the sand blasting operations on the exterior surface of the exposed section of the pumping plant discharge pipe #1 in preparation for painting the exterior surface. This work is being performed by Machinist, Inc., subcontractor of Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Specifications No. 2329."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1043_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is of the same area as photo No. 3220-04 but looking downstream. The men in the right foreground are placing the outer re-steel hoops. Curve P.I.= 468+54.95. H.E. Foss, photographer",
          "caption": "Soap Lake Siphon",
          "link": "/digital/crbp/items/crbp1043.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "06",
          "year": "1949"
        },
        "text": {
          "headline": "Soap Lake Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is of the same area as photo No. 3220-04 but looking downstream. The men in the right foreground are placing the outer re-steel hoops. Curve P.I.= 468+54.95. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1344_sm.jpg",
          "alt": "South Coulee Dam--A 16-yard Dixson Wagon Model #250 dumping Zone 1 material at station 20+00, approximate elevation 1570",
          "caption": "16-Yard Truck Dumping Material",
          "link": "/digital/crbp/items/crbp1344.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "23",
          "year": "1947"
        },
        "text": {
          "headline": "16-Yard Truck Dumping Material",
          "text": "South Coulee Dam--A 16-yard Dixson Wagon Model #250 dumping Zone 1 material at station 20+00, approximate elevation 1570"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1109_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Looking west at west abutment showing cut-off wall and rock fracture at Station 8+00. Long Lake Dam is two miles northeast of Stratford, Wash. Harold Foss, photographer.",
          "caption": "Abutment Cut-Off Wall",
          "link": "/digital/crbp/items/crbp1109.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "01",
          "year": "1947"
        },
        "text": {
          "headline": "Abutment Cut-Off Wall",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Looking west at west abutment showing cut-off wall and rock fracture at Station 8+00. Long Lake Dam is two miles northeast of Stratford, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1123_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Steel Construction Co. of Oregon, sub-contractor for J.A. Terteling and Sons. Blending machine operations. H.E. Foss, photographer.",
          "caption": "Blending Machine Operations",
          "link": "/digital/crbp/items/crbp1123.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Blending Machine Operations",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Steel Construction Co. of Oregon, sub-contractor for J.A. Terteling and Sons. Blending machine operations. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1119_sm.jpg",
          "alt": "South Coulee Dam--Cleanup placing operations on foundation, station 71+50 to 74+00. Narrow-drum roller is compacting Zone 1 and Zone 2 embankment upstream of cutoff wall. The dozer is preparing a ramp to facilitate cleanup work in inaccessible potholes downstream from centerline.",
          "caption": "Cleanup Operations",
          "link": "/digital/crbp/items/crbp1119.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "23",
          "year": "1947"
        },
        "text": {
          "headline": "Cleanup Operations",
          "text": "South Coulee Dam--Cleanup placing operations on foundation, station 71+50 to 74+00. Narrow-drum roller is compacting Zone 1 and Zone 2 embankment upstream of cutoff wall. The dozer is preparing a ramp to facilitate cleanup work in inaccessible potholes downstream from centerline."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1061_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at Sta. 941+00. Concrete placing is complete, some chipping and patching remain to be done. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer",
          "caption": "Completed Concrete Placing",
          "link": "/digital/crbp/items/crbp1061.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "17",
          "year": "1949"
        },
        "text": {
          "headline": "Completed Concrete Placing",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at Sta. 941+00. Concrete placing is complete, some chipping and patching remain to be done. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1056_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph from Station 382+, looking downstream, shows the completed gravel trap and open inlet transition. The gravel trap baffles and their drains are clearly shown. Work is performed by Winston-Utah under Schedule I of the above specifications. H.E. Foss, photographer.",
          "caption": "Completed Open Inlet Transition",
          "link": "/digital/crbp/items/crbp1056.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "21",
          "year": "1950"
        },
        "text": {
          "headline": "Completed Open Inlet Transition",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs. 2411. This photograph from Station 382+, looking downstream, shows the completed gravel trap and open inlet transition. The gravel trap baffles and their drains are clearly shown. Work is performed by Winston-Utah under Schedule I of the above specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1069_sm.jpg",
          "alt": "Columbia Basin Project. Irrigation Division, Bacon Tunnel, Specifications 1236, T.R. Connolly, Inc., Contractors. Looking upstream at the outlet portal of Bacon Tunnel portal structure and open transition is complete except for backfilling and cleaning up operations",
          "caption": "Entrance To Bacon Tunnel",
          "link": "/digital/crbp/items/crbp1069.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "22",
          "year": "1948"
        },
        "text": {
          "headline": "Entrance To Bacon Tunnel",
          "text": "Columbia Basin Project. Irrigation Division, Bacon Tunnel, Specifications 1236, T.R. Connolly, Inc., Contractors. Looking upstream at the outlet portal of Bacon Tunnel portal structure and open transition is complete except for backfilling and cleaning up operations"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1053_sm.jpg",
          "alt": "Feeder Canal. This photograph was taken at about station 75+15 in the invert of the outlet open transition of the cut-and-cover looking east at the downstream end of the barrel section. The contractor is erecting forms, and placing reinforcing steel for the contractor is erecting forms, and placing and tying reinforcing steel for the underdrain pump well at the downstream end of the round-to-square transition. Specifications No. 2586, J.A. Terteling and Sons, Inc., Contractor.",
          "caption": "Erecting Forms",
          "link": "/digital/crbp/items/crbp1053.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "26",
          "year": "1950"
        },
        "text": {
          "headline": "Erecting Forms",
          "text": "Feeder Canal. This photograph was taken at about station 75+15 in the invert of the outlet open transition of the cut-and-cover looking east at the downstream end of the barrel section. The contractor is erecting forms, and placing reinforcing steel for the contractor is erecting forms, and placing and tying reinforcing steel for the underdrain pump well at the downstream end of the round-to-square transition. Specifications No. 2586, J.A. Terteling and Sons, Inc., Contractor."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1124_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is a close-up of the fabrication of the half hoops. The straight bar is fed to the machine from the lower left, goes through the rolls, and follows the support rollers around the upper left. H.E. Foss, photographer.",
          "caption": "Fabrication Of Half Hoops",
          "link": "/digital/crbp/items/crbp1124.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "09",
          "year": "1949"
        },
        "text": {
          "headline": "Fabrication Of Half Hoops",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph is a close-up of the fabrication of the half hoops. The straight bar is fed to the machine from the lower left, goes through the rolls, and follows the support rollers around the upper left. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1083_sm.jpg",
          "alt": "South Coulee Dam--Main Canal Headworks--View taken from east bank of the approach channel showing the falsework for construction of the gate section of the headworks.",
          "caption": "Gate Section Of Headworks",
          "link": "/digital/crbp/items/crbp1083.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "03",
          "year": "1949"
        },
        "text": {
          "headline": "Gate Section Of Headworks",
          "text": "South Coulee Dam--Main Canal Headworks--View taken from east bank of the approach channel showing the falsework for construction of the gate section of the headworks."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1094_sm.jpg",
          "alt": "South Coulee Dam--Grouting foundation drainage system, stations 26+50 to 29+25, approximate elevation 1512. Risers are located along the side slopes of the cut-off trench.",
          "caption": "Grouting Foundation Drainage System",
          "link": "/digital/crbp/items/crbp1094.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "23",
          "year": "1947"
        },
        "text": {
          "headline": "Grouting Foundation Drainage System",
          "text": "South Coulee Dam--Grouting foundation drainage system, stations 26+50 to 29+25, approximate elevation 1512. Risers are located along the side slopes of the cut-off trench."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1067_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division I. Bacon Tunnel, Specifications 1236, T.E. Conolly Inc., Contractor. Inlet portal of the Bacon Tunnel showing the full size of tunnel and steel supports in position",
          "caption": "Inlet Portal Of Bacon Tunnel",
          "link": "/digital/crbp/items/crbp1067.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "23",
          "year": "1947"
        },
        "text": {
          "headline": "Inlet Portal Of Bacon Tunnel",
          "text": "Columbia Basin Project, Irrigation Division I. Bacon Tunnel, Specifications 1236, T.E. Conolly Inc., Contractor. Inlet portal of the Bacon Tunnel showing the full size of tunnel and steel supports in position"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1055_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications 1422, Utah Construction Co. and Winston Bros., Contractor. Looking east across the Broken Rock Siphon No. 1 showing the completed barrel section and construction of the back from for the open inlet transition. The completed open outlet transition is showing in the background with a portion of the reinforcing steel for the closed outlet transition in place. The siphon barrel has a 19'14' inside diameter with 20' concrete walls. The siphon, which is located approximately 8 miles south east of Adrian, is 542 feet long.",
          "caption": "Inlet Transition",
          "link": "/digital/crbp/items/crbp1055.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "04",
          "year": "1949"
        },
        "text": {
          "headline": "Inlet Transition",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal, Specifications 1422, Utah Construction Co. and Winston Bros., Contractor. Looking east across the Broken Rock Siphon No. 1 showing the completed barrel section and construction of the back from for the open inlet transition. The completed open outlet transition is showing in the background with a portion of the reinforcing steel for the closed outlet transition in place. The siphon barrel has a 19'14' inside diameter with 20' concrete walls. The siphon, which is located approximately 8 miles south east of Adrian, is 542 feet long."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1068_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division I, Bacon Tunnel, Specification 1236, T.E. Connolly Inc., Contractors. Photograph toward tunnel portal from Station 186+44, showing both unsupported and timbered tunnel from Station 186+50 and Station 187+10.",
          "caption": "Interior Of Bacon Tunnel",
          "link": "/digital/crbp/items/crbp1068.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "13",
          "year": "1947"
        },
        "text": {
          "headline": "Interior Of Bacon Tunnel",
          "text": "Columbia Basin Project, Irrigation Division I, Bacon Tunnel, Specification 1236, T.E. Connolly Inc., Contractors. Photograph toward tunnel portal from Station 186+44, showing both unsupported and timbered tunnel from Station 186+50 and Station 187+10."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1066_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Outlet works tunnel taken from outlet portal. Long lake Dam is two miles northeast of Stratford, Wash. A.W. Bauman, photographer",
          "caption": "Interior Of Outlet Tunnel",
          "link": "/digital/crbp/items/crbp1066.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "09",
          "year": "1947"
        },
        "text": {
          "headline": "Interior Of Outlet Tunnel",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Dam. Spec. #1401--J.A. Terteling and Sons, Contractor. Outlet works tunnel taken from outlet portal. Long lake Dam is two miles northeast of Stratford, Wash. A.W. Bauman, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1062_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral Turnout at Sta. 989+60. Gate Chamber and floor slab for inlet have been placed. Walls and top slab for the inlet and outlet hub remain to be placed. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer.",
          "caption": "Lateral Turnout",
          "link": "/digital/crbp/items/crbp1062.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "17",
          "year": "1949"
        },
        "text": {
          "headline": "Lateral Turnout",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral Turnout at Sta. 989+60. Gate Chamber and floor slab for inlet have been placed. Walls and top slab for the inlet and outlet hub remain to be placed. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1063_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at 1059+54 completed except for placing precast pipe and collar. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer.",
          "caption": "Lateral Turnout Near Completion",
          "link": "/digital/crbp/items/crbp1063.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "17",
          "year": "1949"
        },
        "text": {
          "headline": "Lateral Turnout Near Completion",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2541, Schedule No. 2, Earthwork, Concrete Lining and Structures, Station 734+85 to Station 1229+74, West Canal. Contractor: Morrison-Knudsen Company, Inc. Lateral turnout at 1059+54 completed except for placing precast pipe and collar. West Canal located between Soap Lake, Washington and Winchester, Washington. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1080_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. Long Lake Headworks taken from canal centerline and looking upstream showing extent of completion when contractor ceased operations on Dec. 12, 1949. Forms have been removed from service bridge but are in place under the operation deck slab. When completed, each of the 3 openings will contain a 25' x 25' radial gate. The structure is 38.5' high. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer.",
          "caption": "Long Lake Headworks",
          "link": "/digital/crbp/items/crbp1080.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "14",
          "year": "1949"
        },
        "text": {
          "headline": "Long Lake Headworks",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2324, Schedule 1, Long Lake Headworks and concrete Canal Lining and Structures, Station 745+80 to Station 1101+29.0--Main Canal. Contractor: George B. Henly Construction Co., Inc. Long Lake Headworks taken from canal centerline and looking upstream showing extent of completion when contractor ceased operations on Dec. 12, 1949. Forms have been removed from service bridge but are in place under the operation deck slab. When completed, each of the 3 openings will contain a 25' x 25' radial gate. The structure is 38.5' high. Long Lake Headworks is 2 miles northeast of Stratford, Wash. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1122_sm.jpg",
          "alt": "South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west partition walls.",
          "caption": "Main Canal Headworks",
          "link": "/digital/crbp/items/crbp1122.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "02",
          "year": "1948"
        },
        "text": {
          "headline": "Main Canal Headworks",
          "text": "South Coulee Dam--Main Canal Headworks--View over top of barrel section taken from east upstream and west. The ladder-like templates in the middle left of the view support reinforcing steel in the hinge part of the gate section of the two west partition walls."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1060_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, shows the Schedule II siphon concrete placed to date. Dark concrete in foreground is section 50a. The 54-B-3 C.Y. dragline is seen in the upper right excavating common and stripping rock for the drillers, Station 437+. H.E. Foss, photographer",
          "caption": "Man Looks At Siphon",
          "link": "/digital/crbp/items/crbp1060.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "16",
          "year": "1949"
        },
        "text": {
          "headline": "Man Looks At Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411, Winston Brothers and Utah Construction Co., Contractors. This photograph, looking upstream, shows the Schedule II siphon concrete placed to date. Dark concrete in foreground is section 50a. The 54-B-3 C.Y. dragline is seen in the upper right excavating common and stripping rock for the drillers, Station 437+. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1058_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This comparison photograph shows a man standing on the right side of lined section 79A. The direction of flow through the siphon is from left to right of the picture. Work is being performed by Winston-Utah under Schedule II of above specs. H.E. Foss, photographer.",
          "caption": "Man Stands Next To The Siphon",
          "link": "/digital/crbp/items/crbp1058.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "Man Stands Next To The Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specs 2411. This comparison photograph shows a man standing on the right side of lined section 79A. The direction of flow through the siphon is from left to right of the picture. Work is being performed by Winston-Utah under Schedule II of above specs. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1065_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking easterly over completed portion of Dry Coulee Siphon No. 1 from Section 172. Steel yard, where siphon re-steel is cut, rolled, and welded is at left background. H.E. Foss, photographer.",
          "caption": "Man Stands On Dry Coulee Siphon",
          "link": "/digital/crbp/items/crbp1065.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "15",
          "year": "1948"
        },
        "text": {
          "headline": "Man Stands On Dry Coulee Siphon",
          "text": "Columbia Basin Project, Irrigation Division, West Canal, Specifications No. 1286--Utah Construction Co. and Winston Bros. Co., Contractor. Looking easterly over completed portion of Dry Coulee Siphon No. 1 from Section 172. Steel yard, where siphon re-steel is cut, rolled, and welded is at left background. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1084_sm.jpg",
          "alt": "Columbia Basin Project. Irrigation Division, Bacon Tunnel, Specifications 1236, T.E. Connolly, Inc., Contractor. Looking upstream at the outlet portal of the Bacon Tunnel. Portal Structure and open transition is complete except for backfilling and cleaning up operations.",
          "caption": "Outlet Of Bacon Tunnel",
          "link": "/digital/crbp/items/crbp1084.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "22",
          "year": "1948"
        },
        "text": {
          "headline": "Outlet Of Bacon Tunnel",
          "text": "Columbia Basin Project. Irrigation Division, Bacon Tunnel, Specifications 1236, T.E. Connolly, Inc., Contractor. Looking upstream at the outlet portal of the Bacon Tunnel. Portal Structure and open transition is complete except for backfilling and cleaning up operations."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1059_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications No. 2844. Third Section, West Canal, Schedule No. 1 and 2--Contractor: Marshall, Haas, and Royce, Haas and Rothschild--View showing outlet or downstream end of drainage culvert at Station 1632+25 West Canal while under construction. This drainage culvert takes care of excess moisture on a considerable acreage north of the canal and channels the water away from the irrigable land.",
          "caption": "Outlet Of Drainage Culvert",
          "link": "/digital/crbp/items/crbp1059.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "11",
          "year": "1950"
        },
        "text": {
          "headline": "Outlet Of Drainage Culvert",
          "text": "Columbia Basin Project, Irrigation Division, Specifications No. 2844. Third Section, West Canal, Schedule No. 1 and 2--Contractor: Marshall, Haas, and Royce, Haas and Rothschild--View showing outlet or downstream end of drainage culvert at Station 1632+25 West Canal while under construction. This drainage culvert takes care of excess moisture on a considerable acreage north of the canal and channels the water away from the irrigable land."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1070_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Long Lake Dam, Specification No. 1401, J.A. Terteling and Sons, Contractor. Reinforcing steel and forms in place ready for a pour in the tunnel. Long Lake Dam is two miles northeast of Stratford, Washington. H.E. Foss, photographer.",
          "caption": "Placing Forms And Reinforcing Steel",
          "link": "/digital/crbp/items/crbp1070.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "26",
          "year": "1948"
        },
        "text": {
          "headline": "Placing Forms And Reinforcing Steel",
          "text": "Columbia Basin Project, Irrigation Division, Long Lake Dam, Specification No. 1401, J.A. Terteling and Sons, Contractor. Reinforcing steel and forms in place ready for a pour in the tunnel. Long Lake Dam is two miles northeast of Stratford, Washington. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1082_sm.jpg",
          "alt": "South Coulee Dam--Zone I power tamping operations in cross-channels downstream from the cut-off wall, station 27+50",
          "caption": "Power Tamping Operations",
          "link": "/digital/crbp/items/crbp1082.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "09",
          "year": "1947"
        },
        "text": {
          "headline": "Power Tamping Operations",
          "text": "South Coulee Dam--Zone I power tamping operations in cross-channels downstream from the cut-off wall, station 27+50"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1071_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. Workmen removing dust from coal-tar primer prior to applying coal-tar enamel. Rags wrapped around sweep brooms are used. The enameling stage is in the background. This work is being performed by Walter Ferem Company, Los Angeles, sub-contractor for Winston-Utah under Schedule II of the above specifications. H.E. Foss, photographer.",
          "caption": "Removing Dust From Coal-Tar Primer",
          "link": "/digital/crbp/items/crbp1071.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "17",
          "year": "1950"
        },
        "text": {
          "headline": "Removing Dust From Coal-Tar Primer",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411. Workmen removing dust from coal-tar primer prior to applying coal-tar enamel. Rags wrapped around sweep brooms are used. The enameling stage is in the background. This work is being performed by Walter Ferem Company, Los Angeles, sub-contractor for Winston-Utah under Schedule II of the above specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1057_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros., Contractor. This photograph shows a \"liner plate\" about three quarters rolled. H.E. Foss, photographer",
          "caption": "Rolling The Liner Plate",
          "link": "/digital/crbp/items/crbp1057.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "27",
          "year": "1949"
        },
        "text": {
          "headline": "Rolling The Liner Plate",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications No. 2411--Utah Construction Co. and Winston Bros., Contractor. This photograph shows a \"liner plate\" about three quarters rolled. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1078_sm.jpg",
          "alt": "South Coulee Dam--Main Canal Headworks--View taken from the east bank of the approach channel looking west and downstream. Mixer and 'Pumperete' set-up are shown in the central part of the view. The cut-off wall footing which runs through the headworks can be seen in the left central background, with the contractor's air and water supply lines running down the rock bank behind and to the left of it",
          "caption": "South Coulee Dam, Main Canal Headworks [01]",
          "link": "/digital/crbp/items/crbp1078.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "04",
          "year": "1948"
        },
        "text": {
          "headline": "South Coulee Dam, Main Canal Headworks [01]",
          "text": "South Coulee Dam--Main Canal Headworks--View taken from the east bank of the approach channel looking west and downstream. Mixer and 'Pumperete' set-up are shown in the central part of the view. The cut-off wall footing which runs through the headworks can be seen in the left central background, with the contractor's air and water supply lines running down the rock bank behind and to the left of it"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1079_sm.jpg",
          "alt": "South Coulee Dam--Main Canal Headworks--View taken from bank above west outlet transition wall looking east and upstream at the downstream end of a section of the barrels.",
          "caption": "South Coulee Dam, Main Canal Headworks [02]",
          "link": "/digital/crbp/items/crbp1079.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "15",
          "year": "1948"
        },
        "text": {
          "headline": "South Coulee Dam, Main Canal Headworks [02]",
          "text": "South Coulee Dam--Main Canal Headworks--View taken from bank above west outlet transition wall looking east and upstream at the downstream end of a section of the barrels."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1074_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing size of fractures in stratified material in test pit at Station 499+00. Bottom margin of photo is approximately elev. 1027. View inclines upward along corner behind miner in photo 2059-4. Material has characteristics of clay, being fine grained, slippery when wet, and shrinks and fractures upon drying causing spalling. Harold Foss, photographer.",
          "caption": "Stratification Of Material In Test Pit [01]",
          "link": "/digital/crbp/items/crbp1074.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "02",
          "year": "1948"
        },
        "text": {
          "headline": "Stratification Of Material In Test Pit [01]",
          "text": "Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing size of fractures in stratified material in test pit at Station 499+00. Bottom margin of photo is approximately elev. 1027. View inclines upward along corner behind miner in photo 2059-4. Material has characteristics of clay, being fine grained, slippery when wet, and shrinks and fractures upon drying causing spalling. Harold Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1073_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing stratification and fracturing in material in test pit at Sta. 499+00 at elevation 1028. View looks horizontally at corner behind miner in photo 2059-4 from same position photo 2060-4 was taken. Harold Foss, photographer",
          "caption": "Stratification Of Material In Test Pit [02]",
          "link": "/digital/crbp/items/crbp1073.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "02",
          "year": "1948"
        },
        "text": {
          "headline": "Stratification Of Material In Test Pit [02]",
          "text": "Columbia Basin Project, Irrigation Division, Potholes East Canal. View showing stratification and fracturing in material in test pit at Sta. 499+00 at elevation 1028. View looks horizontally at corner behind miner in photo 2059-4 from same position photo 2060-4 was taken. Harold Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1081_sm.jpg",
          "alt": "South Coulee Dam--Main Canal Headworks--A view of the headworks structure taken from approximately station 10+00 on the main canal; the main canal pipe crossing is shown in the immediate foreground",
          "caption": "View Of Headworks Structure",
          "link": "/digital/crbp/items/crbp1081.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "08",
          "year": "1949"
        },
        "text": {
          "headline": "View Of Headworks Structure",
          "text": "South Coulee Dam--Main Canal Headworks--A view of the headworks structure taken from approximately station 10+00 on the main canal; the main canal pipe crossing is shown in the immediate foreground"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1054_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Forming floor screeds in closed outlet Broken Rock Siphon #2. Floor concrete placed first; screeds outline construction joint. H.E. Foss, photographer",
          "caption": "Workers Inside The Siphon",
          "link": "/digital/crbp/items/crbp1054.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Workers Inside The Siphon",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section East Low Canal, Specs. 2603. Forming floor screeds in closed outlet Broken Rock Siphon #2. Floor concrete placed first; screeds outline construction joint. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1201_sm.jpg",
          "alt": "Aerial view looking south over Devils Lake",
          "caption": "Aerial View Of Devils Lake",
          "link": "/digital/crbp/items/crbp1201.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "Aerial View Of Devils Lake",
          "text": "Aerial view looking south over Devils Lake"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1171_sm.jpg",
          "alt": "An aerial view of the feeder canal looking west. The surface runoff chutes on the right slope of the canal in the foreground area are at stations 45+05 and 48+60, respectively. The slide cracks are visible at the left center. A good view of the right side of upper end of the Grand Coulee and area above feeder canal slide area.",
          "caption": "Aerial View Of Feeder Canal",
          "link": "/digital/crbp/items/crbp1171.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "21",
          "year": "1947"
        },
        "text": {
          "headline": "Aerial View Of Feeder Canal",
          "text": "An aerial view of the feeder canal looking west. The surface runoff chutes on the right slope of the canal in the foreground area are at stations 45+05 and 48+60, respectively. The slide cracks are visible at the left center. A good view of the right side of upper end of the Grand Coulee and area above feeder canal slide area."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1162_sm.jpg",
          "alt": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. This aerial view of the Grand Coulee Dam area shows the status of progress on the construction of Grand Coulee pumping plant and feeder canal. The pumping plant is being constructed behind the 600-foot long wing dam extending to the left from near the west abutment end of Grand Coulee Dam. The world's largest pumps will be installed in the pumping plant at a level of 120 feet below the roadway elevation. Each pump will lift water 280 feet from Roosevelt Lake and will discharge it through a steel pipe 12 feet in diameter and about 680 feet in length. Twelve tunnels, from 487 to 530 feet in length, will carry the pipes under the highway and up through the granite canyon wall. Upon emerging from the tunnels, as do the three pipes on the right, they will continue on concrete piers for about 260 feet and discharge into the headworks for the feeder canal. Excavation of the feeder canal has been completed to the cut-and -cover section and is ready for concrete lining.",
          "caption": "Aerial View Of Grand Coulee [01]",
          "link": "/digital/crbp/items/crbp1162.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "21",
          "year": "1949"
        },
        "text": {
          "headline": "Aerial View Of Grand Coulee [01]",
          "text": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. This aerial view of the Grand Coulee Dam area shows the status of progress on the construction of Grand Coulee pumping plant and feeder canal. The pumping plant is being constructed behind the 600-foot long wing dam extending to the left from near the west abutment end of Grand Coulee Dam. The world's largest pumps will be installed in the pumping plant at a level of 120 feet below the roadway elevation. Each pump will lift water 280 feet from Roosevelt Lake and will discharge it through a steel pipe 12 feet in diameter and about 680 feet in length. Twelve tunnels, from 487 to 530 feet in length, will carry the pipes under the highway and up through the granite canyon wall. Upon emerging from the tunnels, as do the three pipes on the right, they will continue on concrete piers for about 260 feet and discharge into the headworks for the feeder canal. Excavation of the feeder canal has been completed to the cut-and -cover section and is ready for concrete lining."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1164_sm.jpg",
          "alt": "An aerial view looking northeast. A general view showing feeder canal, area above feeder canal, and part of town of Grand Coulee. Highest crack in slide area is visible. Feeder canal outline can be seen back to headworks. A view of the area above feeder canal from station 77 back to the headworks.",
          "caption": "Aerial View Of Grand Coulee [02]",
          "link": "/digital/crbp/items/crbp1164.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "21",
          "year": "1947"
        },
        "text": {
          "headline": "Aerial View Of Grand Coulee [02]",
          "text": "An aerial view looking northeast. A general view showing feeder canal, area above feeder canal, and part of town of Grand Coulee. Highest crack in slide area is visible. Feeder canal outline can be seen back to headworks. A view of the area above feeder canal from station 77 back to the headworks."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1163_sm.jpg",
          "alt": "An aerial view looking east. A general view showing feeder canal, area immediately above slide area of canal, and part of town of Grand Coulee. Feeder canal shown back to headworks",
          "caption": "Aerial View Of Grand Coulee [03]",
          "link": "/digital/crbp/items/crbp1163.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "21",
          "year": "1947"
        },
        "text": {
          "headline": "Aerial View Of Grand Coulee [03]",
          "text": "An aerial view looking east. A general view showing feeder canal, area immediately above slide area of canal, and part of town of Grand Coulee. Feeder canal shown back to headworks"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1183_sm.jpg",
          "alt": "An aerial view of the site of North Coulee Dam which extends from the stripped area at the lower left hand corner to the large basalt rock in the center of the picture. The power shovel is working approximately at the center of the proposed earth dam",
          "caption": "Aerial View Of Site Of North Coulee",
          "link": "/digital/crbp/items/crbp1183.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "15",
          "year": "1949"
        },
        "text": {
          "headline": "Aerial View Of Site Of North Coulee",
          "text": "An aerial view of the site of North Coulee Dam which extends from the stripped area at the lower left hand corner to the large basalt rock in the center of the picture. The power shovel is working approximately at the center of the proposed earth dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1160_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Bacon Siphon and Bacon Tunnel. Looking into the downstream end of the Bacon Siphon from the point where it joins the Bacon Tunnel. The structure here has an inside diameter of 23-feet, 3-inches and when in full operation will carry enough water to irrigate half a million acres.",
          "caption": "Man Gives Scale To Bacon Siphon",
          "link": "/digital/crbp/items/crbp1160.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "27",
          "year": "1950"
        },
        "text": {
          "headline": "Man Gives Scale To Bacon Siphon",
          "text": "Columbia Basin Project, Irrigation Division, Bacon Siphon and Bacon Tunnel. Looking into the downstream end of the Bacon Siphon from the point where it joins the Bacon Tunnel. The structure here has an inside diameter of 23-feet, 3-inches and when in full operation will carry enough water to irrigate half a million acres."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1158_sm.jpg",
          "alt": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc., and Peter Kiewit Sons' Co. View of the 12-foot diameter pump-discharge pipes P-1 to P-6 showing their entrance into the outlet structure.",
          "caption": "View Of The Discharge Pipes",
          "link": "/digital/crbp/items/crbp1158.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "11",
          "year": "1949"
        },
        "text": {
          "headline": "View Of The Discharge Pipes",
          "text": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc., and Peter Kiewit Sons' Co. View of the 12-foot diameter pump-discharge pipes P-1 to P-6 showing their entrance into the outlet structure."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1159_sm.jpg",
          "alt": "View of the west abutment from the east parking lot showing the discharge pipes, dam pumping plant and Coulee Dam.",
          "caption": "View Of The West Abutment",
          "link": "/digital/crbp/items/crbp1159.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "01",
          "year": "1950"
        },
        "text": {
          "headline": "View Of The West Abutment",
          "text": "View of the west abutment from the east parking lot showing the discharge pipes, dam pumping plant and Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1203_sm.jpg",
          "alt": "View of tract No. 3 Taken from a point approximately 300 feet north and 300 feet east of the southwest corner of the NW 1/4SE1/4 of Sec. 26, T. R. 28E., W.M., looking N. 08 degrees E. U.S. V. Howard Adams, et al.",
          "caption": "View Of Tract No. 3",
          "link": "/digital/crbp/items/crbp1203.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "22",
          "year": "1949"
        },
        "text": {
          "headline": "View Of Tract No. 3",
          "text": "View of tract No. 3 Taken from a point approximately 300 feet north and 300 feet east of the southwest corner of the NW 1/4SE1/4 of Sec. 26, T. R. 28E., W.M., looking N. 08 degrees E. U.S. V. Howard Adams, et al."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1149_sm.jpg",
          "alt": "Aerial view looking into the upper end of the 12 pumping plant discharge pipe tunnels. Just beyond the tunnel mouths is the pumping plant. The upper combined bends for discharge pipes Nos. 1 and 2 are in position at the bottom of the picture.",
          "caption": "Aerial View Of The Pumping Plant",
          "link": "/digital/crbp/items/crbp1149.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "15",
          "year": "1949"
        },
        "text": {
          "headline": "Aerial View Of The Pumping Plant",
          "text": "Aerial view looking into the upper end of the 12 pumping plant discharge pipe tunnels. Just beyond the tunnel mouths is the pumping plant. The upper combined bends for discharge pipes Nos. 1 and 2 are in position at the bottom of the picture."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1144_sm.jpg",
          "alt": "Construction of the Pumping Plant Structure, Grand Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing the concrete form around the outlet tunnel, placement of reinforcing steel and in the center close to the concrete form is a square opening for the block out which is on top of the discharge pipe under the steel matt. This block out extends upward on an angle from the end of the steep matt to the top of the tunnel, part of it can be seen in the center background, it continues on into the tunnel and will be used to run pumpcrete pipes for the pouring of concrete around the discharge pipe. The vertical steel bars on the steel matt (right) are for the elevator block out. Discharge pipes for pumping units P-1 and P-3 have been placed in position and are shown at the right and left of P-2 installation.",
          "caption": "Concrete Form Around Discharge Pipe",
          "link": "/digital/crbp/items/crbp1144.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "16",
          "year": "1949"
        },
        "text": {
          "headline": "Concrete Form Around Discharge Pipe",
          "text": "Construction of the Pumping Plant Structure, Grand Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing the concrete form around the outlet tunnel, placement of reinforcing steel and in the center close to the concrete form is a square opening for the block out which is on top of the discharge pipe under the steel matt. This block out extends upward on an angle from the end of the steep matt to the top of the tunnel, part of it can be seen in the center background, it continues on into the tunnel and will be used to run pumpcrete pipes for the pouring of concrete around the discharge pipe. The vertical steel bars on the steel matt (right) are for the elevator block out. Discharge pipes for pumping units P-1 and P-3 have been placed in position and are shown at the right and left of P-2 installation."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1153_sm.jpg",
          "alt": "View of heavy machinery digging tunnel into the bank",
          "caption": "Digging Out The Tunnels",
          "link": "/digital/crbp/items/crbp1153.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "26",
          "year": "1938"
        },
        "text": {
          "headline": "Digging Out The Tunnels",
          "text": "View of heavy machinery digging tunnel into the bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1154_sm.jpg",
          "alt": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Subcontractor: Consolidated Western Steel Corporation. Progress view of 12-foot diameter pump-discharge pipe emerging from P-4 tunnel. The two top 20-foot lengths are seen to be 'fitted up' and ready for welding. The two men within the end of the pipe are on a wheel mounted welding jumbo used to make welds on the inside pipe seams. Forming and scaffolds to the right are for the anchor block of the P-3 pipe.",
          "caption": "Discharge Pipe Emerging From Tunnel",
          "link": "/digital/crbp/items/crbp1154.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "06",
          "year": "1949"
        },
        "text": {
          "headline": "Discharge Pipe Emerging From Tunnel",
          "text": "Specifications 2329. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. Subcontractor: Consolidated Western Steel Corporation. Progress view of 12-foot diameter pump-discharge pipe emerging from P-4 tunnel. The two top 20-foot lengths are seen to be 'fitted up' and ready for welding. The two men within the end of the pipe are on a wheel mounted welding jumbo used to make welds on the inside pipe seams. Forming and scaffolds to the right are for the anchor block of the P-3 pipe."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1157_sm.jpg",
          "alt": "The exposed portions of the pumping plant discharge pipes gleam brightly in the sun with their coat of aluminum paint. Symbolic of the entire Columbia Basin Project--this picture shows Coulee Dam holding back the waters of the Columbia River forming Lake Roosevelt. The water there held, is now awaiting only the pump installations to start the water flowing through these pipes and to the thirsty acres of the project 60 to 150 miles south of the dam.",
          "caption": "Discharge Pipes With Grand Coulee In Background",
          "link": "/digital/crbp/items/crbp1157.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "24",
          "year": "1950"
        },
        "text": {
          "headline": "Discharge Pipes With Grand Coulee In Background",
          "text": "The exposed portions of the pumping plant discharge pipes gleam brightly in the sun with their coat of aluminum paint. Symbolic of the entire Columbia Basin Project--this picture shows Coulee Dam holding back the waters of the Columbia River forming Lake Roosevelt. The water there held, is now awaiting only the pump installations to start the water flowing through these pipes and to the thirsty acres of the project 60 to 150 miles south of the dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1145_sm.jpg",
          "alt": "Specs # 2329, Contract I2r 18156, Contractor, Morrison-Knudsen Company Inc. and Peter Kiewit Son's Co. View looking north showing progress made on pumping plant including office wing, parking area, gantry crane, and storage building P-9 through P-14 inclusive.",
          "caption": "Looking North Over Pumping Plant",
          "link": "/digital/crbp/items/crbp1145.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "25",
          "year": "1950"
        },
        "text": {
          "headline": "Looking North Over Pumping Plant",
          "text": "Specs # 2329, Contract I2r 18156, Contractor, Morrison-Knudsen Company Inc. and Peter Kiewit Son's Co. View looking north showing progress made on pumping plant including office wing, parking area, gantry crane, and storage building P-9 through P-14 inclusive."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1142_sm.jpg",
          "alt": "Construction of the Pumping Plant Structure, Grand Coulee Dam, Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing reinforcing steel being placed in concrete form is the square opening of the block out which extends under the steel matt into the tunnel. Foreground, on top of the steel matt, steel is being placed to form block out for the elevator, also a ladder is shown on the west wall. In the background, at the bottom of the downstream wall are the intake pipes for pumping units P-2, P-3 and P-4",
          "caption": "Placing Reinforcing Steel",
          "link": "/digital/crbp/items/crbp1142.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "16",
          "year": "1949"
        },
        "text": {
          "headline": "Placing Reinforcing Steel",
          "text": "Construction of the Pumping Plant Structure, Grand Coulee Dam, Coulee Dam, Washington. Installation of pumping unit P-2 discharge pipe, showing reinforcing steel being placed in concrete form is the square opening of the block out which extends under the steel matt into the tunnel. Foreground, on top of the steel matt, steel is being placed to form block out for the elevator, also a ladder is shown on the west wall. In the background, at the bottom of the downstream wall are the intake pipes for pumping units P-2, P-3 and P-4"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1143_sm.jpg",
          "alt": "Looking north over pump plant construction",
          "caption": "Pump Plant Construction",
          "link": "/digital/crbp/items/crbp1143.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "21",
          "year": "1940"
        },
        "text": {
          "headline": "Pump Plant Construction",
          "text": "Looking north over pump plant construction"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1156_sm.jpg",
          "alt": "Specifications 2329, Morrison-Knudsen So., Inc. and Peter Kiewit Sons' Company. Progress view showing initial construction on the pump discharge outlet structure. On the right can be seen the completed invert of P-1 and P-2 conduits with the sectional forms of the transition arch being set. On the left is the P-9 transition invert form being made ready to pour. The crest bend sections of P-1 and P-2 discharge pipes have been secured into final position, braced to retain round, and the inner girdle of reinforcing steel is being placed.",
          "caption": "Pump-Discharge Outlet Structure [01]",
          "link": "/digital/crbp/items/crbp1156.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Pump-Discharge Outlet Structure [01]",
          "text": "Specifications 2329, Morrison-Knudsen So., Inc. and Peter Kiewit Sons' Company. Progress view showing initial construction on the pump discharge outlet structure. On the right can be seen the completed invert of P-1 and P-2 conduits with the sectional forms of the transition arch being set. On the left is the P-9 transition invert form being made ready to pour. The crest bend sections of P-1 and P-2 discharge pipes have been secured into final position, braced to retain round, and the inner girdle of reinforcing steel is being placed."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1155_sm.jpg",
          "alt": "Specifications 2329. Morrison-Knudsen Company, Inc., and Peter Kiewit Sons' Company. Progress view of the pump-discharge outlet structure showing the status of construction of the crest bends of P-1 to P-4 discharge pipes. Pipes P-1 and P-2 have been encased with concrete, with the steel pipe ending at this point as can be seen in lines P-3 to P-4 around which reinforcing steel is being placed. The pipes are to extend from this point with round reinforced concrete tubes as can be seen in the foreground where P-1 and P-2 are formed and the placing of reinforcing steel started. Note the two siphon breakers installed on P-1 and P-2 crest bends.",
          "caption": "Pump-Discharge Outlet Structure [02]",
          "link": "/digital/crbp/items/crbp1155.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "08",
          "year": "1949"
        },
        "text": {
          "headline": "Pump-Discharge Outlet Structure [02]",
          "text": "Specifications 2329. Morrison-Knudsen Company, Inc., and Peter Kiewit Sons' Company. Progress view of the pump-discharge outlet structure showing the status of construction of the crest bends of P-1 to P-4 discharge pipes. Pipes P-1 and P-2 have been encased with concrete, with the steel pipe ending at this point as can be seen in lines P-3 to P-4 around which reinforcing steel is being placed. The pipes are to extend from this point with round reinforced concrete tubes as can be seen in the foreground where P-1 and P-2 are formed and the placing of reinforcing steel started. Note the two siphon breakers installed on P-1 and P-2 crest bends."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1146_sm.jpg",
          "alt": "View shows progress of P-1-Second Stage Phase two. Suction elbow installation to date. Contract 12r-18156. Contractors-Morrison Knudsen Company Inc. and Peter Kiewit Sons-Grand Coulee Dam, Columbia Basin Project.",
          "caption": "Suction Elbow Installation",
          "link": "/digital/crbp/items/crbp1146.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "27",
          "year": "1950"
        },
        "text": {
          "headline": "Suction Elbow Installation",
          "text": "View shows progress of P-1-Second Stage Phase two. Suction elbow installation to date. Contract 12r-18156. Contractors-Morrison Knudsen Company Inc. and Peter Kiewit Sons-Grand Coulee Dam, Columbia Basin Project."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1148_sm.jpg",
          "alt": "View of Grand Coulee from west bank. Cranes visible on bank.",
          "caption": "View Of Dam Taken From West Bank",
          "link": "/digital/crbp/items/crbp1148.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "09",
          "year": "1941"
        },
        "text": {
          "headline": "View Of Dam Taken From West Bank",
          "text": "View of Grand Coulee from west bank. Cranes visible on bank."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1152_sm.jpg",
          "alt": "View of tunnels in the bank",
          "caption": "View Of Tunnels In The Bank [01]",
          "link": "/digital/crbp/items/crbp1152.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "02",
          "year": "1939"
        },
        "text": {
          "headline": "View Of Tunnels In The Bank [01]",
          "text": "View of tunnels in the bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1151_sm.jpg",
          "alt": "View of men working on tunnels cut into the bank",
          "caption": "View Of Tunnels In The Bank [02]",
          "link": "/digital/crbp/items/crbp1151.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "27",
          "year": "1938"
        },
        "text": {
          "headline": "View Of Tunnels In The Bank [02]",
          "text": "View of men working on tunnels cut into the bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1147_sm.jpg",
          "alt": "View showing west crane recess",
          "caption": "West Crane Recess",
          "link": "/digital/crbp/items/crbp1147.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "10",
          "year": "1940"
        },
        "text": {
          "headline": "West Crane Recess",
          "text": "View showing west crane recess"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1327_sm.jpg",
          "alt": "A distant view of Grand Coulee Dam showing the employee housing along the Columbia River, in Grand Coulee, Washington April 21, 1940.",
          "caption": "Employee housing 1940",
          "link": "/digital/crbp/items/crbp1327.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "21",
          "year": "1940"
        },
        "text": {
          "headline": "Employee housing 1940",
          "text": "A distant view of Grand Coulee Dam showing the employee housing along the Columbia River, in Grand Coulee, Washington April 21, 1940."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1236_sm.jpg",
          "alt": "Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia",
          "caption": "Employee housing 1941",
          "link": "/digital/crbp/items/crbp1236.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1941"
        },
        "text": {
          "headline": "Employee housing 1941",
          "text": "Shot with a wide angle lens, a view of the dam with employee housing on both sides of the Columbia"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1237_sm.jpg",
          "alt": "Coulee dam and vicinity from Crown Point",
          "caption": "Employee housing 1950 [01]",
          "link": "/digital/crbp/items/crbp1237.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "02",
          "year": "1950"
        },
        "text": {
          "headline": "Employee housing 1950 [01]",
          "text": "Coulee dam and vicinity from Crown Point"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1329_sm.jpg",
          "alt": "Telephoto photograph of home and yards in the Airport Addition to Coulee Dam",
          "caption": "Employee housing 1950 [02]",
          "link": "/digital/crbp/items/crbp1329.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "20",
          "year": "1950"
        },
        "text": {
          "headline": "Employee housing 1950 [02]",
          "text": "Telephoto photograph of home and yards in the Airport Addition to Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1328_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Specifications 2844. View of eleven Kit trailers 33'-0 and one old house trailer located at the government housing area awaiting setting up in locations for the temporary housing of government employees.",
          "caption": "Employee housing 1950 [03]",
          "link": "/digital/crbp/items/crbp1328.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "19",
          "year": "1950"
        },
        "text": {
          "headline": "Employee housing 1950 [03]",
          "text": "Columbia Basin Project, Irrigation Division, Specifications 2844. View of eleven Kit trailers 33'-0 and one old house trailer located at the government housing area awaiting setting up in locations for the temporary housing of government employees."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1238_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Othello Government Housing, Specifications No. R1-CB-30. View looking west along county road continuous with Main Street of Othello, Wash., Showing three three-bedroom and seven two-bedroom permanent type residences.",
          "caption": "Othello, 1950",
          "link": "/digital/crbp/items/crbp1238.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Othello, 1950",
          "text": "Columbia Basin Project, Irrigation Division. Othello Government Housing, Specifications No. R1-CB-30. View looking west along county road continuous with Main Street of Othello, Wash., Showing three three-bedroom and seven two-bedroom permanent type residences."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1330_sm.jpg",
          "alt": "Image of a permanent community structure at Coulee Dam",
          "caption": "Employee housing 1940",
          "link": "/digital/crbp/items/crbp1330.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "07",
          "year": "1937"
        },
        "text": {
          "headline": "Employee housing 1940",
          "text": "Image of a permanent community structure at Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1331_sm.jpg",
          "alt": "Image of tennis courts taken in 1938 at the employee housing site for Coulee Dam",
          "caption": "Employee tennis courts 1938",
          "link": "/digital/crbp/items/crbp1331.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "04",
          "year": "1938"
        },
        "text": {
          "headline": "Employee tennis courts 1938",
          "text": "Image of tennis courts taken in 1938 at the employee housing site for Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1229_sm.jpg",
          "alt": "Cat jockeys must know their stuff in preparing the tunnel portal at the U.S. Army Corps of Engineers' Dworshak Dam on the North Fork of the Clearwater River. Here the two Bulldozers push over the cliff the results of a fair-sized blast at the tunnel portal. In the rear may be seen the battery of air drills constantly at work at the tunnel site.",
          "caption": "Cat Jockey At Work Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1229.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Cat Jockey At Work Engineer recruitment program)",
          "text": "Cat jockeys must know their stuff in preparing the tunnel portal at the U.S. Army Corps of Engineers' Dworshak Dam on the North Fork of the Clearwater River. Here the two Bulldozers push over the cliff the results of a fair-sized blast at the tunnel portal. In the rear may be seen the battery of air drills constantly at work at the tunnel site."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1211_sm.jpg",
          "alt": "The old business district of the town of Arlington, Oregon, still remains intact, but time is fast running out. The overpass bridge of Interstate Highway 80N is scheduled for completion by the end of the year. By that time the Walla Walla district, U.S. Army Corps of Engineers will have underway the demolishing phase of the project. The present Arlington business district will be transferred to the new site above the pool level of John Day Dam, scheduled for raising in 1968.",
          "caption": "Arlington, Oregon Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1211.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Arlington, Oregon Engineer recruitment program)",
          "text": "The old business district of the town of Arlington, Oregon, still remains intact, but time is fast running out. The overpass bridge of Interstate Highway 80N is scheduled for completion by the end of the year. By that time the Walla Walla district, U.S. Army Corps of Engineers will have underway the demolishing phase of the project. The present Arlington business district will be transferred to the new site above the pool level of John Day Dam, scheduled for raising in 1968."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1210_sm.jpg",
          "alt": "Shown here is the town of Boardman on the left side of the picture, showing U.S. Highway 30 to the upper or south of the picture. At the lower left hand corner of the picture may be seen the Union Pacific Railroad right of way. The entire town of Boardman will be moved from this site to a site at the upper left hand side of this picture near the dark area. The new interstate highway 80N will run by the darkened area, with Boardman being in between the new highway and the new railroad right of way, which will be approximately where U.S. highway 30 is now.",
          "caption": "Boardman, Oregon Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1210.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Boardman, Oregon Engineer recruitment program)",
          "text": "Shown here is the town of Boardman on the left side of the picture, showing U.S. Highway 30 to the upper or south of the picture. At the lower left hand corner of the picture may be seen the Union Pacific Railroad right of way. The entire town of Boardman will be moved from this site to a site at the upper left hand side of this picture near the dark area. The new interstate highway 80N will run by the darkened area, with Boardman being in between the new highway and the new railroad right of way, which will be approximately where U.S. highway 30 is now."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1231_sm.jpg",
          "alt": "Clearing timber from the land at the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam site on the North Fork of the Clearwater River is well underway. Dworshak Dam will set across the river about the center of the picture and will climb to a height of 673 feet.",
          "caption": "Clearing Timber [01] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1231.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Clearing Timber [01] Engineer recruitment program)",
          "text": "Clearing timber from the land at the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam site on the North Fork of the Clearwater River is well underway. Dworshak Dam will set across the river about the center of the picture and will climb to a height of 673 feet."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1232_sm.jpg",
          "alt": "Clearing crews are hard at the task of removing timber from the shore line at the site of the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam three miles upstream from the town of Ahsahka, near the confluence of the North Fork of the Clearwater River and the Clearwater main stem.",
          "caption": "Clearing Timber [02] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1232.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Clearing Timber [02] Engineer recruitment program)",
          "text": "Clearing crews are hard at the task of removing timber from the shore line at the site of the U.S. Army Corps of Engineers Dworshak (Bruces Eddy) Dam three miles upstream from the town of Ahsahka, near the confluence of the North Fork of the Clearwater River and the Clearwater main stem."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1200_sm.jpg",
          "alt": "Map of existing and proposed projects throughout the Columbia River Basin.",
          "caption": "Columbia River Basin Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1200.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Columbia River Basin Engineer recruitment program)",
          "text": "Map of existing and proposed projects throughout the Columbia River Basin."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1235_sm.jpg",
          "alt": "Looking downstream on the Columbia River, with Mount Hood in the background, is the U.S. Army Corps of Engineers John Day Lock and Dam. Work on the South or left shore, being carried on behind the 25-acre cofferdam enclosed work area, is nearing the 45 percent completion mark. Here the powerhouse and powerhouse intake section is being constructed, with a total of 578,000 cubic yards of concrete having been placed to date. Meanwhile, the entire flow of the Columbia River is being diverted through the 18 spillway bays while barge navigation is maintained through the North Shore navigation lock by use of a temporary channel feeding into the lock from upstream.",
          "caption": "Completed John Day Lock And Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1235.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Completed John Day Lock And Dam Engineer recruitment program)",
          "text": "Looking downstream on the Columbia River, with Mount Hood in the background, is the U.S. Army Corps of Engineers John Day Lock and Dam. Work on the South or left shore, being carried on behind the 25-acre cofferdam enclosed work area, is nearing the 45 percent completion mark. Here the powerhouse and powerhouse intake section is being constructed, with a total of 578,000 cubic yards of concrete having been placed to date. Meanwhile, the entire flow of the Columbia River is being diverted through the 18 spillway bays while barge navigation is maintained through the North Shore navigation lock by use of a temporary channel feeding into the lock from upstream."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1208_sm.jpg",
          "alt": "The U.S Army Corps of Engineers' John Day Lock and Dam South Shore Powerhouse section is well past the 40% completion mark under the $73, 356,000 contract held by Vinnell-McNamara-Mannix-Fuller. This picture was taken from the deck of the mid river spillway section of the dam, looking down into the 25-acre South Shore work area.",
          "caption": "Construction Of John Day Lock And Dam Powerhouse [01] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1208.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Construction Of John Day Lock And Dam Powerhouse [01] Engineer recruitment program)",
          "text": "The U.S Army Corps of Engineers' John Day Lock and Dam South Shore Powerhouse section is well past the 40% completion mark under the $73, 356,000 contract held by Vinnell-McNamara-Mannix-Fuller. This picture was taken from the deck of the mid river spillway section of the dam, looking down into the 25-acre South Shore work area."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1207_sm.jpg",
          "alt": "A battery of high gantry cranes carries on the work of placing the monthly average of over 70,000 cubic yards of concrete into the powerhouse structure at the U.S. Army Corps of Engineers' John Day Locke and Dam on the Columbia River. Vinnell-McNamara-Mannix-Fuller, holders of the $73 million contract for completion of the powerhouse section, is rated as over 41% complete and is on schedule.",
          "caption": "Construction Of John Day Lock And Dam Powerhouse [02] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1207.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Construction Of John Day Lock And Dam Powerhouse [02] Engineer recruitment program)",
          "text": "A battery of high gantry cranes carries on the work of placing the monthly average of over 70,000 cubic yards of concrete into the powerhouse structure at the U.S. Army Corps of Engineers' John Day Locke and Dam on the Columbia River. Vinnell-McNamara-Mannix-Fuller, holders of the $73 million contract for completion of the powerhouse section, is rated as over 41% complete and is on schedule."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1227_sm.jpg",
          "alt": "Description of proposed Asotin Dam, for artists rendition, please see photo 94-0 40",
          "caption": "Description Of Proposed Asotin Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1227.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Description Of Proposed Asotin Dam Engineer recruitment program)",
          "text": "Description of proposed Asotin Dam, for artists rendition, please see photo 94-0 40"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1221_sm.jpg",
          "alt": "For artists rendition of the dam, please see photo 94-0 33",
          "caption": "Description Of Proposed Little Goose Lock And Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1221.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Description Of Proposed Little Goose Lock And Dam Engineer recruitment program)",
          "text": "For artists rendition of the dam, please see photo 94-0 33"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1341_sm.jpg",
          "alt": "For artists rendition of the dam, please see photo 94-0 36",
          "caption": "Description Of Proposed Lower Granite Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1341.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Description Of Proposed Lower Granite Dam Engineer recruitment program)",
          "text": "For artists rendition of the dam, please see photo 94-0 36"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1213_sm.jpg",
          "alt": "Artist's conception of the $210,000 Dworshak Dam two miles upstream on the North Fork of the Clearwater river from the town of Ahsahka, Idaho.  Dworshak Dam will be a concrete gravity dam with an initial power production potentially of 400,000 kilowatts from three generators. Three additional generators can be added later to boost the power output to 1,060,000 kilowatts. Dworshak dam will create a reservoir storing 3,454,000 acre-feet of water and will add substantially to the prime power production of hydroelectric plants downstream on the Snake and Columbia Rivers. Also, it will serve a vital role in flood control on the Clearwater, which has wide fluctuations in flow during the year. The Dworshak reservoir will be approximately 53 miles long. Congress appropriated $600,000 in planning funds in 1961 and in 1962 Congress appropriated $2,000,000 in construction funds. Start of construction began April, 1963, with building of access roads to the project.",
          "caption": "Dworshak Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1213.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Dworshak Dam Engineer recruitment program)",
          "text": "Artist's conception of the $210,000 Dworshak Dam two miles upstream on the North Fork of the Clearwater river from the town of Ahsahka, Idaho.  Dworshak Dam will be a concrete gravity dam with an initial power production potentially of 400,000 kilowatts from three generators. Three additional generators can be added later to boost the power output to 1,060,000 kilowatts. Dworshak dam will create a reservoir storing 3,454,000 acre-feet of water and will add substantially to the prime power production of hydroelectric plants downstream on the Snake and Columbia Rivers. Also, it will serve a vital role in flood control on the Clearwater, which has wide fluctuations in flow during the year. The Dworshak reservoir will be approximately 53 miles long. Congress appropriated $600,000 in planning funds in 1961 and in 1962 Congress appropriated $2,000,000 in construction funds. Start of construction began April, 1963, with building of access roads to the project."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1230_sm.jpg",
          "alt": "Fifty-foot high, four decked jumbo drill rig that will be used to bore the diversion tunnel at the U.S. Army Corps of Engineers' Dworshak Dam on the North For Clearwater River. Thirty air-driven \"Swedish ladder drills\" will be distributed along the face of the mobile drill rig and will be advanced forward yard by yard as the tunnel bore is pushed ahead. The schedule calls for the thirty borings across the face of the tunnel to be loaded with explosives, the drill frame pulled back out of the tunnel, and the charge exploded at each change of shift. The bore will be 1,573 feet in length, with a vertical height of approximately 50 feet and a horizontal width of 40 feet.",
          "caption": "Early Construction At Dworshak Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1230.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Early Construction At Dworshak Engineer recruitment program)",
          "text": "Fifty-foot high, four decked jumbo drill rig that will be used to bore the diversion tunnel at the U.S. Army Corps of Engineers' Dworshak Dam on the North For Clearwater River. Thirty air-driven \"Swedish ladder drills\" will be distributed along the face of the mobile drill rig and will be advanced forward yard by yard as the tunnel bore is pushed ahead. The schedule calls for the thirty borings across the face of the tunnel to be loaded with explosives, the drill frame pulled back out of the tunnel, and the charge exploded at each change of shift. The bore will be 1,573 feet in length, with a vertical height of approximately 50 feet and a horizontal width of 40 feet."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1198_sm.jpg",
          "alt": "A map of flood control projects in the Pacific Northwest",
          "caption": "Flood Control Projects 1 Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1198.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Flood Control Projects 1 Engineer recruitment program)",
          "text": "A map of flood control projects in the Pacific Northwest"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1199_sm.jpg",
          "alt": "A map of flood control projects in the Pacific Northwest",
          "caption": "Flood Control Projects 2 Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1199.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Flood Control Projects 2 Engineer recruitment program)",
          "text": "A map of flood control projects in the Pacific Northwest"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1193_sm.jpg",
          "alt": "Front cover of the \"Planning your Career\" publication",
          "caption": "Front Cover Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1193.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Front Cover Engineer recruitment program)",
          "text": "Front cover of the \"Planning your Career\" publication"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1217_sm.jpg",
          "alt": "Coast Guard barge and small crafts proceed upstream through the navigation lock for the dedication ceremony on 9 May 1962 at the U.S. Army, Corps of Engineers' Ice Harbor Lock and Dam on the Snake River.",
          "caption": "Ice Harbor Lock And Dam Dedication Ceremony Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1217.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "09",
          "year": "1962"
        },
        "text": {
          "headline": "Ice Harbor Lock And Dam Dedication Ceremony Engineer recruitment program)",
          "text": "Coast Guard barge and small crafts proceed upstream through the navigation lock for the dedication ceremony on 9 May 1962 at the U.S. Army, Corps of Engineers' Ice Harbor Lock and Dam on the Snake River."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1233_sm.jpg",
          "alt": "Description of proposed John Day Lock and Dam. See photo 94-0 17 for artist's rendition.",
          "caption": "John Day Lock And Dam Description Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1233.html"
        },
        "start_date": { 
          
          "year": "1962"
        },
        "text": {
          "headline": "John Day Lock And Dam Description Engineer recruitment program)",
          "text": "Description of proposed John Day Lock and Dam. See photo 94-0 17 for artist's rendition."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1234_sm.jpg",
          "alt": "Rendition of proposed John Day Lock and Dam. See photo 94-0 16 for description.",
          "caption": "John Day Lock And Dam Rendition Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1234.html"
        },
        "start_date": { 
          
          "year": "1962"
        },
        "text": {
          "headline": "John Day Lock And Dam Rendition Engineer recruitment program)",
          "text": "Rendition of proposed John Day Lock and Dam. See photo 94-0 16 for description."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1216_sm.jpg",
          "alt": "In addition to furnishing storage water for downstream navigation throughout the Boise Valley, Lucky Peak Reservoir creates a recreational area for the entire Boise region. In addition, its novel manifold discharge mechanism below the dam creates an ideal swimming spot for this arid region.",
          "caption": "Lucky Peak Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1216.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Lucky Peak Dam Engineer recruitment program)",
          "text": "In addition to furnishing storage water for downstream navigation throughout the Boise Valley, Lucky Peak Reservoir creates a recreational area for the entire Boise region. In addition, its novel manifold discharge mechanism below the dam creates an ideal swimming spot for this arid region."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1209_sm.jpg",
          "alt": "With diversion of the Columbia River through the North Shore spillway bays at the U.S Army Corps of Engineers' John Day Lock and Dam, barges and tows are now utilizing the temporary channel and permanent lock of the huge multipurpose project.",
          "caption": "Making Use Of Temporary Channel Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1209.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Making Use Of Temporary Channel Engineer recruitment program)",
          "text": "With diversion of the Columbia River through the North Shore spillway bays at the U.S Army Corps of Engineers' John Day Lock and Dam, barges and tows are now utilizing the temporary channel and permanent lock of the huge multipurpose project."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1196_sm.jpg",
          "alt": "A map of authorized and potential projects to be undertaken by the Corps of Engineers.",
          "caption": "Map Of Authorized And Potential Projects Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1196.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Map Of Authorized And Potential Projects Engineer recruitment program)",
          "text": "A map of authorized and potential projects to be undertaken by the Corps of Engineers."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1342_sm.jpg",
          "alt": "Artists rendition of the entire Northwest--including existing dams and those that are proposed/under construction",
          "caption": "Map Of Northwest Dam Construction Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1342.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Map Of Northwest Dam Construction Engineer recruitment program)",
          "text": "Artists rendition of the entire Northwest--including existing dams and those that are proposed/under construction"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1225_sm.jpg",
          "alt": "Map shows approx. Hells Canyon to Walla Walla and dams in between.",
          "caption": "Map Of Projects Along The Snake River Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1225.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Map Of Projects Along The Snake River Engineer recruitment program)",
          "text": "Map shows approx. Hells Canyon to Walla Walla and dams in between."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1226_sm.jpg",
          "alt": "Artists rendition of Snake River area, including proposed Asotin Dam.",
          "caption": "Map Of Snake River And Proposed Dam Site Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1226.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Map Of Snake River And Proposed Dam Site Engineer recruitment program)",
          "text": "Artists rendition of Snake River area, including proposed Asotin Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1206_sm.jpg",
          "alt": "Looking upstream at McNary Lock and Dam, a Walla Walla district, U.S. Army, Corps of Engineers' project on the Columbia River, showing the 7,300-foot long multipurpose project with its lock, north and south shore fish ladders, spillway bays and powerhouse. The 38,800-acre reservoir stretches behind the dam 61 miles upstream to the Pasco Kennewick, Washington area.",
          "caption": "Mcnary Lock And Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1206.html"
        },
        "start_date": { 
          
          "year": "1966"
        },
        "text": {
          "headline": "Mcnary Lock And Dam Engineer recruitment program)",
          "text": "Looking upstream at McNary Lock and Dam, a Walla Walla district, U.S. Army, Corps of Engineers' project on the Columbia River, showing the 7,300-foot long multipurpose project with its lock, north and south shore fish ladders, spillway bays and powerhouse. The 38,800-acre reservoir stretches behind the dam 61 miles upstream to the Pasco Kennewick, Washington area."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1220_sm.jpg",
          "alt": "Bulldozer operating midstream on the Grande Ronde River upstream from La Grande, Oregon, in restoration effort of re-establishing river channel and shoring up the eroded embankments caused by the late January flood.",
          "caption": "Midstream Bulldozer Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1220.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Midstream Bulldozer Engineer recruitment program)",
          "text": "Bulldozer operating midstream on the Grande Ronde River upstream from La Grande, Oregon, in restoration effort of re-establishing river channel and shoring up the eroded embankments caused by the late January flood."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1215_sm.jpg",
          "alt": "The new Interstate Highway 80 bridge that will span the entrance to the artificial bay that will be created by the U.S. Army Corps of Engineers' John Day Dam Reservoir on the Columbia River at Arlington, Oregon, will be placed in use in June 1965. Shown in the lower part of the picture is the 15-acre newly prepared business section created by the artificial fill to elevation above the reservoir. The buildings in the center of the picture are not scheduled for demolishing until May 1967; however, access to the present temporary business district will be practically cut off once traffic is diverted across the new Interstate 80 bridge. With creating the John Day reservoir, the water will inundate the present temporary business section occupied by the buildings, and the new Arlington will be provided with a quay-type waterfront. The huge fill riverward is being used as a disposal center for rock and earth being removed in the grading of Interstate Highway 80 along the south-shore cliffs.",
          "caption": "New I 80 Bridge Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1215.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "New I 80 Bridge Engineer recruitment program)",
          "text": "The new Interstate Highway 80 bridge that will span the entrance to the artificial bay that will be created by the U.S. Army Corps of Engineers' John Day Dam Reservoir on the Columbia River at Arlington, Oregon, will be placed in use in June 1965. Shown in the lower part of the picture is the 15-acre newly prepared business section created by the artificial fill to elevation above the reservoir. The buildings in the center of the picture are not scheduled for demolishing until May 1967; however, access to the present temporary business district will be practically cut off once traffic is diverted across the new Interstate 80 bridge. With creating the John Day reservoir, the water will inundate the present temporary business section occupied by the buildings, and the new Arlington will be provided with a quay-type waterfront. The huge fill riverward is being used as a disposal center for rock and earth being removed in the grading of Interstate Highway 80 along the south-shore cliffs."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1212_sm.jpg",
          "alt": "A few miles above the south shore axis of the U.S. Army Corps of Engineers John Day Lock and Dam on the Columbia River, the newly relocated Interstate Highway 80N and the Union Pacific transcontinental main line swing across the John Day River. Here is shown the new four lane highway bridge at John Day and the new Union Pacific Bridge necessitated by the relocation work. Riverward from the two new crossings may be seen the old highway bridge and the Union Pacific bridge as they cross the John Day River at the present Columbia River level. Both of these approaches will be inundated with the creation of the John Day reservoir.",
          "caption": "New I80 North Bridge Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1212.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "New I80 North Bridge Engineer recruitment program)",
          "text": "A few miles above the south shore axis of the U.S. Army Corps of Engineers John Day Lock and Dam on the Columbia River, the newly relocated Interstate Highway 80N and the Union Pacific transcontinental main line swing across the John Day River. Here is shown the new four lane highway bridge at John Day and the new Union Pacific Bridge necessitated by the relocation work. Riverward from the two new crossings may be seen the old highway bridge and the Union Pacific bridge as they cross the John Day River at the present Columbia River level. Both of these approaches will be inundated with the creation of the John Day reservoir."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1194_sm.jpg",
          "alt": "An open letter advocating jobs with the Corps of Engineers to new engineering graduates",
          "caption": "Open Letter [01] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1194.html"
        },
        "start_date": { 
          
          "year": "1961"
        },
        "text": {
          "headline": "Open Letter [01] Engineer recruitment program)",
          "text": "An open letter advocating jobs with the Corps of Engineers to new engineering graduates"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1195_sm.jpg",
          "alt": "An open letter advocating jobs with the Corps of Engineers to new engineering graduates. Second page.",
          "caption": "Open Letter [02] Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1195.html"
        },
        "start_date": { 
          
          "year": "1961"
        },
        "text": {
          "headline": "Open Letter [02] Engineer recruitment program)",
          "text": "An open letter advocating jobs with the Corps of Engineers to new engineering graduates. Second page."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1197_sm.jpg",
          "alt": "A chart of the organizational structure of the Corps of Engineers.",
          "caption": "Organizational Structure Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1197.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Organizational Structure Engineer recruitment program)",
          "text": "A chart of the organizational structure of the Corps of Engineers."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1202_sm.jpg",
          "alt": "Estimates of energy requirements for the development of the Pacific Northwest, along with proposed projects to meet those needs.",
          "caption": "Power Loads And Resources Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1202.html"
        },
        "start_date": { 
          
          "year": "1960"
        },
        "text": {
          "headline": "Power Loads And Resources Engineer recruitment program)",
          "text": "Estimates of energy requirements for the development of the Pacific Northwest, along with proposed projects to meet those needs."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1228_sm.jpg",
          "alt": "Rendition of proposed Asotin dam. For description, please see photo 94-0 39",
          "caption": "Rendition Of Proposed Asotin Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1228.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Rendition Of Proposed Asotin Dam Engineer recruitment program)",
          "text": "Rendition of proposed Asotin dam. For description, please see photo 94-0 39"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1222_sm.jpg",
          "alt": "For description of the project, please see photo 94-0 32.",
          "caption": "Rendition Of Proposed Little Goose Lock And Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1222.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Rendition Of Proposed Little Goose Lock And Dam Engineer recruitment program)",
          "text": "For description of the project, please see photo 94-0 32."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1224_sm.jpg",
          "alt": "For description of the project, please see photo 94-0 35",
          "caption": "Rendition Of Proposed Lower Granite Dam Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1224.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Rendition Of Proposed Lower Granite Dam Engineer recruitment program)",
          "text": "For description of the project, please see photo 94-0 35"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1219_sm.jpg",
          "alt": "Bulldozer Jockeys have a special technique for flood fighting. It is a double action procedure of moving their equipment out into the flood stream bed and with the bulldozer blade widening the stream channel, at the same time pushing the blade load into a shore line embankment. Here is shown a bulldozer operation on the Walla Walla River in the Milton-Freewater area during the recent January flood. The channel widening, bank shoring processes can be visualized from the picture.",
          "caption": "Seagoing Bulldozer Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1219.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Seagoing Bulldozer Engineer recruitment program)",
          "text": "Bulldozer Jockeys have a special technique for flood fighting. It is a double action procedure of moving their equipment out into the flood stream bed and with the bulldozer blade widening the stream channel, at the same time pushing the blade load into a shore line embankment. Here is shown a bulldozer operation on the Walla Walla River in the Milton-Freewater area during the recent January flood. The channel widening, bank shoring processes can be visualized from the picture."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1218_sm.jpg",
          "alt": "A fair-sized acreage of logs, trash, and shore debris marks the 1964 spring runoff hazard at Ice Harbor Dam on the Snake River. The trash and debris are slowly worked towards the disposal tram which carries the debris to high ground for burning. In with this trash are some million or so board feet of commercial saw logs swept downstream when a Clearwater River log boom broke during high water. The private tug in this picture is attempting to pick out these logs for salvage.",
          "caption": "Trash Gathering Site Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1218.html"
        },
        "start_date": { 
          
          "year": "1964"
        },
        "text": {
          "headline": "Trash Gathering Site Engineer recruitment program)",
          "text": "A fair-sized acreage of logs, trash, and shore debris marks the 1964 spring runoff hazard at Ice Harbor Dam on the Snake River. The trash and debris are slowly worked towards the disposal tram which carries the debris to high ground for burning. In with this trash are some million or so board feet of commercial saw logs swept downstream when a Clearwater River log boom broke during high water. The private tug in this picture is attempting to pick out these logs for salvage."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1214_sm.jpg",
          "alt": "With diversion of the Columbia River through the North Shore spillway bays at the U.S Army Corps of Engineers' John Day Lock and Dam, barges and tows are now utilizing the temporary channel and permanent lock of the huge multipurpose project. Here is shown a tug with a pair of wheat barges in tow moving through the temporary channel, headed downstream for clearance through the John Day Lock. With completion of the project, this temporary channel will be inundated by the John Day Reservoir which will be nearly 100 feet in depth at this point.",
          "caption": "Wheat Barges Clear John Day Lock Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1214.html"
        },
        "start_date": { 
          
          "year": "1966"
        },
        "text": {
          "headline": "Wheat Barges Clear John Day Lock Engineer recruitment program)",
          "text": "With diversion of the Columbia River through the North Shore spillway bays at the U.S Army Corps of Engineers' John Day Lock and Dam, barges and tows are now utilizing the temporary channel and permanent lock of the huge multipurpose project. Here is shown a tug with a pair of wheat barges in tow moving through the temporary channel, headed downstream for clearance through the John Day Lock. With completion of the project, this temporary channel will be inundated by the John Day Reservoir which will be nearly 100 feet in depth at this point."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1223_sm.jpg",
          "alt": "In addition to a fleet of trucks, the Guy F. Atkinson Company of San Francisco, California, holder of the first stage construction contract at the U.S. Army, Corps of Engineers' Little Goose Lock and Dam site, has assigned two work barges with tugs. The fabrication of the cofferdam cells riverward from the work area behind which the Little Goose Dam will be constructed, is being carried on the high ground of what was once Little Goose Island. The barges and tugs are necessary to transport equipment from the south shore to Little Goose Island, where the cofferdam cell fabrication is underway. With completion of the cells, the Snake River will be diverted by an earthen embankment towards the north-shore, where and excavated diversion channel has been created.",
          "caption": "Work Barges Engineer recruitment program)",
          "link": "/digital/crbp/items/crbp1223.html"
        },
        "start_date": { 
          
          "year": "1965"
        },
        "text": {
          "headline": "Work Barges Engineer recruitment program)",
          "text": "In addition to a fleet of trucks, the Guy F. Atkinson Company of San Francisco, California, holder of the first stage construction contract at the U.S. Army, Corps of Engineers' Little Goose Lock and Dam site, has assigned two work barges with tugs. The fabrication of the cofferdam cells riverward from the work area behind which the Little Goose Dam will be constructed, is being carried on the high ground of what was once Little Goose Island. The barges and tugs are necessary to transport equipment from the south shore to Little Goose Island, where the cofferdam cell fabrication is underway. With completion of the cells, the Snake River will be diverted by an earthen embankment towards the north-shore, where and excavated diversion channel has been created."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp911_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, East Low Canal. Spec. #1422--Utah Construction Co. and Winston Bros. Co. Contractor. View showing section of 125 feet dragline boom from contractors Marion 151-M 6cu.yd. dragline after it collapsed at Station 380+00. Exposed rock after completion of drilling operations in center background. A.W. Bauman, Photographer",
          "caption": "Collapsed Dragline Boom",
          "link": "/digital/crbp/items/crbp911.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "02",
          "year": "1947"
        },
        "text": {
          "headline": "Collapsed Dragline Boom",
          "text": "Columbia Basin Project, Irrigation Division, East Low Canal. Spec. #1422--Utah Construction Co. and Winston Bros. Co. Contractor. View showing section of 125 feet dragline boom from contractors Marion 151-M 6cu.yd. dragline after it collapsed at Station 380+00. Exposed rock after completion of drilling operations in center background. A.W. Bauman, Photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp934_sm.jpg",
          "alt": "View of cracked and bent terminal stud on top of Westinghouse 230-kv bushing serial No. 3 for 36,000-kva transformers purchased under specifications No. 1025",
          "caption": "Cracked And Bent Terminal Stud",
          "link": "/digital/crbp/items/crbp934.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "30",
          "year": "1947"
        },
        "text": {
          "headline": "Cracked And Bent Terminal Stud",
          "text": "View of cracked and bent terminal stud on top of Westinghouse 230-kv bushing serial No. 3 for 36,000-kva transformers purchased under specifications No. 1025"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1338_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411, Utah Construction Company and Winston Bros. Co., Contractor. This photograph of two 2-inch I.R. insert bits. The one on the left is new. The one on the right has drilled approximately 1,000 lin. feet of basalt. The absence of one cutting edge does not lower the drilling rate appreciably. Mr. L. Moore the I.R. representative said the bit would work better if the opposite insert was knocked out. H.E. Foss, photographer",
          "caption": "Damaged Drill Bit",
          "link": "/digital/crbp/items/crbp1338.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "10",
          "year": "1949"
        },
        "text": {
          "headline": "Damaged Drill Bit",
          "text": "Columbia Basin Project, Irrigation Division, Soap Lake Siphon, Specifications 2411, Utah Construction Company and Winston Bros. Co., Contractor. This photograph of two 2-inch I.R. insert bits. The one on the left is new. The one on the right has drilled approximately 1,000 lin. feet of basalt. The absence of one cutting edge does not lower the drilling rate appreciably. Mr. L. Moore the I.R. representative said the bit would work better if the opposite insert was knocked out. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1334_sm.jpg",
          "alt": "View showing scorings on L-4 turbine shaft caused when packing gland burned out",
          "caption": "Damaged L-4 Turbine Shaft",
          "link": "/digital/crbp/items/crbp1334.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "09",
          "year": "1944"
        },
        "text": {
          "headline": "Damaged L-4 Turbine Shaft",
          "text": "View showing scorings on L-4 turbine shaft caused when packing gland burned out"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp900_sm.jpg",
          "alt": "This picture shows how the stack of material was dislodged and scattered thru car. Note broken sheets. See photo #18671-3. Damaged (broken and chipped) sheets of asbestos board as received in car B&O 270305, March 17, 1949. Shipment under Invitation 3177 from the Rocky Mountain Supply Co., Inc., Denver, Colorado",
          "caption": "Damaged Sheets Of Asbestos",
          "link": "/digital/crbp/items/crbp900.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "18",
          "year": "1949"
        },
        "text": {
          "headline": "Damaged Sheets Of Asbestos",
          "text": "This picture shows how the stack of material was dislodged and scattered thru car. Note broken sheets. See photo #18671-3. Damaged (broken and chipped) sheets of asbestos board as received in car B&O 270305, March 17, 1949. Shipment under Invitation 3177 from the Rocky Mountain Supply Co., Inc., Denver, Colorado"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1336_sm.jpg",
          "alt": "Unit L-7 thrust bearing shoe Y-3, position No. 3, photographed after failing on June 30th, 1948, after 5,353 hours of service. Grand Coulee Power Plant, Columbia Basin Project, Coulee Dam, Washington",
          "caption": "Damaged Thrust Bearing Show",
          "link": "/digital/crbp/items/crbp1336.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "01",
          "year": "1948"
        },
        "text": {
          "headline": "Damaged Thrust Bearing Show",
          "text": "Unit L-7 thrust bearing shoe Y-3, position No. 3, photographed after failing on June 30th, 1948, after 5,353 hours of service. Grand Coulee Power Plant, Columbia Basin Project, Coulee Dam, Washington"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp895_sm.jpg",
          "alt": "Rotating wearing ring unit L-1 turbine runner showing erosion of ring near top and bottom",
          "caption": "Erosion On L-1 Turbine Runner",
          "link": "/digital/crbp/items/crbp895.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "26",
          "year": "1946"
        },
        "text": {
          "headline": "Erosion On L-1 Turbine Runner",
          "text": "Rotating wearing ring unit L-1 turbine runner showing erosion of ring near top and bottom"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp925_sm.jpg",
          "alt": "Failure of L-3 Turbine. Note: deflector plates wedged between crown plate and runner looking east by south-east",
          "caption": "Failure Of L-3 Turbine [01]",
          "link": "/digital/crbp/items/crbp925.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "15",
          "year": "1945"
        },
        "text": {
          "headline": "Failure Of L-3 Turbine [01]",
          "text": "Failure of L-3 Turbine. Note: deflector plates wedged between crown plate and runner looking east by south-east"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp932_sm.jpg",
          "alt": "Failure of L-3 Turbine. Note: deflector plate on top of runner and the one deflector plate that was left in original position. Also scored condition of runner top rib",
          "caption": "Failure Of L-3 Turbine [02]",
          "link": "/digital/crbp/items/crbp932.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "15",
          "year": "1945"
        },
        "text": {
          "headline": "Failure Of L-3 Turbine [02]",
          "text": "Failure of L-3 Turbine. Note: deflector plate on top of runner and the one deflector plate that was left in original position. Also scored condition of runner top rib"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp901_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Concrete Laboratory, Ephrata, Washington. View shows fracture area of reinforcing steel specimens tested in laboratory tensile machine. The two-inch square butt-welded specimens, machined to 1 1/2 inches diameter before testing, due to limited capacity of tensile machine, show breaks both in weld and outside weld. Note slag pocket in specimens at left. Specimens on right broke outside weld and reduced end area was caused by necking of bar at break. H.E. Foss, photographer",
          "caption": "Fracture In Reinforcing Steel",
          "link": "/digital/crbp/items/crbp901.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Fracture In Reinforcing Steel",
          "text": "Columbia Basin Project, Irrigation Division, Concrete Laboratory, Ephrata, Washington. View shows fracture area of reinforcing steel specimens tested in laboratory tensile machine. The two-inch square butt-welded specimens, machined to 1 1/2 inches diameter before testing, due to limited capacity of tensile machine, show breaks both in weld and outside weld. Note slag pocket in specimens at left. Specimens on right broke outside weld and reduced end area was caused by necking of bar at break. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1340_sm.jpg",
          "alt": "The lower race of the east thrust bearing of the 51 upstream west outlet tube ring-seal gate at elevation 1036. It is part 19, drawing 222-D-2106, Specifications 744",
          "caption": "Lower Race Of The East Thrust Bearing",
          "link": "/digital/crbp/items/crbp1340.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "28",
          "year": "1942"
        },
        "text": {
          "headline": "Lower Race Of The East Thrust Bearing",
          "text": "The lower race of the east thrust bearing of the 51 upstream west outlet tube ring-seal gate at elevation 1036. It is part 19, drawing 222-D-2106, Specifications 744"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp896_sm.jpg",
          "alt": "Painted surface of scroll cast--turbine L-2. This view shows the condition of the paint in the scroll case and guide vanes of the speed ring.",
          "caption": "Painted Surface Of Scroll Case - Turbine L-2",
          "link": "/digital/crbp/items/crbp896.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "13",
          "year": "1942"
        },
        "text": {
          "headline": "Painted Surface Of Scroll Case - Turbine L-2",
          "text": "Painted surface of scroll cast--turbine L-2. This view shows the condition of the paint in the scroll case and guide vanes of the speed ring."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp899_sm.jpg",
          "alt": "Painted surface of wicket gate--Turbine L-2. This view is representative of the painted surface on the outer face of the wicket gates and shows the alligatoring of the paint along the trailing edge.",
          "caption": "Painted Surface Of Wicket Gate",
          "link": "/digital/crbp/items/crbp899.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "13",
          "year": "1942"
        },
        "text": {
          "headline": "Painted Surface Of Wicket Gate",
          "text": "Painted surface of wicket gate--Turbine L-2. This view is representative of the painted surface on the outer face of the wicket gates and shows the alligatoring of the paint along the trailing edge."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp904_sm.jpg",
          "alt": "Repairs to L-3 packing box. Boring arm making second cut.",
          "caption": "Repairs To L-3",
          "link": "/digital/crbp/items/crbp904.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "25",
          "year": "1942"
        },
        "text": {
          "headline": "Repairs To L-3",
          "text": "Repairs to L-3 packing box. Boring arm making second cut."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp894_sm.jpg",
          "alt": "View showing sand and water erosion of the bronze upper casing ring of pump number 2 (south pump) Pasco Pumping Plant after operation during a part of the 1948 irrigation season. Pump is Worthington vertical shaft volute type, 600 R.P.M. with discharge of 63 cu. ft. per second against TDH of 167 feet. A.F. Swanson, Cameraman.",
          "caption": "Result Of Sand And Water Erosion",
          "link": "/digital/crbp/items/crbp894.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "05",
          "year": "1948"
        },
        "text": {
          "headline": "Result Of Sand And Water Erosion",
          "text": "View showing sand and water erosion of the bronze upper casing ring of pump number 2 (south pump) Pasco Pumping Plant after operation during a part of the 1948 irrigation season. Pump is Worthington vertical shaft volute type, 600 R.P.M. with discharge of 63 cu. ft. per second against TDH of 167 feet. A.F. Swanson, Cameraman."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1335_sm.jpg",
          "alt": "Scoring of the leading side of generator break piston #1 due to its tilting during jacking of the rotor. Top of piston is in lathe chuck--leather is removed from the bottom of piston. Unit L-1, Grand Coulee Power Plant",
          "caption": "Scoring On Brake Piston",
          "link": "/digital/crbp/items/crbp1335.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "16",
          "year": "1946"
        },
        "text": {
          "headline": "Scoring On Brake Piston",
          "text": "Scoring of the leading side of generator break piston #1 due to its tilting during jacking of the rotor. Top of piston is in lathe chuck--leather is removed from the bottom of piston. Unit L-1, Grand Coulee Power Plant"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp898_sm.jpg",
          "alt": "Surface of vanes of turbine runner L-2. This view of the inner surface of the runner vanes shows where the paint has been eroded to bright metal along the trailing edge of the vanes. The bright surfaces had a sand blasted appearance as evidence of cavitation. The light molting of these areas shown on the photograph is not pitting, but is rust which quickly formed on the vanes.",
          "caption": "Surface Vanes Of Turbine Runner L-2",
          "link": "/digital/crbp/items/crbp898.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "13",
          "year": "1942"
        },
        "text": {
          "headline": "Surface Vanes Of Turbine Runner L-2",
          "text": "Surface of vanes of turbine runner L-2. This view of the inner surface of the runner vanes shows where the paint has been eroded to bright metal along the trailing edge of the vanes. The bright surfaces had a sand blasted appearance as evidence of cavitation. The light molting of these areas shown on the photograph is not pitting, but is rust which quickly formed on the vanes."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp902_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division--Concrete Laboratory, Ephrata, Washington. Photo illustrates method used to test efficiency of two-inch square butt-welded reinforcing steep specimens being placed on Soap Lake Siphon contract. Test specimens have been turned down to 1 1/2 inch diameter in vicinity of weld before testing, due to limited capacity of tensile machine. Two specimens shown failed in weld while third broke outside weld. H.E. Foss, photographer.",
          "caption": "Testing Reinforcing Steel",
          "link": "/digital/crbp/items/crbp902.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1949"
        },
        "text": {
          "headline": "Testing Reinforcing Steel",
          "text": "Columbia Basin Project--Irrigation Division--Concrete Laboratory, Ephrata, Washington. Photo illustrates method used to test efficiency of two-inch square butt-welded reinforcing steep specimens being placed on Soap Lake Siphon contract. Test specimens have been turned down to 1 1/2 inch diameter in vicinity of weld before testing, due to limited capacity of tensile machine. Two specimens shown failed in weld while third broke outside weld. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp933_sm.jpg",
          "alt": "View of eight thrust bearing discs for unit L-3. The discs are laying upside down to indicate worn spots in the centers where the jack screws had made contact. The depth of these holes varied from 0.005' to 0.007' Grand Coulee Power Plant--Columbia Basin Project.",
          "caption": "Thrust Bearing Discs For Unit L-3",
          "link": "/digital/crbp/items/crbp933.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "22",
          "year": "1945"
        },
        "text": {
          "headline": "Thrust Bearing Discs For Unit L-3",
          "text": "View of eight thrust bearing discs for unit L-3. The discs are laying upside down to indicate worn spots in the centers where the jack screws had made contact. The depth of these holes varied from 0.005' to 0.007' Grand Coulee Power Plant--Columbia Basin Project."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp959_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Bacon Tunnel. Photo shows \"mucker\" working inside the tunnel, T.E. Connolly Company, Inc., contractor. Location approx. 5 miles south of Coulee City, Wash.",
          "caption": "Mucker Working Inside A Tunnel",
          "link": "/digital/crbp/items/crbp959.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "19",
          "year": "1946"
        },
        "text": {
          "headline": "Mucker Working Inside A Tunnel",
          "text": "Columbia Basin Project, Irrigation Division, Bacon Tunnel. Photo shows \"mucker\" working inside the tunnel, T.E. Connolly Company, Inc., contractor. Location approx. 5 miles south of Coulee City, Wash."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp972_sm.jpg",
          "alt": "Transfer of 115-tin coaster gate from east forebay, Unit R-9 to west forebay, Unit L-7. This transfer (made on war surplus steel pontoon barge) will expedite starting of unit L-7 by approximately three weeks. This picture shows the coaster gate resting on front and rear trucks in position to be moved forward to approximate center of barge. Wheel stops clamped to rails will secure barge in final position ready for transfer to west abutment. Brittly hitch with sheave block for four part 3/4' drawl line to steam winch on work barge is shown at left center. Transverse timbers on barge deck supporting 36'-64'-0' long 230# 'I' beams, with 90# rails attached, distribute the load to 107' by 43' pontoon barge. Special gate stem and hitch plates to 150-Ton deck crane are shown at right center. 1 1/4' snub cables with turnbuckles for limiting barge submergence are to be seen along face of dam at left of picture. Snub cables were rigged from gantry girders on deck crane to hitch plates welded to 36' 'I' beams. Work barge, not seen in picture, is lashed to front of pontoon barge.",
          "caption": "115-Ton Coaster Gate On War Surplus Pontoon",
          "link": "/digital/crbp/items/crbp972.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "09",
          "year": "1947"
        },
        "text": {
          "headline": "115-Ton Coaster Gate On War Surplus Pontoon",
          "text": "Transfer of 115-tin coaster gate from east forebay, Unit R-9 to west forebay, Unit L-7. This transfer (made on war surplus steel pontoon barge) will expedite starting of unit L-7 by approximately three weeks. This picture shows the coaster gate resting on front and rear trucks in position to be moved forward to approximate center of barge. Wheel stops clamped to rails will secure barge in final position ready for transfer to west abutment. Brittly hitch with sheave block for four part 3/4' drawl line to steam winch on work barge is shown at left center. Transverse timbers on barge deck supporting 36'-64'-0' long 230# 'I' beams, with 90# rails attached, distribute the load to 107' by 43' pontoon barge. Special gate stem and hitch plates to 150-Ton deck crane are shown at right center. 1 1/4' snub cables with turnbuckles for limiting barge submergence are to be seen along face of dam at left of picture. Snub cables were rigged from gantry girders on deck crane to hitch plates welded to 36' 'I' beams. Work barge, not seen in picture, is lashed to front of pontoon barge."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp961_sm.jpg",
          "alt": "close up view of three diamond core drill bits",
          "caption": "3 Diamond Core Drills",
          "link": "/digital/crbp/items/crbp961.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "26",
          "year": "1941"
        },
        "text": {
          "headline": "3 Diamond Core Drills",
          "text": "close up view of three diamond core drill bits"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp965_sm.jpg",
          "alt": "air compressors in power house",
          "caption": "Air Compressors",
          "link": "/digital/crbp/items/crbp965.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "10",
          "year": "1941"
        },
        "text": {
          "headline": "Air Compressors",
          "text": "air compressors in power house"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1032_sm.jpg",
          "alt": "Look at that beautiful water, Maw,' exclaimed Mr. George C. Green to his wife as the viewed the Grand Coulee Dam spillway from the parking lot overlooking the west powerhouse. His statement was not unusual in the way of tourists but the mode of transportation was certainly extreme, a 1904 Oldsmobile. Mr. and Mrs. Green traveled from Lambertsville, New Jersey to Coulee Dam, covering nearly 6000 miles enroute and planned on going through California in return",
          "caption": "Couple From New Jersey Visits The Dam",
          "link": "/digital/crbp/items/crbp1032.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "23",
          "year": "1946"
        },
        "text": {
          "headline": "Couple From New Jersey Visits The Dam",
          "text": "Look at that beautiful water, Maw,' exclaimed Mr. George C. Green to his wife as the viewed the Grand Coulee Dam spillway from the parking lot overlooking the west powerhouse. His statement was not unusual in the way of tourists but the mode of transportation was certainly extreme, a 1904 Oldsmobile. Mr. and Mrs. Green traveled from Lambertsville, New Jersey to Coulee Dam, covering nearly 6000 miles enroute and planned on going through California in return"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp975_sm.jpg",
          "alt": "Approximately 750,000 tons of granite will be used to loop the banks of the Columbia River below Grand Coulee Dam, protecting the shores against the 10-million horsepower in energy which the waves spent after their 350-foot fall over the dam. Above, 20-yard Euclid truck, with two motors and powered steering wheel, dumps a couple of big ones.",
          "caption": "Eucluid Truck Dumps Granite In Front Of Grand Coulee",
          "link": "/digital/crbp/items/crbp975.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "11",
          "year": "1950"
        },
        "text": {
          "headline": "Eucluid Truck Dumps Granite In Front Of Grand Coulee",
          "text": "Approximately 750,000 tons of granite will be used to loop the banks of the Columbia River below Grand Coulee Dam, protecting the shores against the 10-million horsepower in energy which the waves spent after their 350-foot fall over the dam. Above, 20-yard Euclid truck, with two motors and powered steering wheel, dumps a couple of big ones."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp976_sm.jpg",
          "alt": "Although this truck alone weighs almost 60,000 pounds, it's not uncommon for one or two huge granite armor rocks to lift the front wheels clear of the ground. A dozer, blade visible at left, solved the truck drivers dilemma in this problem. The trucks can carry 20-30 tons, and sometimes one rock is an entire load. Approximately a year and one-half will be required to line the banks for close to one mile downstream from the Grand Coulee Dam.",
          "caption": "Eucluid Truck Dumps Granite In Front Of Grand Coulee",
          "link": "/digital/crbp/items/crbp976.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "11",
          "year": "1950"
        },
        "text": {
          "headline": "Eucluid Truck Dumps Granite In Front Of Grand Coulee",
          "text": "Although this truck alone weighs almost 60,000 pounds, it's not uncommon for one or two huge granite armor rocks to lift the front wheels clear of the ground. A dozer, blade visible at left, solved the truck drivers dilemma in this problem. The trucks can carry 20-30 tons, and sometimes one rock is an entire load. Approximately a year and one-half will be required to line the banks for close to one mile downstream from the Grand Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp957_sm.jpg",
          "alt": "Gear system used in moving large crane on top of dam. These gears are connected to wheels resting on track that extends entirely across dam.",
          "caption": "Gear System For Moving Crane",
          "link": "/digital/crbp/items/crbp957.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1942"
        },
        "text": {
          "headline": "Gear System For Moving Crane",
          "text": "Gear system used in moving large crane on top of dam. These gears are connected to wheels resting on track that extends entirely across dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp969_sm.jpg",
          "alt": "Grand Coulee Dam Seismograph Station, showing seismograph equipment before installation, arranged only for photographic purposes. Dr. Dead S. Carder of the U.S. Coast and Geodetic Survey is simulating the adjustment of position of galvanometers on the Benioff film recorder. In the right foreground is the 10-cycle tuning fork amplifier, and in the back, a horizontal and vertical seismometer",
          "caption": "Grand Coulee Dam Seismograph Station",
          "link": "/digital/crbp/items/crbp969.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "16",
          "year": "1942"
        },
        "text": {
          "headline": "Grand Coulee Dam Seismograph Station",
          "text": "Grand Coulee Dam Seismograph Station, showing seismograph equipment before installation, arranged only for photographic purposes. Dr. Dead S. Carder of the U.S. Coast and Geodetic Survey is simulating the adjustment of position of galvanometers on the Benioff film recorder. In the right foreground is the 10-cycle tuning fork amplifier, and in the back, a horizontal and vertical seismometer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp966_sm.jpg",
          "alt": "Grant pumps and grant building",
          "caption": "Grant Pumps",
          "link": "/digital/crbp/items/crbp966.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "29",
          "year": "1941"
        },
        "text": {
          "headline": "Grant Pumps",
          "text": "Grant pumps and grant building"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp960_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division, Adrian Gravel Plant--Specifications #1475. Cedar Rapids 20' x 36' primary crusher with jaws set at 3 inches, located at Adrian Gravel Plant. Feed hopper is shown at left and blending sand conveyor belt is in foreground.",
          "caption": "Gravel Crusher",
          "link": "/digital/crbp/items/crbp960.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "02",
          "year": "1948"
        },
        "text": {
          "headline": "Gravel Crusher",
          "text": "Columbia Basin Project--Irrigation Division, Adrian Gravel Plant--Specifications #1475. Cedar Rapids 20' x 36' primary crusher with jaws set at 3 inches, located at Adrian Gravel Plant. Feed hopper is shown at left and blending sand conveyor belt is in foreground."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp967_sm.jpg",
          "alt": "This picture is an interior view of the Allis-Chalmers governor for Shasta unit U1 in L7 position showing the speedball motor, relay, and operating linkages",
          "caption": "Interior View Of Shasta Unit",
          "link": "/digital/crbp/items/crbp967.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "24",
          "year": "1943"
        },
        "text": {
          "headline": "Interior View Of Shasta Unit",
          "text": "This picture is an interior view of the Allis-Chalmers governor for Shasta unit U1 in L7 position showing the speedball motor, relay, and operating linkages"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp955_sm.jpg",
          "alt": "Hitch used for lifting on end of 85 ton shaft",
          "caption": "Lifting Shaft",
          "link": "/digital/crbp/items/crbp955.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "11",
          "year": "1941"
        },
        "text": {
          "headline": "Lifting Shaft",
          "text": "Hitch used for lifting on end of 85 ton shaft"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp954_sm.jpg",
          "alt": "The Bucyrus-Erie electrical shovel loading riprap from the quarry, into a 20-yard Euclid truck. Specifications No. 2808, River Channel Improvements. Contractor: Morrison Knudsen Company, Inc. Grand Coulee Dam, Columbia Basin Project, Washington",
          "caption": "Loading Riprap From The Quarry",
          "link": "/digital/crbp/items/crbp954.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Loading Riprap From The Quarry",
          "text": "The Bucyrus-Erie electrical shovel loading riprap from the quarry, into a 20-yard Euclid truck. Specifications No. 2808, River Channel Improvements. Contractor: Morrison Knudsen Company, Inc. Grand Coulee Dam, Columbia Basin Project, Washington"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp963_sm.jpg",
          "alt": "Specifications No. 2329. Picture Series 18532-3 through 18537-3. Morrison-Knudsen Co., Inc., and Peter Kiewit Sons' Co., subcontractor, Consolidated Western Steel Corp., Electric City Yard. A view of the process of mounting the stiffener rings on the discharge pipe with the aid of a compressed air-activated bull press. Rings are fabricated from quarter segments, with one joint being welded to the pipe as temporary lugs to keep the ring in alignment. 'The Bull' presses the ring into firm contact with the pipe and it is tack welded with a 4 inch fillet weld. The pipe is revolved approximately one foot by the positioning rollers, and the process is repeated until the ring is entirely tack welded. The pipe will then be rolled down the line to an automatic welder set-up (picture 18532-3) where a full fillet weld will be placed on both sides of the stiffener rings to complete the pipe for placing in the tunnel.",
          "caption": "Mounting Stiffener Rings On The Discharge Pipe",
          "link": "/digital/crbp/items/crbp963.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "01",
          "year": "1949"
        },
        "text": {
          "headline": "Mounting Stiffener Rings On The Discharge Pipe",
          "text": "Specifications No. 2329. Picture Series 18532-3 through 18537-3. Morrison-Knudsen Co., Inc., and Peter Kiewit Sons' Co., subcontractor, Consolidated Western Steel Corp., Electric City Yard. A view of the process of mounting the stiffener rings on the discharge pipe with the aid of a compressed air-activated bull press. Rings are fabricated from quarter segments, with one joint being welded to the pipe as temporary lugs to keep the ring in alignment. 'The Bull' presses the ring into firm contact with the pipe and it is tack welded with a 4 inch fillet weld. The pipe is revolved approximately one foot by the positioning rollers, and the process is repeated until the ring is entirely tack welded. The pipe will then be rolled down the line to an automatic welder set-up (picture 18532-3) where a full fillet weld will be placed on both sides of the stiffener rings to complete the pipe for placing in the tunnel."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp970_sm.jpg",
          "alt": "Lubricating and insulating oils, received in tank cars, are stored in a lower section of the control bay. Tanks are provided for new and used oils of both kinds; and, oil can be pumped to or from any power unit. Oil pumping equipment, with air compressors and banks of carbon dioxide tanks, occupy a room adjoining the oil tank vault.",
          "caption": "Oil Storage Tanks",
          "link": "/digital/crbp/items/crbp970.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "10",
          "year": "1941"
        },
        "text": {
          "headline": "Oil Storage Tanks",
          "text": "Lubricating and insulating oils, received in tank cars, are stored in a lower section of the control bay. Tanks are provided for new and used oils of both kinds; and, oil can be pumped to or from any power unit. Oil pumping equipment, with air compressors and banks of carbon dioxide tanks, occupy a room adjoining the oil tank vault."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp962_sm.jpg",
          "alt": "Columbia Basin Project--Irrigation Division--Main Canal--Western Contracting Corp., contractor--Specifications No. 2324. This view is intended to show the transparent plastic hose used on the discharge side of the AEA pump. The plastic hose gives visible proof that the AEA being dispensed in each batch of concrete actually feeds into the mixer. The contractor built the gravity type dispense shown in photo and it has been performing very well. H.E. Foss, photographer.",
          "caption": "Plastic Hose On The Aea Pump",
          "link": "/digital/crbp/items/crbp962.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "21",
          "year": "1949"
        },
        "text": {
          "headline": "Plastic Hose On The Aea Pump",
          "text": "Columbia Basin Project--Irrigation Division--Main Canal--Western Contracting Corp., contractor--Specifications No. 2324. This view is intended to show the transparent plastic hose used on the discharge side of the AEA pump. The plastic hose gives visible proof that the AEA being dispensed in each batch of concrete actually feeds into the mixer. The contractor built the gravity type dispense shown in photo and it has been performing very well. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp971_sm.jpg",
          "alt": "Reboring drum gate girder. Machine shop--powerhouse",
          "caption": "Reboring Drum Gate Grinder",
          "link": "/digital/crbp/items/crbp971.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "22",
          "year": "1941"
        },
        "text": {
          "headline": "Reboring Drum Gate Grinder",
          "text": "Reboring drum gate girder. Machine shop--powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1028_sm.jpg",
          "alt": "Spider on west end of dam enroute to right powerhouse. The dimensions of the spider are: Length; 27'-7' Width; 16'-4' Depth; 6'-1'",
          "caption": "Spider On Dam",
          "link": "/digital/crbp/items/crbp1028.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "22",
          "year": "1948"
        },
        "text": {
          "headline": "Spider On Dam",
          "text": "Spider on west end of dam enroute to right powerhouse. The dimensions of the spider are: Length; 27'-7' Width; 16'-4' Depth; 6'-1'"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp973_sm.jpg",
          "alt": "One steel casing for a giant turbine at the Grand Coulee Dam makes a full carload. Water from the Columbia River, falling through this 16-foot runner at the rate of 141 tons a second, will drive the biggest electric generator ever built, to produce electricity for the manufacture of aluminum, vital need of the defense program.",
          "caption": "Steel Casing From Turbine",
          "link": "/digital/crbp/items/crbp973.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "03",
          "year": "1941"
        },
        "text": {
          "headline": "Steel Casing From Turbine",
          "text": "One steel casing for a giant turbine at the Grand Coulee Dam makes a full carload. Water from the Columbia River, falling through this 16-foot runner at the rate of 141 tons a second, will drive the biggest electric generator ever built, to produce electricity for the manufacture of aluminum, vital need of the defense program."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp952_sm.jpg",
          "alt": "Men test a large block and hook attached to a crane",
          "caption": "Testing Block And Hook",
          "link": "/digital/crbp/items/crbp952.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1940"
        },
        "text": {
          "headline": "Testing Block And Hook",
          "text": "Men test a large block and hook attached to a crane"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp956_sm.jpg",
          "alt": "One hundred fifty ton gentry crane being tested. Crane is lifting a thirty-seven and one half ton concrete block. This machine was built by Star Manufacturing Company of Tacoma, Washington and is installed on tracks reaching across the top of the dam.",
          "caption": "Testing Gantry Crane",
          "link": "/digital/crbp/items/crbp956.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1942"
        },
        "text": {
          "headline": "Testing Gantry Crane",
          "text": "One hundred fifty ton gentry crane being tested. Crane is lifting a thirty-seven and one half ton concrete block. This machine was built by Star Manufacturing Company of Tacoma, Washington and is installed on tracks reaching across the top of the dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp998_sm.jpg",
          "alt": "Due to lack of proper transportation equipment, difficulty was encountered in taking the R-1 rotor shaft across the spillway roadway of the dam. In order to distribute the load safely, it was necessary for this truck boom to hook onto the trailer and take some of the weight off the wheels of the trailer. (See photos 17601 and 17602-3). F.B Pomeroy, photographer",
          "caption": "Transporting A Rotor Shaft",
          "link": "/digital/crbp/items/crbp998.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "21",
          "year": "1948"
        },
        "text": {
          "headline": "Transporting A Rotor Shaft",
          "text": "Due to lack of proper transportation equipment, difficulty was encountered in taking the R-1 rotor shaft across the spillway roadway of the dam. In order to distribute the load safely, it was necessary for this truck boom to hook onto the trailer and take some of the weight off the wheels of the trailer. (See photos 17601 and 17602-3). F.B Pomeroy, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp978_sm.jpg",
          "alt": "Method of suspending 1/2 of cooling barge for transportation",
          "caption": "Transporting Cooling Barge",
          "link": "/digital/crbp/items/crbp978.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "25",
          "year": "1941"
        },
        "text": {
          "headline": "Transporting Cooling Barge",
          "text": "Method of suspending 1/2 of cooling barge for transportation"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1008_sm.jpg",
          "alt": "Placing for R-1 scroll case on the trailer in the Electric City yards preparatory to transporting it to the East powerhouse. July 16, 1948",
          "caption": "Transporting R-1 Scroll Case",
          "link": "/digital/crbp/items/crbp1008.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "16",
          "year": "1948"
        },
        "text": {
          "headline": "Transporting R-1 Scroll Case",
          "text": "Placing for R-1 scroll case on the trailer in the Electric City yards preparatory to transporting it to the East powerhouse. July 16, 1948"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp977_sm.jpg",
          "alt": "Transporting spider to the powerhouse--Grand Coulee in background.",
          "caption": "Transporting Spider To Powerhouse",
          "link": "/digital/crbp/items/crbp977.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "17",
          "year": "1941"
        },
        "text": {
          "headline": "Transporting Spider To Powerhouse",
          "text": "Transporting spider to the powerhouse--Grand Coulee in background."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp986_sm.jpg",
          "alt": "Synchronized trucks handling huge, heavy section of steel roof girder, transporting it to the east powerhouse",
          "caption": "Transporting Steel Girder",
          "link": "/digital/crbp/items/crbp986.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "05",
          "year": "1942"
        },
        "text": {
          "headline": "Transporting Steel Girder",
          "text": "Synchronized trucks handling huge, heavy section of steel roof girder, transporting it to the east powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp964_sm.jpg",
          "alt": "A centrifugal oil purifier, a filter, and automatic electric heater, and meter, pumps, gauges, pipes, and necessary appurtenances are mounted on a simple truck for use in various parts of the plant. The unit is designed to handle lubricating, governor, and insulating oils. Operating on insulating oil at about 90 degrees, the centrifuge is guaranteed to reduce moisture from 1/10 percent to 1/1000 percent in 1200 gallons of oil per hour, and to raise its dielectric strength to at least 30,000 volts. The filter, designed to remove carbon and fine particles that pass the centrifuge, take standard 12 inch filter papers.",
          "caption": "Truck-Mounted Equipment",
          "link": "/digital/crbp/items/crbp964.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "10",
          "year": "1941"
        },
        "text": {
          "headline": "Truck-Mounted Equipment",
          "text": "A centrifugal oil purifier, a filter, and automatic electric heater, and meter, pumps, gauges, pipes, and necessary appurtenances are mounted on a simple truck for use in various parts of the plant. The unit is designed to handle lubricating, governor, and insulating oils. Operating on insulating oil at about 90 degrees, the centrifuge is guaranteed to reduce moisture from 1/10 percent to 1/1000 percent in 1200 gallons of oil per hour, and to raise its dielectric strength to at least 30,000 volts. The filter, designed to remove carbon and fine particles that pass the centrifuge, take standard 12 inch filter papers."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp958_sm.jpg",
          "alt": "Columbia Basin Project, Grand Coulee Dam. A view of the vertical lift hoist, block 10, with cable trays on either side and transit conduit in the background",
          "caption": "Vertical Lift Hoist",
          "link": "/digital/crbp/items/crbp958.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "26",
          "year": "1941"
        },
        "text": {
          "headline": "Vertical Lift Hoist",
          "text": "Columbia Basin Project, Grand Coulee Dam. A view of the vertical lift hoist, block 10, with cable trays on either side and transit conduit in the background"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp974_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Potholes Dam. Right rear view of contractors 24 cubic yard bottom dump Euclid. Note size of tires. Man in picture is six feet tall. Despite its size and weight, this piece of equipment has excellent floatation and traction.",
          "caption": "View Of Bottom Dump Euclid",
          "link": "/digital/crbp/items/crbp974.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "04",
          "year": "1947"
        },
        "text": {
          "headline": "View Of Bottom Dump Euclid",
          "text": "Columbia Basin Project, Irrigation Division, Potholes Dam. Right rear view of contractors 24 cubic yard bottom dump Euclid. Note size of tires. Man in picture is six feet tall. Despite its size and weight, this piece of equipment has excellent floatation and traction."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp912_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Moses Lake Development Farm 2 miles east of Moses Lake. Twelve hours after a 3/4 inch rain which fell between 5pm to 10pm September 16th, water was standing in alternate furrows in the low flat areas of the Netted Gem potato field. Eighteen days after the last irrigation, which gives indication of the slow rate of penetration in this field. This shows the effect of compaction by tractor wheels in rows with water-Art Bauman left and J.L. Toevs right. H. Foss, cameraman. Taken for Land Development Section",
          "caption": "Inspecting A Potato Field",
          "link": "/digital/crbp/items/crbp912.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "17",
          "year": "1947"
        },
        "text": {
          "headline": "Inspecting A Potato Field",
          "text": "Columbia Basin Project, Irrigation Division. Moses Lake Development Farm 2 miles east of Moses Lake. Twelve hours after a 3/4 inch rain which fell between 5pm to 10pm September 16th, water was standing in alternate furrows in the low flat areas of the Netted Gem potato field. Eighteen days after the last irrigation, which gives indication of the slow rate of penetration in this field. This shows the effect of compaction by tractor wheels in rows with water-Art Bauman left and J.L. Toevs right. H. Foss, cameraman. Taken for Land Development Section"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1333_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Typical pasture scene at the A.R. Thurman farm, Unit 27. Many settlers on the project are acquiring fine dairy herds. H. Foss, photographer",
          "caption": "A.R. Thurman Farm",
          "link": "/digital/crbp/items/crbp1333.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "A.R. Thurman Farm",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Typical pasture scene at the A.R. Thurman farm, Unit 27. Many settlers on the project are acquiring fine dairy herds. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1312_sm.jpg",
          "alt": "Advancing end of 21 inch reinforced (Class A-50' head) concrete pipe on the Burbank Pump Laterals HP 1.1 Station 50+25. Note groove of pipe filled with mortar. This feature under construction by Mathews Brothers about 7 miles east of Pasco, Washington. Specifications R1-CB-13. A.F. Swanson, photographer",
          "caption": "Advancing End Of Irrigation Pipe",
          "link": "/digital/crbp/items/crbp1312.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "27",
          "year": "1949"
        },
        "text": {
          "headline": "Advancing End Of Irrigation Pipe",
          "text": "Advancing end of 21 inch reinforced (Class A-50' head) concrete pipe on the Burbank Pump Laterals HP 1.1 Station 50+25. Note groove of pipe filled with mortar. This feature under construction by Mathews Brothers about 7 miles east of Pasco, Washington. Specifications R1-CB-13. A.F. Swanson, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1303_sm.jpg",
          "alt": "View showing application of curing compound to newly placed 3-inch concrete lining on the Pasco Pump Lateral system which is under construction by J. A. Terteling and Sons, Inc. Specifications 1230, PPL Sta. 45+00, 10 to 15 miles northwest of Pasco, Washington",
          "caption": "Application Of Concrete Curing Compound At Pasco Pump",
          "link": "/digital/crbp/items/crbp1303.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "15",
          "year": "1947"
        },
        "text": {
          "headline": "Application Of Concrete Curing Compound At Pasco Pump",
          "text": "View showing application of curing compound to newly placed 3-inch concrete lining on the Pasco Pump Lateral system which is under construction by J. A. Terteling and Sons, Inc. Specifications 1230, PPL Sta. 45+00, 10 to 15 miles northwest of Pasco, Washington"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1301_sm.jpg",
          "alt": "View showing application of mixture of heated 60-70 penetration asphalt and diatomaceous earth to subgrade which has previously had two applications of headed RC-0 asphalt. This is an experimental prime membrane lining section on Pasco Pump Lateral System PPL Sta. 438+64 to 447+91.8. This feature under construction by J.A. Terteling and Sons, Inc., Specifications 1230.",
          "caption": "Applying Heated Asphalt",
          "link": "/digital/crbp/items/crbp1301.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "19",
          "year": "1947"
        },
        "text": {
          "headline": "Applying Heated Asphalt",
          "text": "View showing application of mixture of heated 60-70 penetration asphalt and diatomaceous earth to subgrade which has previously had two applications of headed RC-0 asphalt. This is an experimental prime membrane lining section on Pasco Pump Lateral System PPL Sta. 438+64 to 447+91.8. This feature under construction by J.A. Terteling and Sons, Inc., Specifications 1230."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1302_sm.jpg",
          "alt": "View looking downstream showing asphalt lining operations on 3-foot bottom lateral on Pasco Pump Lateral System, PP-1.8, Sta. 11+00. This feature under construction by J.A. Terteling and Sons, Inc., Specifications 1230",
          "caption": "Asphalt Lining Operations At Pasco Pump",
          "link": "/digital/crbp/items/crbp1302.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "23",
          "year": "1947"
        },
        "text": {
          "headline": "Asphalt Lining Operations At Pasco Pump",
          "text": "View looking downstream showing asphalt lining operations on 3-foot bottom lateral on Pasco Pump Lateral System, PP-1.8, Sta. 11+00. This feature under construction by J.A. Terteling and Sons, Inc., Specifications 1230"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1308_sm.jpg",
          "alt": "View showing automatic siphon on Pasco Pump Lateral system, PP-6.0 Sta. 52+00. This feature constructed by J.A. Terteling and Sons, Inc., Specifications 1230",
          "caption": "Automatic Siphon",
          "link": "/digital/crbp/items/crbp1308.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "06",
          "year": "1947"
        },
        "text": {
          "headline": "Automatic Siphon",
          "text": "View showing automatic siphon on Pasco Pump Lateral system, PP-6.0 Sta. 52+00. This feature constructed by J.A. Terteling and Sons, Inc., Specifications 1230"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1326_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Close-up of corn stalks at Development Farm at Moses Lake.",
          "caption": "Close Up Of Corn",
          "link": "/digital/crbp/items/crbp1326.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "12",
          "year": "1947"
        },
        "text": {
          "headline": "Close Up Of Corn",
          "text": "Columbia Basin Project, Irrigation Division. Close-up of corn stalks at Development Farm at Moses Lake."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1332_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Corn crop at Moses Lake Predevelopment Farm. A.W. Bauman, photographer",
          "caption": "Corn Crop",
          "link": "/digital/crbp/items/crbp1332.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "12",
          "year": "1947"
        },
        "text": {
          "headline": "Corn Crop",
          "text": "Columbia Basin Project, Irrigation Division. Corn crop at Moses Lake Predevelopment Farm. A.W. Bauman, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1316_sm.jpg",
          "alt": "Cracked 18' irrigation pipe on Pasco Pump Laterals PP-6.0-0.5-1.3 Station 86+74.5-87+01.5 looking upstream. Pipe burst due to internal pressure when testing pipeline. Pipe laid in October, 1946. Tested October, 1948. A.F. Swanson, photographer",
          "caption": "Cracked Irrigation Pipe",
          "link": "/digital/crbp/items/crbp1316.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "09",
          "year": "1948"
        },
        "text": {
          "headline": "Cracked Irrigation Pipe",
          "text": "Cracked 18' irrigation pipe on Pasco Pump Laterals PP-6.0-0.5-1.3 Station 86+74.5-87+01.5 looking upstream. Pipe burst due to internal pressure when testing pipeline. Pipe laid in October, 1946. Tested October, 1948. A.F. Swanson, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1325_sm.jpg",
          "alt": "Dairy herd at Bureau's Moses Lake Development Farm. Herd is owned by Kenneth Hampton who holds lease for operating farm. In right, distance is field corn",
          "caption": "Dairy Farm",
          "link": "/digital/crbp/items/crbp1325.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "01",
          "year": "1948"
        },
        "text": {
          "headline": "Dairy Farm",
          "text": "Dairy herd at Bureau's Moses Lake Development Farm. Herd is owned by Kenneth Hampton who holds lease for operating farm. In right, distance is field corn"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp897_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Picture of diseased potato plant in potato field on Moses Lake Development Farm 2 miles east of Moses Lake. The disease is commonly referred to as Leaf Roll. The rolling of the leaves is often accompanied by a purple coloring of the stems, veins of the leaves, and the edges of the small terminal leaves. Under certain conditions this disease may spread very rapidly. No satisfactory control measures have been found. Potatoes in this field were planted June 27th. H. Foss, cameraman. Taken for Land Development Section",
          "caption": "Diseased Potato Plant In Potato Field",
          "link": "/digital/crbp/items/crbp897.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "17",
          "year": "1947"
        },
        "text": {
          "headline": "Diseased Potato Plant In Potato Field",
          "text": "Columbia Basin Project, Irrigation Division. Picture of diseased potato plant in potato field on Moses Lake Development Farm 2 miles east of Moses Lake. The disease is commonly referred to as Leaf Roll. The rolling of the leaves is often accompanied by a purple coloring of the stems, veins of the leaves, and the edges of the small terminal leaves. Under certain conditions this disease may spread very rapidly. No satisfactory control measures have been found. Potatoes in this field were planted June 27th. H. Foss, cameraman. Taken for Land Development Section"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1322_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Robert McNulty, Unit 1, whose farm is first on the lateral distribution system, works on a ditch around his fields. Much of his acreage is irrigated by a wooden flume, part of which may be seen at upper left. H. Foss, photographer",
          "caption": "Farmer Works A Ditch Around His Field",
          "link": "/digital/crbp/items/crbp1322.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Farmer Works A Ditch Around His Field",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Robert McNulty, Unit 1, whose farm is first on the lateral distribution system, works on a ditch around his fields. Much of his acreage is irrigated by a wooden flume, part of which may be seen at upper left. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1318_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. At the M.E. Chefley farm, Unit 65, Mr. Chefley's father-in-law and son are helping to install 1200 feet of irrigation pipe. Here they have just completed pouring concrete for the turnout.",
          "caption": "Farmers Help To Install Irrigation Pipes",
          "link": "/digital/crbp/items/crbp1318.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Farmers Help To Install Irrigation Pipes",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. At the M.E. Chefley farm, Unit 65, Mr. Chefley's father-in-law and son are helping to install 1200 feet of irrigation pipe. Here they have just completed pouring concrete for the turnout."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1306_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Block 1, Pasco Pump Unit, Specs. 1230. Head of main lateral, at outlet of discharge pipe from Columbia River pumping plant, showing 8 ft. Parshall flume as measuring device. Discharge is approximately 55 o.f.s. H. E. Foss, photographer.",
          "caption": "Head Of Main Lateral",
          "link": "/digital/crbp/items/crbp1306.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Head Of Main Lateral",
          "text": "Columbia Basin Project, Irrigation Division, Block 1, Pasco Pump Unit, Specs. 1230. Head of main lateral, at outlet of discharge pipe from Columbia River pumping plant, showing 8 ft. Parshall flume as measuring device. Discharge is approximately 55 o.f.s. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1310_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Laying irrigation pipe (1200 feet) at the M.E. Chefley farm, unit 35. H. Foss, photographer",
          "caption": "Irrigation Pipes",
          "link": "/digital/crbp/items/crbp1310.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "14",
          "year": "1950"
        },
        "text": {
          "headline": "Irrigation Pipes",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Laying irrigation pipe (1200 feet) at the M.E. Chefley farm, unit 35. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1300_sm.jpg",
          "alt": "View showing equipment and placing of 1 1/2 inch thick pneumatically applied mortar lining on Pasco Pump lateral system PP-6.0-0.5 lateral vicinity sta. 4+00. This section is under construction 10 to 15 miles northwest of Pasco, Wash. By J.A. Tertling and Sons, Inc., specifications 1230,",
          "caption": "Lining Pasco Pump",
          "link": "/digital/crbp/items/crbp1300.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "02",
          "year": "1947"
        },
        "text": {
          "headline": "Lining Pasco Pump",
          "text": "View showing equipment and placing of 1 1/2 inch thick pneumatically applied mortar lining on Pasco Pump lateral system PP-6.0-0.5 lateral vicinity sta. 4+00. This section is under construction 10 to 15 miles northwest of Pasco, Wash. By J.A. Tertling and Sons, Inc., specifications 1230,"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1311_sm.jpg",
          "alt": "Laying 21 inch reinforced concrete pipe (Class A-50' head) on the burbank pump laterals EP 1.1 station 50+50. note placing of wire mesh reinforcement for band. This feature under construction by Mathews Brothers about 7 miles east of Pasco, Washington. Specifications R1-CB-13",
          "caption": "Man Lays 21 Inch Irrigation Pipe",
          "link": "/digital/crbp/items/crbp1311.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "27",
          "year": "1949"
        },
        "text": {
          "headline": "Man Lays 21 Inch Irrigation Pipe",
          "text": "Laying 21 inch reinforced concrete pipe (Class A-50' head) on the burbank pump laterals EP 1.1 station 50+50. note placing of wire mesh reinforcement for band. This feature under construction by Mathews Brothers about 7 miles east of Pasco, Washington. Specifications R1-CB-13"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1317_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, 2nd Section, East Low Canal, Spec. 2603. Laying 24 inch diameter concrete pipe for lateral turnout at Ata. 1105+70. Pipe is laid first, and concrete structure built at later date. This work being done by J.A. Terteling and Sons under Specs. 2603, Schedule 2.",
          "caption": "Men Laying Pipe",
          "link": "/digital/crbp/items/crbp1317.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "11",
          "year": "1950"
        },
        "text": {
          "headline": "Men Laying Pipe",
          "text": "Columbia Basin Project, Irrigation Division, 2nd Section, East Low Canal, Spec. 2603. Laying 24 inch diameter concrete pipe for lateral turnout at Ata. 1105+70. Pipe is laid first, and concrete structure built at later date. This work being done by J.A. Terteling and Sons under Specs. 2603, Schedule 2."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1320_sm.jpg",
          "alt": "Three 200 h.p. pumps being cleaned and readied for installation in the Burbank Pump Plants. The three pumps will deliver 40 c.f.s. to the Burbank Integral through a 36' discharge line with a lift of 100 feet. This feature under construction by Pfieffer and Hohner about 7 miles east of Pasco, Washington. Specifications R1-CB-16. H.E. Foss, photographer",
          "caption": "Men Prepare Pumps For Installation",
          "link": "/digital/crbp/items/crbp1320.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "20",
          "year": "1949"
        },
        "text": {
          "headline": "Men Prepare Pumps For Installation",
          "text": "Three 200 h.p. pumps being cleaned and readied for installation in the Burbank Pump Plants. The three pumps will deliver 40 c.f.s. to the Burbank Integral through a 36' discharge line with a lift of 100 feet. This feature under construction by Pfieffer and Hohner about 7 miles east of Pasco, Washington. Specifications R1-CB-16. H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1297_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. Predevelopment Farm No. 1; located approx. 2 miles east of Moses Lake, Wash. Crew of Agricultural engineers taking topography in view of land leveling and laying out of irrigation distribution system. Farm covers 80 acres. Water supply well may be seen in distance, and the town of Wheeler may be seen in extreme left background. Men in picture are, left; M.W. Hoisveen, USBR Agriculture Eng.; center, B.W. Doran, USBR Agriculture Eng.; right, H.A. Sandwick, USBR Agriculture Eng. Photo taken for J.L. Toevs, chief of land development.",
          "caption": "Men Survey A Farm Outside Of Wheeler",
          "link": "/digital/crbp/items/crbp1297.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "10",
          "year": "1946"
        },
        "text": {
          "headline": "Men Survey A Farm Outside Of Wheeler",
          "text": "Columbia Basin Project, Irrigation Division. Predevelopment Farm No. 1; located approx. 2 miles east of Moses Lake, Wash. Crew of Agricultural engineers taking topography in view of land leveling and laying out of irrigation distribution system. Farm covers 80 acres. Water supply well may be seen in distance, and the town of Wheeler may be seen in extreme left background. Men in picture are, left; M.W. Hoisveen, USBR Agriculture Eng.; center, B.W. Doran, USBR Agriculture Eng.; right, H.A. Sandwick, USBR Agriculture Eng. Photo taken for J.L. Toevs, chief of land development."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1299_sm.jpg",
          "alt": "View showing motor grader excavating and rough trimming for asphaltic lining on Pasco Pump Lateral System at PP-7.7 Sta. 13 (2c section). This feature under construction by J.A. Tertling and Sons, Inc., 12 to 15 miles northwest of Pasco, Washington, Specifications 1230.",
          "caption": "Motor Grader Excavating",
          "link": "/digital/crbp/items/crbp1299.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1947"
        },
        "text": {
          "headline": "Motor Grader Excavating",
          "text": "View showing motor grader excavating and rough trimming for asphaltic lining on Pasco Pump Lateral System at PP-7.7 Sta. 13 (2c section). This feature under construction by J.A. Tertling and Sons, Inc., 12 to 15 miles northwest of Pasco, Washington, Specifications 1230."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1324_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division. The operator of the Winchester development farm is shown moving a 4 inch wheel move sprinkler lateral through the use of a ratchet. The lateral is 720 feet in length and can be moved 60 feet in approximately 5 minutes. The wheels are spaced at 40 foot intervals. H.E. Foss, photographer.",
          "caption": "Moving The Sprinkler System",
          "link": "/digital/crbp/items/crbp1324.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "17",
          "year": "1950"
        },
        "text": {
          "headline": "Moving The Sprinkler System",
          "text": "Columbia Basin Project, Irrigation Division. The operator of the Winchester development farm is shown moving a 4 inch wheel move sprinkler lateral through the use of a ratchet. The lateral is 720 feet in length and can be moved 60 feet in approximately 5 minutes. The wheels are spaced at 40 foot intervals. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1337_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Plowing scene on Unit 47, with an excellent stand of alfalfa in the background. Ken Marvin is doing the plowing, rents the farm from owner. H. Foss, photographer",
          "caption": "Plowing",
          "link": "/digital/crbp/items/crbp1337.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Plowing",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Plowing scene on Unit 47, with an excellent stand of alfalfa in the background. Ken Marvin is doing the plowing, rents the farm from owner. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp903_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Ken Marvin, Unit 47, plows under a field of rye for green manure. The rye was planted last fall as a nurse crop only, and surprised him by growing beyond all expectations",
          "caption": "Plowing Rye",
          "link": "/digital/crbp/items/crbp903.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Plowing Rye",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Ken Marvin, Unit 47, plows under a field of rye for green manure. The rye was planted last fall as a nurse crop only, and surprised him by growing beyond all expectations"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1307_sm.jpg",
          "alt": "Main Lateral, Pasco Unit, showing agricultural development one year after the area began receiving water. Compare this photograph with a pre-irrigation picture taken from the same point. See photo 15429-3",
          "caption": "Results Of Irrigation",
          "link": "/digital/crbp/items/crbp1307.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "24",
          "year": "1949"
        },
        "text": {
          "headline": "Results Of Irrigation",
          "text": "Main Lateral, Pasco Unit, showing agricultural development one year after the area began receiving water. Compare this photograph with a pre-irrigation picture taken from the same point. See photo 15429-3"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1321_sm.jpg",
          "alt": "Setting one of three 16-inch gate valves on pump discharge pipes in the Burbank Pump Plant. This feature under construction about 7 miles east of Pascoe, Washington by Pfieffer and Hohner. Specifications R1-CB-16 H.E. Foss, photographer",
          "caption": "Setting Gate Valves On Pump",
          "link": "/digital/crbp/items/crbp1321.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "20",
          "year": "1949"
        },
        "text": {
          "headline": "Setting Gate Valves On Pump",
          "text": "Setting one of three 16-inch gate valves on pump discharge pipes in the Burbank Pump Plant. This feature under construction about 7 miles east of Pascoe, Washington by Pfieffer and Hohner. Specifications R1-CB-16 H.E. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1339_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Sowing oats on the Keith Cunningham farm, Unit 37. Looking south, highway in the distance. H. Foss, photographer",
          "caption": "Sowing Oats",
          "link": "/digital/crbp/items/crbp1339.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Sowing Oats",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Settlers. Sowing oats on the Keith Cunningham farm, Unit 37. Looking south, highway in the distance. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1319_sm.jpg",
          "alt": "PP-8.0 relift pump of 3H.P. used to deliver 3 cu. Ft./sec. to two farm units. Temporary electrical equipment installed on pole structure for 1948 irrigation season. Portable sheet metal house behind house will be set over installation for protection against weather. A.F. Swanson, cameraman",
          "caption": "Temporary Electrical Equipment",
          "link": "/digital/crbp/items/crbp1319.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "05",
          "year": "1949"
        },
        "text": {
          "headline": "Temporary Electrical Equipment",
          "text": "PP-8.0 relift pump of 3H.P. used to deliver 3 cu. Ft./sec. to two farm units. Temporary electrical equipment installed on pole structure for 1948 irrigation season. Portable sheet metal house behind house will be set over installation for protection against weather. A.F. Swanson, cameraman"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1298_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. Start of embankment construction on Lateral W-25 station 4+00 to 12+50. Borrow area is on right side of lateral within the R/W. Man in foreground is standing at left toe stake at station 4+00. Primary state highway #7 is in the background. Work is being performed by J.A. Tertling and Sons, Inc. Under Schedule 1 of above Specifications. H.E. Foss, photographer.",
          "caption": "The Beginning Of Embankment Construction",
          "link": "/digital/crbp/items/crbp1298.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "16",
          "year": "1950"
        },
        "text": {
          "headline": "The Beginning Of Embankment Construction",
          "text": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. Start of embankment construction on Lateral W-25 station 4+00 to 12+50. Borrow area is on right side of lateral within the R/W. Man in foreground is standing at left toe stake at station 4+00. Primary state highway #7 is in the background. Work is being performed by J.A. Tertling and Sons, Inc. Under Schedule 1 of above Specifications. H.E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1309_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Pump Plant. View of a typical turnout taken to show amount of turbulence at gat. This turnout is across from Unit 6, on PP. 1.8. H. Foss, photographer",
          "caption": "Turbulence At The Gate Of Pasco Pump",
          "link": "/digital/crbp/items/crbp1309.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Turbulence At The Gate Of Pasco Pump",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Pump Plant. View of a typical turnout taken to show amount of turbulence at gat. This turnout is across from Unit 6, on PP. 1.8. H. Foss, photographer"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1305_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Block 1, Pasco Pump Unit, Specs. 1230. Main lateral below check at mile 3.4 looking northeast. Asphaltic concrete lining, showing transverse cracks that developed following) degree temperature of winter 1948-49, which have been filled with mastic. H. E. Foss, photographer.",
          "caption": "View Of Cracks That Developed In The '48-'49 Winter",
          "link": "/digital/crbp/items/crbp1305.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "View Of Cracks That Developed In The '48-'49 Winter",
          "text": "Columbia Basin Project, Irrigation Division, Block 1, Pasco Pump Unit, Specs. 1230. Main lateral below check at mile 3.4 looking northeast. Asphaltic concrete lining, showing transverse cracks that developed following) degree temperature of winter 1948-49, which have been filled with mastic. H. E. Foss, photographer."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1304_sm.jpg",
          "alt": "View looking downstream showing slip form used in placing 3-inch concrete lining in Pasco Pump Lateral System, PPL Sta. 46+50, 10 to 15 miles northwest of Pasco, Washington, which is under construction by J.A. Terteling and Sons, Inc., Specifications 1230",
          "caption": "View Of Slip Form Used For Lining Pasco Pump",
          "link": "/digital/crbp/items/crbp1304.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "15",
          "year": "1947"
        },
        "text": {
          "headline": "View Of Slip Form Used For Lining Pasco Pump",
          "text": "View looking downstream showing slip form used in placing 3-inch concrete lining in Pasco Pump Lateral System, PPL Sta. 46+50, 10 to 15 miles northwest of Pasco, Washington, which is under construction by J.A. Terteling and Sons, Inc., Specifications 1230"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1323_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, Pasco Units. Showing sprinkler system on wheels, devised by Howard Hales, Unit 60. Hale is shown holding crank to a chain drive mechanism by which he can move the entire 1000 feet of pipe across the field as a single unit.",
          "caption": "Wheeled Sprinkling System",
          "link": "/digital/crbp/items/crbp1323.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1950"
        },
        "text": {
          "headline": "Wheeled Sprinkling System",
          "text": "Columbia Basin Project, Irrigation Division, Pasco Units. Showing sprinkler system on wheels, devised by Howard Hales, Unit 60. Hale is shown holding crank to a chain drive mechanism by which he can move the entire 1000 feet of pipe across the field as a single unit."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1314_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications.",
          "caption": "Workman Installing 42'Pipe [01]",
          "link": "/digital/crbp/items/crbp1314.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "08",
          "year": "1950"
        },
        "text": {
          "headline": "Workman Installing 42'Pipe [01]",
          "text": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1315_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications.",
          "caption": "Workman Installing 42'Pipe [02]",
          "link": "/digital/crbp/items/crbp1315.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "08",
          "year": "1950"
        },
        "text": {
          "headline": "Workman Installing 42'Pipe [02]",
          "text": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1313_sm.jpg",
          "alt": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications.",
          "caption": "Workman Installing 42'Pipe [03]",
          "link": "/digital/crbp/items/crbp1313.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "08",
          "year": "1950"
        },
        "text": {
          "headline": "Workman Installing 42'Pipe [03]",
          "text": "Columbia Basin Project, Irrigation Division, W-3 Laterals, Specs. 2880. W-25 Lateral Station 11+84.50 State Highway #7 crossing. Workman installing 43' Class 'D' pipe. Work is being performed by J.A. Terteling and Sons, Inc. under Schedule 1 of above Specifications."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1027_sm.jpg",
          "alt": "One step in the assembly of rotor of Shasta generators to be used in west power house",
          "caption": "Assembly Of Rotor",
          "link": "/digital/crbp/items/crbp1027.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "21",
          "year": "1942"
        },
        "text": {
          "headline": "Assembly Of Rotor",
          "text": "One step in the assembly of rotor of Shasta generators to be used in west power house"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1038_sm.jpg",
          "alt": "A tight fit. The clearance between the huge 25-foot rotors and the stators of the two 75,000 kilowatt Shasta Dam generators, being installed at Grand Coulee Dam to make additional power available for war industries, is only 5/8 inch. Lowering this 450 ton wheel into place, the operators of the two powerhouse cranes, that jointly supported the load, were guided by workmen, stationed around the rim, who inserted sticks between the stationary and moving parts to measure the clearance and prevent contact. When the unit goes into service next February, the outer rim of this rotor, which is 7 feet high, will spin at 125 miles per hour. Attached to the rim are 52 magnets, weighing 3300 lbs. each.",
          "caption": "Completed Rotor",
          "link": "/digital/crbp/items/crbp1038.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "28",
          "year": "1942"
        },
        "text": {
          "headline": "Completed Rotor",
          "text": "A tight fit. The clearance between the huge 25-foot rotors and the stators of the two 75,000 kilowatt Shasta Dam generators, being installed at Grand Coulee Dam to make additional power available for war industries, is only 5/8 inch. Lowering this 450 ton wheel into place, the operators of the two powerhouse cranes, that jointly supported the load, were guided by workmen, stationed around the rim, who inserted sticks between the stationary and moving parts to measure the clearance and prevent contact. When the unit goes into service next February, the outer rim of this rotor, which is 7 feet high, will spin at 125 miles per hour. Attached to the rim are 52 magnets, weighing 3300 lbs. each."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1020_sm.jpg",
          "alt": "Concrete breaker used to tighten bolts on L-6 scroll case",
          "caption": "Concrete Breaker",
          "link": "/digital/crbp/items/crbp1020.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "26",
          "year": "1943"
        },
        "text": {
          "headline": "Concrete Breaker",
          "text": "Concrete breaker used to tighten bolts on L-6 scroll case"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1015_sm.jpg",
          "alt": "The 190-ton scroll case for 103,000 horsepower Allis-Chalmers hydro turbine unit being installed in the west powerhouse at Grand Coulee Dam. This unit consists of several radial and on straight section of welded plate steel riveted with double butt straps. One half of combined unit is lifted by an overhead crane and moved into position. Before being poured in concrete, the scroll case is given hydraulic test of 310 pounds to the square inch.  This scroll case, designed for use at Shasta Dam in northern California, is temporarily installed at Grand Coulee Dam by order of the War Production Board, as construction at Shasta Dam had not progressed sufficiently to make immediate use of turbine at that point. With the waters of the mighty Columbia River as a driving force, this turbine now installed is spinning a giant generator at a rate of 138.5 revolutions per minute, producing more than 75,000 kilowatts of electrical energy.",
          "caption": "Installation Of Scroll Case",
          "link": "/digital/crbp/items/crbp1015.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "11",
          "year": "1942"
        },
        "text": {
          "headline": "Installation Of Scroll Case",
          "text": "The 190-ton scroll case for 103,000 horsepower Allis-Chalmers hydro turbine unit being installed in the west powerhouse at Grand Coulee Dam. This unit consists of several radial and on straight section of welded plate steel riveted with double butt straps. One half of combined unit is lifted by an overhead crane and moved into position. Before being poured in concrete, the scroll case is given hydraulic test of 310 pounds to the square inch.  This scroll case, designed for use at Shasta Dam in northern California, is temporarily installed at Grand Coulee Dam by order of the War Production Board, as construction at Shasta Dam had not progressed sufficiently to make immediate use of turbine at that point. With the waters of the mighty Columbia River as a driving force, this turbine now installed is spinning a giant generator at a rate of 138.5 revolutions per minute, producing more than 75,000 kilowatts of electrical energy."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1013_sm.jpg",
          "alt": "A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground",
          "caption": "Interior Of Powerhouse",
          "link": "/digital/crbp/items/crbp1013.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "28",
          "year": "1942"
        },
        "text": {
          "headline": "Interior Of Powerhouse",
          "text": "A view of the east end of the left powerhouse, with turbine pit No. 6 in the immediate foreground"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1029_sm.jpg",
          "alt": "The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place.",
          "caption": "L-7 Generator Spider",
          "link": "/digital/crbp/items/crbp1029.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "27",
          "year": "1947"
        },
        "text": {
          "headline": "L-7 Generator Spider",
          "text": "The spider for the L-7 generator, after being heated to cause it to expand, is being lowered onto its shaft. It is partially covered with canvas to keep it warm until it is in place."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1076_sm.jpg",
          "alt": "Needle valve being lowered to base in R-8 of East Powerhouse",
          "caption": "Lowering The Needle Valve",
          "link": "/digital/crbp/items/crbp1076.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "24",
          "year": "1944"
        },
        "text": {
          "headline": "Lowering The Needle Valve",
          "text": "Needle valve being lowered to base in R-8 of East Powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1049_sm.jpg",
          "alt": "Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position",
          "caption": "Lowering The Thrust",
          "link": "/digital/crbp/items/crbp1049.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "23",
          "year": "1943"
        },
        "text": {
          "headline": "Lowering The Thrust",
          "text": "Part of the assembly of thrust bearing for generator Shasta L-8 being lowered into position"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1021_sm.jpg",
          "alt": "Col. Basin Proj., Grand Coulee Dam.--Lowering the turbine runner for the No. 1 Shasta Dam generator, of 75,000 kw. Capacity, moved to Grand Coulee Dam with another machine of like size to expedite delivery of new power to Pacific Coast war industries. The wheel is seen as it is entering the well at el. 979. The weight of the runner with its 41 1/2' shaft is about 85 tons.",
          "caption": "Lowering Turbine",
          "link": "/digital/crbp/items/crbp1021.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "15",
          "year": "1942"
        },
        "text": {
          "headline": "Lowering Turbine",
          "text": "Col. Basin Proj., Grand Coulee Dam.--Lowering the turbine runner for the No. 1 Shasta Dam generator, of 75,000 kw. Capacity, moved to Grand Coulee Dam with another machine of like size to expedite delivery of new power to Pacific Coast war industries. The wheel is seen as it is entering the well at el. 979. The weight of the runner with its 41 1/2' shaft is about 85 tons."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1024_sm.jpg",
          "alt": "Men sighting through bolt holes to line them up as 74 ton shaft is lowered into place.",
          "caption": "Lowering A Shaft Into Place [01]",
          "link": "/digital/crbp/items/crbp1024.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "04",
          "year": "1941"
        },
        "text": {
          "headline": "Lowering A Shaft Into Place [01]",
          "text": "Men sighting through bolt holes to line them up as 74 ton shaft is lowered into place."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1023_sm.jpg",
          "alt": "Lower face is shaft to water wheel--upper face is 74 ton shaft connecting to rotor shaft. Shaft above is being lowered into place. The two faces are being carefully cleaned and inspected to insure perfect union. There does not dare be any metal dust or grit. Faces are oiled.",
          "caption": "Lowering A Shaft Into Place [02]",
          "link": "/digital/crbp/items/crbp1023.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "04",
          "year": "1941"
        },
        "text": {
          "headline": "Lowering A Shaft Into Place [02]",
          "text": "Lower face is shaft to water wheel--upper face is 74 ton shaft connecting to rotor shaft. Shaft above is being lowered into place. The two faces are being carefully cleaned and inspected to insure perfect union. There does not dare be any metal dust or grit. Faces are oiled."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1345_sm.jpg",
          "alt": "Wicket gates for L-8 turbine resting on generator deck. Mr. H.R. Ramm, U.S.B.R. cleaning and inspecting shafts",
          "caption": "Man Wipes Wicket Gates [01]",
          "link": "/digital/crbp/items/crbp1345.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1947"
        },
        "text": {
          "headline": "Man Wipes Wicket Gates [01]",
          "text": "Wicket gates for L-8 turbine resting on generator deck. Mr. H.R. Ramm, U.S.B.R. cleaning and inspecting shafts"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1037_sm.jpg",
          "alt": "Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman.",
          "caption": "Man Wipes Wicket Gates [02]",
          "link": "/digital/crbp/items/crbp1037.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "28",
          "year": "1947"
        },
        "text": {
          "headline": "Man Wipes Wicket Gates [02]",
          "text": "Huge wicket gates stored on generator deck is wiped off by H.R. Ramm, U.S.B.R. foreman."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1022_sm.jpg",
          "alt": "Bolts and nuts weighing 193 pounds, couple the sections of the shafts for the two 75,000 kilowatt Shasta generators being installed in the Grand Coulee Dam left powerhouse. The bolts are five inches in diameter and 25 inches long. Each section of the two part shaft is provided with a flange, in which 16 holes have been bored. The bolts will be inserted in these openings, and the nuts, weighing 37 pounds each, attached. To tighten these, a huge steel wrench, three feet long, turned by the blows from a heavy sledge hammer, will be used. Before being seated, the bolts will be cooled to 80 below zero, and shrunk, in a compartment filled with dry ice. While in their contracted form, they will be inserted in the openings in the flanges of the shaft. When their temperature again rises and matches that of the surrounding atmosphere, the fit will be as near perfect as engineers are able to make it.",
          "caption": "Men Carry Bolts",
          "link": "/digital/crbp/items/crbp1022.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "29",
          "year": "1942"
        },
        "text": {
          "headline": "Men Carry Bolts",
          "text": "Bolts and nuts weighing 193 pounds, couple the sections of the shafts for the two 75,000 kilowatt Shasta generators being installed in the Grand Coulee Dam left powerhouse. The bolts are five inches in diameter and 25 inches long. Each section of the two part shaft is provided with a flange, in which 16 holes have been bored. The bolts will be inserted in these openings, and the nuts, weighing 37 pounds each, attached. To tighten these, a huge steel wrench, three feet long, turned by the blows from a heavy sledge hammer, will be used. Before being seated, the bolts will be cooled to 80 below zero, and shrunk, in a compartment filled with dry ice. While in their contracted form, they will be inserted in the openings in the flanges of the shaft. When their temperature again rises and matches that of the surrounding atmosphere, the fit will be as near perfect as engineers are able to make it."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1077_sm.jpg",
          "alt": "An 84-inch needle valve being placed on erection base in bay R-5 of the right powerhouse at Grand Coulee Dam. Eight of these needle valves, transferred from Boulder Dam, are being temporarily installed in the turbine pits by use of steel reducers (elbows) joining the valve with the 18-foot in diameter penstock tubes. A portion of the stream flow of the Columbia River is to be passed through those needle valves during the low water season. The flow through the needle valves, in addition to that portion of the river flow passing through the turbines in the left powerhouse will make unnecessary the use of the spillway. This program of diversion will provide a minimum of turbulence in the water at the foot of the spillway section, facilitating future repair work to the concrete bucket or trough at the base of the spillway. At some future date, the needle valves will be replaced by 150,000 horsepower hydro-turbines, designed to propel 108,000 kilowatt hydroelectric generators.",
          "caption": "Needle Valve On Base",
          "link": "/digital/crbp/items/crbp1077.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "24",
          "year": "1944"
        },
        "text": {
          "headline": "Needle Valve On Base",
          "text": "An 84-inch needle valve being placed on erection base in bay R-5 of the right powerhouse at Grand Coulee Dam. Eight of these needle valves, transferred from Boulder Dam, are being temporarily installed in the turbine pits by use of steel reducers (elbows) joining the valve with the 18-foot in diameter penstock tubes. A portion of the stream flow of the Columbia River is to be passed through those needle valves during the low water season. The flow through the needle valves, in addition to that portion of the river flow passing through the turbines in the left powerhouse will make unnecessary the use of the spillway. This program of diversion will provide a minimum of turbulence in the water at the foot of the spillway section, facilitating future repair work to the concrete bucket or trough at the base of the spillway. At some future date, the needle valves will be replaced by 150,000 horsepower hydro-turbines, designed to propel 108,000 kilowatt hydroelectric generators."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1036_sm.jpg",
          "alt": "41 degree, cast steel elbow, installed between penstock reducer section and needle valve in bay R-9 of the right powerhouse at Grand Coulee Dam. Eight needle valves, each having an 84-inch discharge, are being installed in the right powerhouse. The portion of the Columbia River stream flow not used through the turbines in the left powerhouse, is to be passed through the needle valves installed in the right powerhouse during the low water season. This plan will eliminate the use of the spillway during certain months of the year, assuring a minimum of turbulence in the water downstream from the dam, to facilitate necessary repairs to the concrete spillway bucket.",
          "caption": "Needle Valve, Elbow, And Reducer In Place",
          "link": "/digital/crbp/items/crbp1036.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "02",
          "year": "1945"
        },
        "text": {
          "headline": "Needle Valve, Elbow, And Reducer In Place",
          "text": "41 degree, cast steel elbow, installed between penstock reducer section and needle valve in bay R-9 of the right powerhouse at Grand Coulee Dam. Eight needle valves, each having an 84-inch discharge, are being installed in the right powerhouse. The portion of the Columbia River stream flow not used through the turbines in the left powerhouse, is to be passed through the needle valves installed in the right powerhouse during the low water season. This plan will eliminate the use of the spillway during certain months of the year, assuring a minimum of turbulence in the water downstream from the dam, to facilitate necessary repairs to the concrete spillway bucket."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1014_sm.jpg",
          "alt": "Placing scroll case section L1 W. powerhouse",
          "caption": "Placing Scroll Case",
          "link": "/digital/crbp/items/crbp1014.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "Placing Scroll Case",
          "text": "Placing scroll case section L1 W. powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1017_sm.jpg",
          "alt": "Placing the last section of the scroll case for L-7 turbine.",
          "caption": "Placing The Last Section Of The Scroll Case",
          "link": "/digital/crbp/items/crbp1017.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "10",
          "year": "1947"
        },
        "text": {
          "headline": "Placing The Last Section Of The Scroll Case",
          "text": "Placing the last section of the scroll case for L-7 turbine."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1075_sm.jpg",
          "alt": "Riveting together the sections of the #1 Shasta turbine scroll case in pit 7. On the left is the heater. In the center, a man is bouncing a heated rivet to knock off the oxidized scale and on the right are the riveters waiting for the rivet.",
          "caption": "Riveting Crew At Work",
          "link": "/digital/crbp/items/crbp1075.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "23",
          "year": "1942"
        },
        "text": {
          "headline": "Riveting Crew At Work",
          "text": "Riveting together the sections of the #1 Shasta turbine scroll case in pit 7. On the left is the heater. In the center, a man is bouncing a heated rivet to knock off the oxidized scale and on the right are the riveters waiting for the rivet."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1030_sm.jpg",
          "alt": "Col. Basin Proj., Grand Coulee Dam.--Rotor for main generator unit L-6 in the west powerhouse at Grand Coulee Dam being carried to final position by two overhead travelling cranes using an equalizing beam. The rotor, 31 feet in diameter, weighing 535 tons, rotates at a speed of 120 revolutions per minute within stator, and develops 106,000 kilowatts of electrical energy.",
          "caption": "Rotor Being Installed [01]",
          "link": "/digital/crbp/items/crbp1030.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "08",
          "year": "1943"
        },
        "text": {
          "headline": "Rotor Being Installed [01]",
          "text": "Col. Basin Proj., Grand Coulee Dam.--Rotor for main generator unit L-6 in the west powerhouse at Grand Coulee Dam being carried to final position by two overhead travelling cranes using an equalizing beam. The rotor, 31 feet in diameter, weighing 535 tons, rotates at a speed of 120 revolutions per minute within stator, and develops 106,000 kilowatts of electrical energy."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1031_sm.jpg",
          "alt": "Lowering the L-7 rotor into place",
          "caption": "Rotor Being Installed [02]",
          "link": "/digital/crbp/items/crbp1031.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "02",
          "year": "1942"
        },
        "text": {
          "headline": "Rotor Being Installed [02]",
          "text": "Lowering the L-7 rotor into place"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1035_sm.jpg",
          "alt": "Man stands on the rotor--which nears completion",
          "caption": "Rotor Near Completion",
          "link": "/digital/crbp/items/crbp1035.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "05",
          "year": "1941"
        },
        "text": {
          "headline": "Rotor Near Completion",
          "text": "Man stands on the rotor--which nears completion"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1064_sm.jpg",
          "alt": "Men appear to be playing a game while on break.",
          "caption": "School For Rivitors [01]",
          "link": "/digital/crbp/items/crbp1064.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "School For Rivitors [01]",
          "text": "Men appear to be playing a game while on break."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1072_sm.jpg",
          "alt": "Three workers at smelter",
          "caption": "School For Rivitors [02]",
          "link": "/digital/crbp/items/crbp1072.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "School For Rivitors [02]",
          "text": "Three workers at smelter"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1016_sm.jpg",
          "alt": "View of pit 6 showing scroll case in place. Photo taken from crane",
          "caption": "Scroll Case In Place",
          "link": "/digital/crbp/items/crbp1016.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "15",
          "year": "1943"
        },
        "text": {
          "headline": "Scroll Case In Place",
          "text": "View of pit 6 showing scroll case in place. Photo taken from crane"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1026_sm.jpg",
          "alt": "Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor",
          "caption": "Shaft For Shasta Generator Being Lifted",
          "link": "/digital/crbp/items/crbp1026.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "15",
          "year": "1942"
        },
        "text": {
          "headline": "Shaft For Shasta Generator Being Lifted",
          "text": "Shaft for Shasta generator being lifted preparatory to seating upright in operating position for construction of rotor"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1025_sm.jpg",
          "alt": "Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly, between main units L-2 and L-3.",
          "caption": "Stator Being Moved Into Place",
          "link": "/digital/crbp/items/crbp1025.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1943"
        },
        "text": {
          "headline": "Stator Being Moved Into Place",
          "text": "Stator and bracket assembly for main unit L-6, weighing 335 tons, being lifted into its permanent position in bay 6. Two travelling cranes, with a lifting capacity of 375 tons each, are shown carrying the unit from its temporary point of assembly, between main units L-2 and L-3."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1019_sm.jpg",
          "alt": "Workman using a micrometer on L-6 scroll case bolts after tightening.",
          "caption": "Worker Using Micrometer",
          "link": "/digital/crbp/items/crbp1019.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "26",
          "year": "1943"
        },
        "text": {
          "headline": "Worker Using Micrometer",
          "text": "Workman using a micrometer on L-6 scroll case bolts after tightening."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1018_sm.jpg",
          "alt": "Bureau workmen Stretching bolts on scroll case in east powerhouse at Grand Coulee Dam, Left to right; Walt Scott and Robert Bush",
          "caption": "Workers Install Scrollcase",
          "link": "/digital/crbp/items/crbp1018.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "09",
          "year": "1950"
        },
        "text": {
          "headline": "Workers Install Scrollcase",
          "text": "Bureau workmen Stretching bolts on scroll case in east powerhouse at Grand Coulee Dam, Left to right; Walt Scott and Robert Bush"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1140_sm.jpg",
          "alt": "Terrazzo machine man applying linseed oil and turpentine to floor and base of Unit L-1, elevation 991, West Powerhouse. This oil is floated for at least six hours before being removed.",
          "caption": "Applying Oil",
          "link": "/digital/crbp/items/crbp1140.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "25",
          "year": "1949"
        },
        "text": {
          "headline": "Applying Oil",
          "text": "Terrazzo machine man applying linseed oil and turpentine to floor and base of Unit L-1, elevation 991, West Powerhouse. This oil is floated for at least six hours before being removed."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1127_sm.jpg",
          "alt": "Men working inside powerhouse",
          "caption": "Concrete Placement In Powerhouse",
          "link": "/digital/crbp/items/crbp1127.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "20",
          "year": "1939"
        },
        "text": {
          "headline": "Concrete Placement In Powerhouse",
          "text": "Men working inside powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1126_sm.jpg",
          "alt": "Progress view of the stage of construction on the R-1 scroll case.",
          "caption": "Construction Of The R-1 Scroll Case",
          "link": "/digital/crbp/items/crbp1126.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "17",
          "year": "1948"
        },
        "text": {
          "headline": "Construction Of The R-1 Scroll Case",
          "text": "Progress view of the stage of construction on the R-1 scroll case."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1131_sm.jpg",
          "alt": "View of the east powerhouse foundation with Grand Coulee in the background.",
          "caption": "East Powerhouse Foundation [01]",
          "link": "/digital/crbp/items/crbp1131.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "25",
          "year": "1941"
        },
        "text": {
          "headline": "East Powerhouse Foundation [01]",
          "text": "View of the east powerhouse foundation with Grand Coulee in the background."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1134_sm.jpg",
          "alt": "Progress photos of the East Powerhouse as of date.",
          "caption": "East Powerhouse Foundation [02]",
          "link": "/digital/crbp/items/crbp1134.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "07",
          "year": "1941"
        },
        "text": {
          "headline": "East Powerhouse Foundation [02]",
          "text": "Progress photos of the East Powerhouse as of date."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1133_sm.jpg",
          "alt": "Feeder Canal. Specs. 2586. J.A. Terteling and Sons Inc., Contractors. This photograph was taken on the extreme west end of the Electric City Storage Yard. The sub-contractor, the Steel Construction Co., who have the contract with J.A. Terteling and Sons for furnishing and installing reinforcing steel is fabricating concrete support blocks for the reinforcing steel. In the left center of this photo are forms for 6' blocks and right center are forms for 2 3/4' blocks. The contractor will fill these forms with a mix of 2 1/2 of sand to 1 cement, then, after this has partially set, the blocks are cut up into desired sizes.",
          "caption": "Installing Reinforcing Steel",
          "link": "/digital/crbp/items/crbp1133.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "16",
          "year": "1949"
        },
        "text": {
          "headline": "Installing Reinforcing Steel",
          "text": "Feeder Canal. Specs. 2586. J.A. Terteling and Sons Inc., Contractors. This photograph was taken on the extreme west end of the Electric City Storage Yard. The sub-contractor, the Steel Construction Co., who have the contract with J.A. Terteling and Sons for furnishing and installing reinforcing steel is fabricating concrete support blocks for the reinforcing steel. In the left center of this photo are forms for 6' blocks and right center are forms for 2 3/4' blocks. The contractor will fill these forms with a mix of 2 1/2 of sand to 1 cement, then, after this has partially set, the blocks are cut up into desired sizes."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1138_sm.jpg",
          "alt": "Residency No. 3, Specifications 2329, Unit R-3, Second Stage Concrete, Barrel Pour No. 9 to Elevation 977.0 and Pour No. 10 Elevation 978.87 Slab, Right Powerhouse. June 17, 1949. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. View looking down on Elevation 977.0, Barrel pour No. 9 completed to elevation 977.0 and carpenters laying plywood for ceiling of pour No. 10, Elevation 978.87 Slab. Work performed after the carpenters returned to work June 13, 1949.",
          "caption": "Laying Plywood For Pour In West Powerhouse",
          "link": "/digital/crbp/items/crbp1138.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "17",
          "year": "1949"
        },
        "text": {
          "headline": "Laying Plywood For Pour In West Powerhouse",
          "text": "Residency No. 3, Specifications 2329, Unit R-3, Second Stage Concrete, Barrel Pour No. 9 to Elevation 977.0 and Pour No. 10 Elevation 978.87 Slab, Right Powerhouse. June 17, 1949. Contractor: Morrison-Knudsen Company, Inc. and Peter Kiewit Sons' Company. View looking down on Elevation 977.0, Barrel pour No. 9 completed to elevation 977.0 and carpenters laying plywood for ceiling of pour No. 10, Elevation 978.87 Slab. Work performed after the carpenters returned to work June 13, 1949."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1165_sm.jpg",
          "alt": "Lowering tube for placement in outlet works at elevation 1137.",
          "caption": "Lowering Tube",
          "link": "/digital/crbp/items/crbp1165.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "02",
          "year": "1940"
        },
        "text": {
          "headline": "Lowering Tube",
          "text": "Lowering tube for placement in outlet works at elevation 1137."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1166_sm.jpg",
          "alt": "Outlet tube gate construction",
          "caption": "Outlet Tube Gate",
          "link": "/digital/crbp/items/crbp1166.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "29",
          "year": "1940"
        },
        "text": {
          "headline": "Outlet Tube Gate",
          "text": "Outlet tube gate construction"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1168_sm.jpg",
          "alt": "East side of Penstock liner. Man inside liner gives scale.",
          "caption": "Penstock Liner",
          "link": "/digital/crbp/items/crbp1168.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "10",
          "year": "1940"
        },
        "text": {
          "headline": "Penstock Liner",
          "text": "East side of Penstock liner. Man inside liner gives scale."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1137_sm.jpg",
          "alt": "Looking up from pit #7 in West Powerhouse--natural illumination",
          "caption": "Pit #7 In West Powerhouse",
          "link": "/digital/crbp/items/crbp1137.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "14",
          "year": "1941"
        },
        "text": {
          "headline": "Pit #7 In West Powerhouse",
          "text": "Looking up from pit #7 in West Powerhouse--natural illumination"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1132_sm.jpg",
          "alt": "View of East Powerhouse and transformer deck with outlet tubes in background.",
          "caption": "Powerhouse And Transformer Deck",
          "link": "/digital/crbp/items/crbp1132.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1942"
        },
        "text": {
          "headline": "Powerhouse And Transformer Deck",
          "text": "View of East Powerhouse and transformer deck with outlet tubes in background."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1125_sm.jpg",
          "alt": "Bays 1-2 and 3 in East Powerhouse.",
          "caption": "Powerhouse Bays",
          "link": "/digital/crbp/items/crbp1125.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "23",
          "year": "1942"
        },
        "text": {
          "headline": "Powerhouse Bays",
          "text": "Bays 1-2 and 3 in East Powerhouse."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1167_sm.jpg",
          "alt": "Close up view of unidentified equipment",
          "caption": "Powerhouse Equipment",
          "link": "/digital/crbp/items/crbp1167.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "09",
          "year": "1940"
        },
        "text": {
          "headline": "Powerhouse Equipment",
          "text": "Close up view of unidentified equipment"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1130_sm.jpg",
          "alt": "General view of reinforcing steel at East Powerhouse base",
          "caption": "Reinforcing Steel In Powerhouse",
          "link": "/digital/crbp/items/crbp1130.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "07",
          "year": "1940"
        },
        "text": {
          "headline": "Reinforcing Steel In Powerhouse",
          "text": "General view of reinforcing steel at East Powerhouse base"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1139_sm.jpg",
          "alt": "The two 14,000 h.p. station-service turbines at the left powerhouse are embedded in concrete to elevation 951, the generator floor level.",
          "caption": "Station Service From Balcony",
          "link": "/digital/crbp/items/crbp1139.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "01",
          "year": "1940"
        },
        "text": {
          "headline": "Station Service From Balcony",
          "text": "The two 14,000 h.p. station-service turbines at the left powerhouse are embedded in concrete to elevation 951, the generator floor level."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1135_sm.jpg",
          "alt": "Transformer deck at East Powerhouse",
          "caption": "Transformer Deck",
          "link": "/digital/crbp/items/crbp1135.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "29",
          "year": "1941"
        },
        "text": {
          "headline": "Transformer Deck",
          "text": "Transformer deck at East Powerhouse"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1136_sm.jpg",
          "alt": "West Powerhouse from Car Skip",
          "caption": "West Powerhouse",
          "link": "/digital/crbp/items/crbp1136.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "10",
          "year": "1940"
        },
        "text": {
          "headline": "West Powerhouse",
          "text": "West Powerhouse from Car Skip"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1129_sm.jpg",
          "alt": "Wheelpit R-8 looking downstream from 965 step. East Powerhouse base.",
          "caption": "Wheelpit R-8",
          "link": "/digital/crbp/items/crbp1129.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "25",
          "year": "1940"
        },
        "text": {
          "headline": "Wheelpit R-8",
          "text": "Wheelpit R-8 looking downstream from 965 step. East Powerhouse base."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp951_sm.jpg",
          "alt": "Specification No. 2475, March 24, 1949. When this photograph was taken the floating caisson was anchored by its 'A' frame to the spillway bucket section. The caisson barge with machinery for operating the caisson is between the towers. At the left are rafts carrying power line to the caisson barge. In the background are floats carrying maneuvering lines, a sea mule, and a dredging barge. This operation is being performed by Pacific Bridge Company, contractors, as part of their contract to repair the spillway bucket section of Grand Coulee Dam.",
          "caption": "Anchored Caisson",
          "link": "/digital/crbp/items/crbp951.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "24",
          "year": "1949"
        },
        "text": {
          "headline": "Anchored Caisson",
          "text": "Specification No. 2475, March 24, 1949. When this photograph was taken the floating caisson was anchored by its 'A' frame to the spillway bucket section. The caisson barge with machinery for operating the caisson is between the towers. At the left are rafts carrying power line to the caisson barge. In the background are floats carrying maneuvering lines, a sea mule, and a dredging barge. This operation is being performed by Pacific Bridge Company, contractors, as part of their contract to repair the spillway bucket section of Grand Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp942_sm.jpg",
          "alt": "Showing granite armor rock along the left riverbank below Grand Coulee Dam ready for placing in section 'A.' The rock is obtained from the upriver quarry. This work is performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636",
          "caption": "Armor Rock Along The Bank [01]",
          "link": "/digital/crbp/items/crbp942.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Armor Rock Along The Bank [01]",
          "text": "Showing granite armor rock along the left riverbank below Grand Coulee Dam ready for placing in section 'A.' The rock is obtained from the upriver quarry. This work is performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp944_sm.jpg",
          "alt": "Showing general area of section 'A' for placement of granite armor rock along the left bank of the Columbia River below Grand Coulee Dam. The section extends from the crane upstream to a point opposite the large concrete blocks, showing on the riprap slope a little to the right of the center of the picture and just above the debris. These concrete blocks are from the excavation of the Shasta generating units and withstood the flood waters of 1948. This work is performed by J.A.Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636",
          "caption": "Armor Rock Along The Riverbank [02]",
          "link": "/digital/crbp/items/crbp944.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Armor Rock Along The Riverbank [02]",
          "text": "Showing general area of section 'A' for placement of granite armor rock along the left bank of the Columbia River below Grand Coulee Dam. The section extends from the crane upstream to a point opposite the large concrete blocks, showing on the riprap slope a little to the right of the center of the picture and just above the debris. These concrete blocks are from the excavation of the Shasta generating units and withstood the flood waters of 1948. This work is performed by J.A.Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp946_sm.jpg",
          "alt": "Photograph of the cross-river ferry taken from the left side ramp. Detail of the 4-drum hoist and the cables required to maneuver the ferry may be noted. This ferry is being used to carry some 350,000 tons of riprap and armor rock from the Bull Canyon quarry to the right riverbank for slope protection. Grand Coulee Dam, River Channel Improvements, Specifications 2808, Contract Ir-18762, Morrison-Knudsen Company, Inc., Contractor.",
          "caption": "Ferry Used To Transport Riprap And Armor Rock",
          "link": "/digital/crbp/items/crbp946.html"
        },
        "start_date": { 
          
          "month": "09",
          "day": "12",
          "year": "1950"
        },
        "text": {
          "headline": "Ferry Used To Transport Riprap And Armor Rock",
          "text": "Photograph of the cross-river ferry taken from the left side ramp. Detail of the 4-drum hoist and the cables required to maneuver the ferry may be noted. This ferry is being used to carry some 350,000 tons of riprap and armor rock from the Bull Canyon quarry to the right riverbank for slope protection. Grand Coulee Dam, River Channel Improvements, Specifications 2808, Contract Ir-18762, Morrison-Knudsen Company, Inc., Contractor."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp948_sm.jpg",
          "alt": "Floating Caisson aft section passing thru the drydock gates as it moves out into the drydock channel, where it will be moored while the Caisson Seat Frame is being assembled in the drydock. Foreground, Caisson with operating machinery on deck. Left, drydock well end miter gate. Background, tug and steel derrick barge. This work is part of the Pacific Bridge Co. contract, Specs. 2475, Coulee Dam, Washington.",
          "caption": "Floating Caisson Exits Drydock",
          "link": "/digital/crbp/items/crbp948.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "24",
          "year": "1949"
        },
        "text": {
          "headline": "Floating Caisson Exits Drydock",
          "text": "Floating Caisson aft section passing thru the drydock gates as it moves out into the drydock channel, where it will be moored while the Caisson Seat Frame is being assembled in the drydock. Foreground, Caisson with operating machinery on deck. Left, drydock well end miter gate. Background, tug and steel derrick barge. This work is part of the Pacific Bridge Co. contract, Specs. 2475, Coulee Dam, Washington."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp947_sm.jpg",
          "alt": "Specifications No. 2475, March, 23, 1949. This is picture No. 4 of a series of thirteen showing movements of the floating caisson on its initial trial run from the drydock to the spillway bucket. The caisson is at station A29+98.38/B5+97.92 at 12:20 p.m. In the background is the drydock with miter gates open and fender barges in position. This work is being performed by the Pacific Bridge Company, contractors, as part of their contract to repair the spillway bucket of Grand Coulee Dam.",
          "caption": "Initial Run Of The Floating Caisson",
          "link": "/digital/crbp/items/crbp947.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "23",
          "year": "1949"
        },
        "text": {
          "headline": "Initial Run Of The Floating Caisson",
          "text": "Specifications No. 2475, March, 23, 1949. This is picture No. 4 of a series of thirteen showing movements of the floating caisson on its initial trial run from the drydock to the spillway bucket. The caisson is at station A29+98.38/B5+97.92 at 12:20 p.m. In the background is the drydock with miter gates open and fender barges in position. This work is being performed by the Pacific Bridge Company, contractors, as part of their contract to repair the spillway bucket of Grand Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp949_sm.jpg",
          "alt": "Interior of caisson drydock showing rock that is being placed in bottom. Sand will be placed on top of rock and reinforced concrete atop the sand. The four piers form the resting place for the caisson",
          "caption": "Interior Of Caisson Drydock",
          "link": "/digital/crbp/items/crbp949.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "29",
          "year": "1944"
        },
        "text": {
          "headline": "Interior Of Caisson Drydock",
          "text": "Interior of caisson drydock showing rock that is being placed in bottom. Sand will be placed on top of rock and reinforced concrete atop the sand. The four piers form the resting place for the caisson"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp943_sm.jpg",
          "alt": "First placement of granite armor rock at the downriver end of section 'A.' Note the size of the rock in comparison to the man; armor rock weighing over 10 tons has been placed. This rock is obtained from the upriver quarry under work performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456",
          "caption": "Man Stands Next To Armor Rock",
          "link": "/digital/crbp/items/crbp943.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Man Stands Next To Armor Rock",
          "text": "First placement of granite armor rock at the downriver end of section 'A.' Note the size of the rock in comparison to the man; armor rock weighing over 10 tons has been placed. This rock is obtained from the upriver quarry under work performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp939_sm.jpg",
          "alt": "View towards northwest from deflection sheave #5, showing large rocks on riprap with their identifying numbers painted on them. A similar photo taken after 1948 high-waster will show to what extent the large rocks are moved by the high water. See book #143, page #39, for location of rocks.",
          "caption": "Numbered Rocks",
          "link": "/digital/crbp/items/crbp939.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "05",
          "year": "1948"
        },
        "text": {
          "headline": "Numbered Rocks",
          "text": "View towards northwest from deflection sheave #5, showing large rocks on riprap with their identifying numbers painted on them. A similar photo taken after 1948 high-waster will show to what extent the large rocks are moved by the high water. See book #143, page #39, for location of rocks."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp941_sm.jpg",
          "alt": "Placing a granite armor rock weighing well over six tons on the left bank of the Columbia River. The rock is from the upriver quarry. This work is being performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636",
          "caption": "Placing An Armor Rock On The Bank",
          "link": "/digital/crbp/items/crbp941.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Placing An Armor Rock On The Bank",
          "text": "Placing a granite armor rock weighing well over six tons on the left bank of the Columbia River. The rock is from the upriver quarry. This work is being performed by J.A. Terteling and Sons, Inc., under provisions of negotiated contract I2r-18456, Specifications 2636"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp945_sm.jpg",
          "alt": "This view, looking downstream, shows the recently placed riprap along the left bank of the Columbia River with the surge from the stream coming in. See also picture 19286-3 which shows the surge receded.",
          "caption": "Recently Placed Riprap",
          "link": "/digital/crbp/items/crbp945.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "26",
          "year": "1949"
        },
        "text": {
          "headline": "Recently Placed Riprap",
          "text": "This view, looking downstream, shows the recently placed riprap along the left bank of the Columbia River with the surge from the stream coming in. See also picture 19286-3 which shows the surge receded."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp950_sm.jpg",
          "alt": "Specifications No. 2475, March 24, 1949. This photograph was taken as the floating caisson was being submerged in the spillway bucket during its initial trial operation. The caisson barge with operating equipment is shown floating between the caisson towers. In the foreground is the caisson 'A' frame anchored to the spillway face, and in the background are the divers' barge, the work barge, and the personnel skiff. This work is being performed by Pacific Bridge Company, as part of their contract for repair of the spillway of Grand Coulee Dam.",
          "caption": "Submerging The Floating Caisson",
          "link": "/digital/crbp/items/crbp950.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "24",
          "year": "1949"
        },
        "text": {
          "headline": "Submerging The Floating Caisson",
          "text": "Specifications No. 2475, March 24, 1949. This photograph was taken as the floating caisson was being submerged in the spillway bucket during its initial trial operation. The caisson barge with operating equipment is shown floating between the caisson towers. In the foreground is the caisson 'A' frame anchored to the spillway face, and in the background are the divers' barge, the work barge, and the personnel skiff. This work is being performed by Pacific Bridge Company, as part of their contract for repair of the spillway of Grand Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp995_sm.jpg",
          "alt": "Man tests concrete specimens",
          "caption": "Concor' Drill Rig",
          "link": "/digital/crbp/items/crbp995.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "08",
          "year": "1938"
        },
        "text": {
          "headline": "Concor' Drill Rig",
          "text": "Man tests concrete specimens"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1005_sm.jpg",
          "alt": "A close up view of bolts in a concrete wall",
          "caption": "Bolts In Concrete Wall",
          "link": "/digital/crbp/items/crbp1005.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "01",
          "year": "1938"
        },
        "text": {
          "headline": "Bolts In Concrete Wall",
          "text": "A close up view of bolts in a concrete wall"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1003_sm.jpg",
          "alt": "View of concrete drying(?)",
          "caption": "Concrete Drying",
          "link": "/digital/crbp/items/crbp1003.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "04",
          "year": "1938"
        },
        "text": {
          "headline": "Concrete Drying",
          "text": "View of concrete drying(?)"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1009_sm.jpg",
          "alt": "96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8' diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17' x 11' while wedge side dimensions are 17' x 10' x3'",
          "caption": "Concrete In Turbine",
          "link": "/digital/crbp/items/crbp1009.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "20",
          "year": "1944"
        },
        "text": {
          "headline": "Concrete In Turbine",
          "text": "96 pound block of concrete found in unit L-4 turbine runner, 3-20-44. The 7/8' diameter hole in the foreground appears to have been an anchor bolt hole. Rectangular dimensions are 17' x 11' while wedge side dimensions are 17' x 10' x3'"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp989_sm.jpg",
          "alt": "Govt. inspector filling cylinder with concrete sample at a plant for compression braking test",
          "caption": "Concrete Inspection [01]",
          "link": "/digital/crbp/items/crbp989.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "26",
          "year": "1940"
        },
        "text": {
          "headline": "Concrete Inspection [01]",
          "text": "Govt. inspector filling cylinder with concrete sample at a plant for compression braking test"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp988_sm.jpg",
          "alt": "Govt. inspector filling cylinder with concrete sample at a plant for compression braking test",
          "caption": "Concrete Inspection [02]",
          "link": "/digital/crbp/items/crbp988.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "26",
          "year": "1940"
        },
        "text": {
          "headline": "Concrete Inspection [02]",
          "text": "Govt. inspector filling cylinder with concrete sample at a plant for compression braking test"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp990_sm.jpg",
          "alt": "concrete specimens-not yet submerged in water for testing",
          "caption": "Concrete Specimens",
          "link": "/digital/crbp/items/crbp990.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "19",
          "year": "1938"
        },
        "text": {
          "headline": "Concrete Specimens",
          "text": "concrete specimens-not yet submerged in water for testing"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp991_sm.jpg",
          "alt": "View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond prior to being permanently transferred to a second pond because of leakage. Depth of water in picture is about 3 inches. Marks showing normal 3-foot depth can be seen on the posts below the numbers. White areas on posts are alkali deposits. Behind platform are fresh water specimens from the second pond stored on the ground during the interchange of specimens.",
          "caption": "Concrete Specimens Submerged",
          "link": "/digital/crbp/items/crbp991.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "18",
          "year": "1949"
        },
        "text": {
          "headline": "Concrete Specimens Submerged",
          "text": "View of concrete specimens being tested for resistance to sulfate waters in ponds at elevation 1930 southwest of the 230-Kv switchyard at Coulee Dam. View shows cylinders, bars, and posts from test batches 48-72 setting in original alkali pond prior to being permanently transferred to a second pond because of leakage. Depth of water in picture is about 3 inches. Marks showing normal 3-foot depth can be seen on the posts below the numbers. White areas on posts are alkali deposits. Behind platform are fresh water specimens from the second pond stored on the ground during the interchange of specimens."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp994_sm.jpg",
          "alt": "Test of form stripping. Re: stains on concrete",
          "caption": "Concrete Testing",
          "link": "/digital/crbp/items/crbp994.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "02",
          "year": "1940"
        },
        "text": {
          "headline": "Concrete Testing",
          "text": "Test of form stripping. Re: stains on concrete"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp993_sm.jpg",
          "alt": "Testing a concrete specimen--it appears to have failed",
          "caption": "Cylinder Testing [01]",
          "link": "/digital/crbp/items/crbp993.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "07",
          "year": "1940"
        },
        "text": {
          "headline": "Cylinder Testing [01]",
          "text": "Testing a concrete specimen--it appears to have failed"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp992_sm.jpg",
          "alt": "Testing a concrete cylinder",
          "caption": "Cylinder Testing [02]",
          "link": "/digital/crbp/items/crbp992.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "07",
          "year": "1940"
        },
        "text": {
          "headline": "Cylinder Testing [02]",
          "text": "Testing a concrete cylinder"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1002_sm.jpg",
          "alt": "An unidentified man testing electrical.",
          "caption": "Dam Testing",
          "link": "/digital/crbp/items/crbp1002.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "01",
          "year": "1938"
        },
        "text": {
          "headline": "Dam Testing",
          "text": "An unidentified man testing electrical."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp999_sm.jpg",
          "alt": "Drill core sample against white background",
          "caption": "Drill Core Sample",
          "link": "/digital/crbp/items/crbp999.html"
        },
        "start_date": { 
          
          "year": "1938"
        },
        "text": {
          "headline": "Drill Core Sample",
          "text": "Drill core sample against white background"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1006_sm.jpg",
          "alt": "Close up view of a man gauging offsets between concrete units",
          "caption": "Gauging Offsets Between Concrete Units",
          "link": "/digital/crbp/items/crbp1006.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "01",
          "year": "1938"
        },
        "text": {
          "headline": "Gauging Offsets Between Concrete Units",
          "text": "Close up view of a man gauging offsets between concrete units"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1033_sm.jpg",
          "alt": "Scale model of Grand Coulee Dam",
          "caption": "Grand Coulee [01]",
          "link": "/digital/crbp/items/crbp1033.html"
        },
        "start_date": { 
          
          "year": "1938"
        },
        "text": {
          "headline": "Grand Coulee [01]",
          "text": "Scale model of Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1034_sm.jpg",
          "alt": "Scale model of Grand Coulee Dam",
          "caption": "Grand Coulee [02]",
          "link": "/digital/crbp/items/crbp1034.html"
        },
        "start_date": { 
          
          "year": "1938"
        },
        "text": {
          "headline": "Grand Coulee [02]",
          "text": "Scale model of Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp997_sm.jpg",
          "alt": "Sample core of Grant; showing seam",
          "caption": "Grant Seam In Core",
          "link": "/digital/crbp/items/crbp997.html"
        },
        "start_date": { 
          
          "year": "1938"
        },
        "text": {
          "headline": "Grant Seam In Core",
          "text": "Sample core of Grant; showing seam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp987_sm.jpg",
          "alt": "Man works with concrete during construction of Grand Coulee",
          "caption": "Man Works With Concrete",
          "link": "/digital/crbp/items/crbp987.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "26",
          "year": "1940"
        },
        "text": {
          "headline": "Man Works With Concrete",
          "text": "Man works with concrete during construction of Grand Coulee"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1010_sm.jpg",
          "alt": "View of the propeller of the Miss Coulee displayed on a pedestal",
          "caption": "Miss Coulee Propeller",
          "link": "/digital/crbp/items/crbp1010.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "05",
          "year": "1941"
        },
        "text": {
          "headline": "Miss Coulee Propeller",
          "text": "View of the propeller of the Miss Coulee displayed on a pedestal"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1000_sm.jpg",
          "alt": "Multiple grant seams in drill core",
          "caption": "Multiple Grant Seams In Drill Core",
          "link": "/digital/crbp/items/crbp1000.html"
        },
        "start_date": { 
          
          "year": "1941"
        },
        "text": {
          "headline": "Multiple Grant Seams In Drill Core",
          "text": "Multiple grant seams in drill core"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1007_sm.jpg",
          "alt": "Main unit stop-log guide showing offsets between parts 1 and 2 of drawing 222-D-2204 at elevation 1025.8",
          "caption": "Offset Between Parts",
          "link": "/digital/crbp/items/crbp1007.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "31",
          "year": "1939"
        },
        "text": {
          "headline": "Offset Between Parts",
          "text": "Main unit stop-log guide showing offsets between parts 1 and 2 of drawing 222-D-2204 at elevation 1025.8"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1004_sm.jpg",
          "alt": "North Coulee Dam, Piezometer Terminal Well, A view of the piezometer test apparatus at the corner of the upstream and right walls of the well. The pore pressure in the dam embankment and foundation are transmitted through the water-filled tubes and recorded on the Bourdon tube pressure gages at the right. The solenoid operated valve at the top transmits pulsating waves through the system to assist in the removal of air in the tubes. Two TK Westinghouse relays at the bottom are electrically connected in series with the solenoid valve. Any cycle desired for the operation of solenoid valve can be obtained by adjustments of the timing devices in the relays. The air trap at the upper left supplies water and removes air from the system. Specifications 2586, Contract I2r-18481, J.A. Terteling and Sons, Inc., Contractor.",
          "caption": "Piezometer Test Apparatus",
          "link": "/digital/crbp/items/crbp1004.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "24",
          "year": "1950"
        },
        "text": {
          "headline": "Piezometer Test Apparatus",
          "text": "North Coulee Dam, Piezometer Terminal Well, A view of the piezometer test apparatus at the corner of the upstream and right walls of the well. The pore pressure in the dam embankment and foundation are transmitted through the water-filled tubes and recorded on the Bourdon tube pressure gages at the right. The solenoid operated valve at the top transmits pulsating waves through the system to assist in the removal of air in the tubes. Two TK Westinghouse relays at the bottom are electrically connected in series with the solenoid valve. Any cycle desired for the operation of solenoid valve can be obtained by adjustments of the timing devices in the relays. The air trap at the upper left supplies water and removes air from the system. Specifications 2586, Contract I2r-18481, J.A. Terteling and Sons, Inc., Contractor."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp996_sm.jpg",
          "alt": "Sample core of Grant",
          "caption": "Sample Core",
          "link": "/digital/crbp/items/crbp996.html"
        },
        "start_date": { 
          
          "year": "1944"
        },
        "text": {
          "headline": "Sample Core",
          "text": "Sample core of Grant"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1012_sm.jpg",
          "alt": "Close up view of a strange rock formation",
          "caption": "Strange Rock Formation [01]",
          "link": "/digital/crbp/items/crbp1012.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "03",
          "year": "1944"
        },
        "text": {
          "headline": "Strange Rock Formation [01]",
          "text": "Close up view of a strange rock formation"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1011_sm.jpg",
          "alt": "Close up view of strange rock formations",
          "caption": "Strange Rock Formations [02]",
          "link": "/digital/crbp/items/crbp1011.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "02",
          "year": "1938"
        },
        "text": {
          "headline": "Strange Rock Formations [02]",
          "text": "Close up view of strange rock formations"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp985_sm.jpg",
          "alt": "close up view of the three dimensional model",
          "caption": "Topographic Model [01]",
          "link": "/digital/crbp/items/crbp985.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "03",
          "year": "1938"
        },
        "text": {
          "headline": "Topographic Model [01]",
          "text": "close up view of the three dimensional model"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp984_sm.jpg",
          "alt": "Man works on three dimensional model",
          "caption": "Topographic Model [02]",
          "link": "/digital/crbp/items/crbp984.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "03",
          "year": "1938"
        },
        "text": {
          "headline": "Topographic Model [02]",
          "text": "Man works on three dimensional model"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp983_sm.jpg",
          "alt": "Man works on three dimensional model",
          "caption": "Topographic Model [03]",
          "link": "/digital/crbp/items/crbp983.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "03",
          "year": "1938"
        },
        "text": {
          "headline": "Topographic Model [03]",
          "text": "Man works on three dimensional model"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp982_sm.jpg",
          "alt": "Photograph is a side angle of a topographical map where the dam will be built.",
          "caption": "Topographic Model [04]",
          "link": "/digital/crbp/items/crbp982.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "16",
          "year": "1941"
        },
        "text": {
          "headline": "Topographic Model [04]",
          "text": "Photograph is a side angle of a topographical map where the dam will be built."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1001_sm.jpg",
          "alt": "Weld test",
          "caption": "Weld Test",
          "link": "/digital/crbp/items/crbp1001.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "16",
          "year": "1940"
        },
        "text": {
          "headline": "Weld Test",
          "text": "Weld test"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1190_sm.jpg",
          "alt": "Men remove rock on steeper section of the river bank.",
          "caption": "Breaking Rock [01]",
          "link": "/digital/crbp/items/crbp1190.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "26",
          "year": "1938"
        },
        "text": {
          "headline": "Breaking Rock [01]",
          "text": "Men remove rock on steeper section of the river bank."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1189_sm.jpg",
          "alt": "Columbia Basin Project, Grand Coulee Dam. Removing weathered and unsound surface rock in the bottom of the Columbia River Channel to provide for a watertight union of granite bedrock and the dam.",
          "caption": "Breaking Rock [02]",
          "link": "/digital/crbp/items/crbp1189.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "",
          "year": "1937"
        },
        "text": {
          "headline": "Breaking Rock [02]",
          "text": "Columbia Basin Project, Grand Coulee Dam. Removing weathered and unsound surface rock in the bottom of the Columbia River Channel to provide for a watertight union of granite bedrock and the dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1188_sm.jpg",
          "alt": "View of men breaking up rock for excavation operations.",
          "caption": "Breaking Rock [03]",
          "link": "/digital/crbp/items/crbp1188.html"
        },
        "start_date": { 
          
          "year": "1940"
        },
        "text": {
          "headline": "Breaking Rock [03]",
          "text": "View of men breaking up rock for excavation operations."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1175_sm.jpg",
          "alt": "Close up view of a dump truck dumping material during excavation operations.",
          "caption": "Dump Truck",
          "link": "/digital/crbp/items/crbp1175.html"
        },
        "start_date": { 
          
          "year": "1939"
        },
        "text": {
          "headline": "Dump Truck",
          "text": "Close up view of a dump truck dumping material during excavation operations."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1187_sm.jpg",
          "alt": "General view of early phase of construction of Grand Coulee Dam",
          "caption": "Early Construction",
          "link": "/digital/crbp/items/crbp1187.html"
        },
        "start_date": { 
          
          "year": "1939"
        },
        "text": {
          "headline": "Early Construction",
          "text": "General view of early phase of construction of Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1174_sm.jpg",
          "alt": "View of a variety of heavy machines taking part in excavation operations",
          "caption": "Excavation",
          "link": "/digital/crbp/items/crbp1174.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "21",
          "year": "1935"
        },
        "text": {
          "headline": "Excavation",
          "text": "View of a variety of heavy machines taking part in excavation operations"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1185_sm.jpg",
          "alt": "General view of excavation operations along bank",
          "caption": "Excavation Operations [01]",
          "link": "/digital/crbp/items/crbp1185.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "01",
          "year": "1936"
        },
        "text": {
          "headline": "Excavation Operations [01]",
          "text": "General view of excavation operations along bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1182_sm.jpg",
          "alt": "View of the river, and a large section of the bank, which has been excavated.",
          "caption": "Excavation Operations [02]",
          "link": "/digital/crbp/items/crbp1182.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "29",
          "year": "1934"
        },
        "text": {
          "headline": "Excavation Operations [02]",
          "text": "View of the river, and a large section of the bank, which has been excavated."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1178_sm.jpg",
          "alt": "Distance view of the future site of Grand Coulee Dam. Excavation equipment may be seen in lower-left.",
          "caption": "Future Site Of Grand Coulee [01]",
          "link": "/digital/crbp/items/crbp1178.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "03",
          "year": "1934"
        },
        "text": {
          "headline": "Future Site Of Grand Coulee [01]",
          "text": "Distance view of the future site of Grand Coulee Dam. Excavation equipment may be seen in lower-left."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1177_sm.jpg",
          "alt": "Distance view of the future site of Grand Coulee Dam.",
          "caption": "Future Site Of Grand Coulee [02]",
          "link": "/digital/crbp/items/crbp1177.html"
        },
        "start_date": { 
          
          "year": "1933"
        },
        "text": {
          "headline": "Future Site Of Grand Coulee [02]",
          "text": "Distance view of the future site of Grand Coulee Dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1176_sm.jpg",
          "alt": "Distance view of the future site of Grand Coulee Dam. Excavation operations may be seen in foreground.",
          "caption": "Future Site Of Grand Coulee [03]",
          "link": "/digital/crbp/items/crbp1176.html"
        },
        "start_date": { 
          
          "year": "1934"
        },
        "text": {
          "headline": "Future Site Of Grand Coulee [03]",
          "text": "Distance view of the future site of Grand Coulee Dam. Excavation operations may be seen in foreground."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1192_sm.jpg",
          "alt": "Columbia Basin Project, Grand Coulee Dam. Exposed bedrock in the center section looking west toward block 40. Derrick equipment mounted on the steel shell on the left and another which is to be mounted on the timber located on the rock, are to be used for cleanup of rock and placing concrete.",
          "caption": "General View Of Rock Cleanup",
          "link": "/digital/crbp/items/crbp1192.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "29",
          "year": "1937"
        },
        "text": {
          "headline": "General View Of Rock Cleanup",
          "text": "Columbia Basin Project, Grand Coulee Dam. Exposed bedrock in the center section looking west toward block 40. Derrick equipment mounted on the steel shell on the left and another which is to be mounted on the timber located on the rock, are to be used for cleanup of rock and placing concrete."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1184_sm.jpg",
          "alt": "General view of grouting operations on vertical rock face below pumping plant dam.",
          "caption": "Grouting Operations",
          "link": "/digital/crbp/items/crbp1184.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "06",
          "year": "1939"
        },
        "text": {
          "headline": "Grouting Operations",
          "text": "General view of grouting operations on vertical rock face below pumping plant dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1186_sm.jpg",
          "alt": "Men install piping during early phase of construction.",
          "caption": "Men Install Piping",
          "link": "/digital/crbp/items/crbp1186.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "09",
          "year": "1936"
        },
        "text": {
          "headline": "Men Install Piping",
          "text": "Men install piping during early phase of construction."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1181_sm.jpg",
          "alt": "Panoramic view of the Grand Coulee site. Both banks are visible, as are excavation operations and employee housing.",
          "caption": "Panoramic View Of Grand Coulee Site [01]",
          "link": "/digital/crbp/items/crbp1181.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "02",
          "year": "1935"
        },
        "text": {
          "headline": "Panoramic View Of Grand Coulee Site [01]",
          "text": "Panoramic view of the Grand Coulee site. Both banks are visible, as are excavation operations and employee housing."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1180_sm.jpg",
          "alt": "Panoramic view of the Grand Coulee site. Both banks are visible, as are excavation operations and employee housing.",
          "caption": "Panoramic View Of Grand Coulee Site [02]",
          "link": "/digital/crbp/items/crbp1180.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "02",
          "year": "1935"
        },
        "text": {
          "headline": "Panoramic View Of Grand Coulee Site [02]",
          "text": "Panoramic view of the Grand Coulee site. Both banks are visible, as are excavation operations and employee housing."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1191_sm.jpg",
          "alt": "Columbia Basin Project, Grand Coulee Dam. Bedrock in the old river channel, showing the natural water-worn rock surface as it is found under a bed of clay and boulders left in the canyon during the last ice age, and the operation of removing surface rock to provide for a firm and watertight connection between bedrock and the dam.",
          "caption": "Removing Surface Rock",
          "link": "/digital/crbp/items/crbp1191.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "",
          "year": "1937"
        },
        "text": {
          "headline": "Removing Surface Rock",
          "text": "Columbia Basin Project, Grand Coulee Dam. Bedrock in the old river channel, showing the natural water-worn rock surface as it is found under a bed of clay and boulders left in the canyon during the last ice age, and the operation of removing surface rock to provide for a firm and watertight connection between bedrock and the dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1179_sm.jpg",
          "alt": "View from of excavation taken from across the river. Structures visible in the foreground.",
          "caption": "Structures Along Bank",
          "link": "/digital/crbp/items/crbp1179.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "02",
          "year": "1934"
        },
        "text": {
          "headline": "Structures Along Bank",
          "text": "View from of excavation taken from across the river. Structures visible in the foreground."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1173_sm.jpg",
          "alt": "Caterpillar hauls away materials during the excavation of Grand Coulee site.",
          "caption": "Caterpillar Excavation",
          "link": "/digital/crbp/items/crbp1173.html"
        },
        "start_date": { 
          
          "year": "1939"
        },
        "text": {
          "headline": "Caterpillar Excavation",
          "text": "Caterpillar hauls away materials during the excavation of Grand Coulee site."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1169_sm.jpg",
          "alt": "View of machinery excavating the bank at the Grand Coulee site",
          "caption": "Excavating The Bank",
          "link": "/digital/crbp/items/crbp1169.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "02",
          "year": "1934"
        },
        "text": {
          "headline": "Excavating The Bank",
          "text": "View of machinery excavating the bank at the Grand Coulee site"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1172_sm.jpg",
          "alt": "A 5-yard electric shovel and 10-yard buggies working in the diversion channel",
          "caption": "Excavating The Diversion Channel",
          "link": "/digital/crbp/items/crbp1172.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "",
          "year": "1936"
        },
        "text": {
          "headline": "Excavating The Diversion Channel",
          "text": "A 5-yard electric shovel and 10-yard buggies working in the diversion channel"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1204_sm.jpg",
          "alt": "A view of early excavation operations at Grand Coulee",
          "caption": "Excavation",
          "link": "/digital/crbp/items/crbp1204.html"
        },
        "start_date": { 
          
          "year": "1933"
        },
        "text": {
          "headline": "Excavation",
          "text": "A view of early excavation operations at Grand Coulee"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1170_sm.jpg",
          "alt": "A 5-yard electric shovel, 10-yard dump buggy and 75 H.P. diesel Caterpillar used for excavating in the west side river diversion channel",
          "caption": "Machinery Used For Excavation",
          "link": "/digital/crbp/items/crbp1170.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "30",
          "year": "1936"
        },
        "text": {
          "headline": "Machinery Used For Excavation",
          "text": "A 5-yard electric shovel, 10-yard dump buggy and 75 H.P. diesel Caterpillar used for excavating in the west side river diversion channel"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1205_sm.jpg",
          "alt": "Before designs for the structure could be completed contract for the removal of two million yards of overburden was let to David H. Ryan. A slide along the left bank increased the amount of material to be handled to three million yards. Grand Coulee Dam, Columbia Basin Project, Washington",
          "caption": "Removal Of Overburden",
          "link": "/digital/crbp/items/crbp1205.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "14",
          "year": "1933"
        },
        "text": {
          "headline": "Removal Of Overburden",
          "text": "Before designs for the structure could be completed contract for the removal of two million yards of overburden was let to David H. Ryan. A slide along the left bank increased the amount of material to be handled to three million yards. Grand Coulee Dam, Columbia Basin Project, Washington"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1085_sm.jpg",
          "alt": "Aerial view of construction of Grand Coulee Dam",
          "caption": "Aerial View Of Grand Coulee Construction",
          "link": "/digital/crbp/items/crbp1085.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "03",
          "year": "1940"
        },
        "text": {
          "headline": "Aerial View Of Grand Coulee Construction",
          "text": "Aerial view of construction of Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1092_sm.jpg",
          "alt": "Men align drum gate hinges",
          "caption": "Aligning Drum Gate Hinges [01]",
          "link": "/digital/crbp/items/crbp1092.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "30",
          "year": "1940"
        },
        "text": {
          "headline": "Aligning Drum Gate Hinges [01]",
          "text": "Men align drum gate hinges"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1093_sm.jpg",
          "alt": "Men align drum gate hinges",
          "caption": "Aligning Drum Gate Hinges [02]",
          "link": "/digital/crbp/items/crbp1093.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "30",
          "year": "1940"
        },
        "text": {
          "headline": "Aligning Drum Gate Hinges [02]",
          "text": "Men align drum gate hinges"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1106_sm.jpg",
          "alt": "Aim crosshairs for aligning drum gates.",
          "caption": "Aligning The Drum Gates",
          "link": "/digital/crbp/items/crbp1106.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "06",
          "year": "1941"
        },
        "text": {
          "headline": "Aligning The Drum Gates",
          "text": "Aim crosshairs for aligning drum gates."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1118_sm.jpg",
          "alt": "View of all of the spillway arches.",
          "caption": "Arches Over Spillway",
          "link": "/digital/crbp/items/crbp1118.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "31",
          "year": "1941"
        },
        "text": {
          "headline": "Arches Over Spillway",
          "text": "View of all of the spillway arches."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1141_sm.jpg",
          "alt": "Men and machines clean up debris from powerhouse area. Dam is in the background.",
          "caption": "Cleaning East Powerhouse Area",
          "link": "/digital/crbp/items/crbp1141.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "29",
          "year": "1941"
        },
        "text": {
          "headline": "Cleaning East Powerhouse Area",
          "text": "Men and machines clean up debris from powerhouse area. Dam is in the background."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1091_sm.jpg",
          "alt": "Concrete placing in twist slot",
          "caption": "Concrete Placing",
          "link": "/digital/crbp/items/crbp1091.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "15",
          "year": "1941"
        },
        "text": {
          "headline": "Concrete Placing",
          "text": "Concrete placing in twist slot"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1098_sm.jpg",
          "alt": "Drum gate number one",
          "caption": "Drum Gate #1 [01]",
          "link": "/digital/crbp/items/crbp1098.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "07",
          "year": "1940"
        },
        "text": {
          "headline": "Drum Gate #1 [01]",
          "text": "Drum gate number one"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1096_sm.jpg",
          "alt": "Installation of main girders for drum gate",
          "caption": "Drum Gate #1 [02]",
          "link": "/digital/crbp/items/crbp1096.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "05",
          "year": "1940"
        },
        "text": {
          "headline": "Drum Gate #1 [02]",
          "text": "Installation of main girders for drum gate"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1097_sm.jpg",
          "alt": "Drum gate number one",
          "caption": "Drum Gate #1 [03]",
          "link": "/digital/crbp/items/crbp1097.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "05",
          "year": "1940"
        },
        "text": {
          "headline": "Drum Gate #1 [03]",
          "text": "Drum gate number one"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1099_sm.jpg",
          "alt": "Men work on drum gate number one",
          "caption": "Drum Gate #1 [04]",
          "link": "/digital/crbp/items/crbp1099.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "07",
          "year": "1940"
        },
        "text": {
          "headline": "Drum Gate #1 [04]",
          "text": "Men work on drum gate number one"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1128_sm.jpg",
          "alt": "Man stands on the drum gate arch to give scale.",
          "caption": "Drum Gate And Arch",
          "link": "/digital/crbp/items/crbp1128.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "03",
          "year": "1941"
        },
        "text": {
          "headline": "Drum Gate And Arch",
          "text": "Man stands on the drum gate arch to give scale."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1087_sm.jpg",
          "alt": "Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber",
          "caption": "Drum Gate Installation",
          "link": "/digital/crbp/items/crbp1087.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "21",
          "year": "1940"
        },
        "text": {
          "headline": "Drum Gate Installation",
          "text": "Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1095_sm.jpg",
          "alt": "East end of spillway",
          "caption": "East End Of Spillway",
          "link": "/digital/crbp/items/crbp1095.html"
        },
        "start_date": { 
          
          "month": "11",
          "day": "30",
          "year": "1940"
        },
        "text": {
          "headline": "East End Of Spillway",
          "text": "East end of spillway"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1114_sm.jpg",
          "alt": "East spillway, showing elevator shaft.",
          "caption": "East Spillway",
          "link": "/digital/crbp/items/crbp1114.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "30",
          "year": "1941"
        },
        "text": {
          "headline": "East Spillway",
          "text": "East spillway, showing elevator shaft."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1117_sm.jpg",
          "alt": "Close up view of men working on eastern spillway arch.",
          "caption": "Eastern Spillway Arch",
          "link": "/digital/crbp/items/crbp1117.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "15",
          "year": "1941"
        },
        "text": {
          "headline": "Eastern Spillway Arch",
          "text": "Close up view of men working on eastern spillway arch."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1115_sm.jpg",
          "alt": "Hoisting elevator shaft form into place. 3 men riding load.",
          "caption": "Hoisting Elevator Shaft",
          "link": "/digital/crbp/items/crbp1115.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "30",
          "year": "1941"
        },
        "text": {
          "headline": "Hoisting Elevator Shaft",
          "text": "Hoisting elevator shaft form into place. 3 men riding load."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1101_sm.jpg",
          "alt": "Men stand on girder during drum gate construction",
          "caption": "Men Work On Drum Gate",
          "link": "/digital/crbp/items/crbp1101.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "Men Work On Drum Gate",
          "text": "Men stand on girder during drum gate construction"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1116_sm.jpg",
          "alt": "View of the dam with newly constructed observation building in the foreground",
          "caption": "Observation Point",
          "link": "/digital/crbp/items/crbp1116.html"
        },
        "start_date": { 
          
          "month": "07",
          "day": "04",
          "year": "1941"
        },
        "text": {
          "headline": "Observation Point",
          "text": "View of the dam with newly constructed observation building in the foreground"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1113_sm.jpg",
          "alt": "View of the outlet works near the base of the dam. A man is standing in foreground for scale.",
          "caption": "Outlet Works",
          "link": "/digital/crbp/items/crbp1113.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "26",
          "year": "1941"
        },
        "text": {
          "headline": "Outlet Works",
          "text": "View of the outlet works near the base of the dam. A man is standing in foreground for scale."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1120_sm.jpg",
          "alt": "View overlooking Coulee Dam--a new transmission tower rises.",
          "caption": "Overlooking Coulee Dam",
          "link": "/digital/crbp/items/crbp1120.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "20",
          "year": "1941"
        },
        "text": {
          "headline": "Overlooking Coulee Dam",
          "text": "View overlooking Coulee Dam--a new transmission tower rises."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1102_sm.jpg",
          "alt": "Riveting and welding face plates on drum gate #1",
          "caption": "Riveting And Welding Face Plates",
          "link": "/digital/crbp/items/crbp1102.html"
        },
        "start_date": { 
          
          "month": "01",
          "day": "28",
          "year": "1941"
        },
        "text": {
          "headline": "Riveting And Welding Face Plates",
          "text": "Riveting and welding face plates on drum gate #1"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1090_sm.jpg",
          "alt": "Spillway Section--downstream face",
          "caption": "Spillway Section [01]",
          "link": "/digital/crbp/items/crbp1090.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "24",
          "year": "1940"
        },
        "text": {
          "headline": "Spillway Section [01]",
          "text": "Spillway Section--downstream face"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1100_sm.jpg",
          "alt": "Downstream photo of the spillway section at Grand Coulee Dam",
          "caption": "Spillway Section [02]",
          "link": "/digital/crbp/items/crbp1100.html"
        },
        "start_date": { 
          
          "month": "12",
          "day": "31",
          "year": "1940"
        },
        "text": {
          "headline": "Spillway Section [02]",
          "text": "Downstream photo of the spillway section at Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1150_sm.jpg",
          "alt": "Spillway section of the dam as seen from the left bank near the shop building. Note the man and care at the waterline. (normal)",
          "caption": "Spillway Section From Left Bank [01]",
          "link": "/digital/crbp/items/crbp1150.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "28",
          "year": "1942"
        },
        "text": {
          "headline": "Spillway Section From Left Bank [01]",
          "text": "Spillway section of the dam as seen from the left bank near the shop building. Note the man and care at the waterline. (normal)"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1161_sm.jpg",
          "alt": "General view of the spillway section of Grand Coulee Dam, taken from the west bank for the Columbia River. On this date, approximately 80,000 cubic feet of water per second was plunged nearly 350 feet vertically down the face of the dam, creating a waterfall more than twice the height of Niagara. An additional 25,000 cubic feet of water per second is passing through the hydro-turbine installed in the west powerhouse.",
          "caption": "Spillway Section From Left Bank [02]",
          "link": "/digital/crbp/items/crbp1161.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "16",
          "year": "1944"
        },
        "text": {
          "headline": "Spillway Section From Left Bank [02]",
          "text": "General view of the spillway section of Grand Coulee Dam, taken from the west bank for the Columbia River. On this date, approximately 80,000 cubic feet of water per second was plunged nearly 350 feet vertically down the face of the dam, creating a waterfall more than twice the height of Niagara. An additional 25,000 cubic feet of water per second is passing through the hydro-turbine installed in the west powerhouse."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1086_sm.jpg",
          "alt": "Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber",
          "caption": "Steel And Forms For Drum Gate",
          "link": "/digital/crbp/items/crbp1086.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "20",
          "year": "1940"
        },
        "text": {
          "headline": "Steel And Forms For Drum Gate",
          "text": "Steel and Form work for drum gate installation. Steel is for spillway crest, bridge piers, and drum gate chamber"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1088_sm.jpg",
          "alt": "Transition form for inlet to 57-inch supply pipe for drum gate control. One of these water supply inlets is in each pier for a total of 11. A 57' butterfly valve will be connected to this inlet for control of water supply.",
          "caption": "Transition Form For Inlet",
          "link": "/digital/crbp/items/crbp1088.html"
        },
        "start_date": { 
          
          "month": "06",
          "day": "12",
          "year": "1940"
        },
        "text": {
          "headline": "Transition Form For Inlet",
          "text": "Transition form for inlet to 57-inch supply pipe for drum gate control. One of these water supply inlets is in each pier for a total of 11. A 57' butterfly valve will be connected to this inlet for control of water supply."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1111_sm.jpg",
          "alt": "Upstream view of the dam",
          "caption": "Upstream View Of Grand Coulee [01]",
          "link": "/digital/crbp/items/crbp1111.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "09",
          "year": "1941"
        },
        "text": {
          "headline": "Upstream View Of Grand Coulee [01]",
          "text": "Upstream view of the dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1108_sm.jpg",
          "alt": "Upstream view of the dam taken from Rattlesnake Peak",
          "caption": "Upstream View Of Grand Coulee [02]",
          "link": "/digital/crbp/items/crbp1108.html"
        },
        "start_date": { 
          
          "month": "04",
          "day": "25",
          "year": "1941"
        },
        "text": {
          "headline": "Upstream View Of Grand Coulee [02]",
          "text": "Upstream view of the dam taken from Rattlesnake Peak"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1089_sm.jpg",
          "alt": "View of the construction on Grand Coulee Dam",
          "caption": "View Of Construction On Grand Coulee",
          "link": "/digital/crbp/items/crbp1089.html"
        },
        "start_date": { 
          
          "month": "10",
          "day": "23",
          "year": "1940"
        },
        "text": {
          "headline": "View Of Construction On Grand Coulee",
          "text": "View of the construction on Grand Coulee Dam"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1112_sm.jpg",
          "alt": "Telephoto view of drum gates near base of the dam.",
          "caption": "View Of Drum Gates",
          "link": "/digital/crbp/items/crbp1112.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "22",
          "year": "1941"
        },
        "text": {
          "headline": "View Of Drum Gates",
          "text": "Telephoto view of drum gates near base of the dam."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1107_sm.jpg",
          "alt": "View of the spillway section from the left bank",
          "caption": "View Of The Spillway Section [01]",
          "link": "/digital/crbp/items/crbp1107.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "31",
          "year": "1941"
        },
        "text": {
          "headline": "View Of The Spillway Section [01]",
          "text": "View of the spillway section from the left bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1110_sm.jpg",
          "alt": "View of the spillway section of Grand Coulee taken from the right bank.",
          "caption": "View Of The Spillway Section [02]",
          "link": "/digital/crbp/items/crbp1110.html"
        },
        "start_date": { 
          
          "month": "05",
          "day": "05",
          "year": "1941"
        },
        "text": {
          "headline": "View Of The Spillway Section [02]",
          "text": "View of the spillway section of Grand Coulee taken from the right bank."
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1104_sm.jpg",
          "alt": "View of the spillway section from the right bank",
          "caption": "View Of The Spillway Section [03]",
          "link": "/digital/crbp/items/crbp1104.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "03",
          "year": "1941"
        },
        "text": {
          "headline": "View Of The Spillway Section [03]",
          "text": "View of the spillway section from the right bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1103_sm.jpg",
          "alt": "View of the spillway section from the left bank",
          "caption": "View Of The Spillway Section [04]",
          "link": "/digital/crbp/items/crbp1103.html"
        },
        "start_date": { 
          
          "month": "02",
          "day": "05",
          "year": "1941"
        },
        "text": {
          "headline": "View Of The Spillway Section [04]",
          "text": "View of the spillway section from the left bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1105_sm.jpg",
          "alt": "View of the spillway section from the left bank",
          "caption": "View Of The Spillway Section [05]",
          "link": "/digital/crbp/items/crbp1105.html"
        },
        "start_date": { 
          
          "month": "03",
          "day": "03",
          "year": "1941"
        },
        "text": {
          "headline": "View Of The Spillway Section [05]",
          "text": "View of the spillway section from the left bank"
        }
      },{
        "media": {
          "url": "https://objects.lib.uidaho.edu/crbp/small/crbp1121_sm.jpg",
          "alt": "View of a portion of the spillway section showing formwork and falsework for construction of spillway bridge spans. The construction trestle appears below the formwork. Eight of the 102-inch outlet tubes are shown in use for diversion of the river flow (right)",
          "caption": "West Side Downstream View Of Spillway",
          "link": "/digital/crbp/items/crbp1121.html"
        },
        "start_date": { 
          
          "month": "08",
          "day": "21",
          "year": "1941"
        },
        "text": {
          "headline": "West Side Downstream View Of Spillway",