IMAGE

History of Electric Service in Moscow Item Info

Title:
History of Electric Service in Moscow
Date Created (ISO Standard):
1904
Description:
Power from the Lewiston-Clarkston Improvement Company [LCIC] was turned on the Moscow line May 22, 1905. The original contract for the line was December 1903, subject to some kind of option as of May 1904. Late in 1904 the right-of-way was acquired and construction began. See contract folder 76, box 131 LCIC papers at W.S.U. [Washington State University] Library.
Subjects:
clippings (information artifacts)
Location:
Latah County;Moscow
Latitude:
46.728649
Longitude:
-117.002635
Source:
PG 90, Clifford M. Ott Collection, University of Idaho Library Special Collections and Archives, http://www.lib.uidaho.edu/special-collections/
Source Identifier:
90-03-099
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"History of Electric Service in Moscow", Ott Historical Photograph Collection, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/ott/items/ott455.html
Rights
Rights:
Material determined to be in Public Domain based on date of publication. Material made available by the University of Idaho Library. For more information, please contact University of Idaho Library Special Collections and Archives Department at libspec@uidaho.edu.
Standardized Rights:
https://creativecommons.org/publicdomain/mark/1.0/