IMAGE

Removal Of Overburden (Site preparation) Item Info

Title:
Removal Of Overburden (Site preparation)
Creator:
United States. Army. Corps of Engineers.
Date Created:
1933-12-14
Description:
Before designs for the structure could be completed contract for the removal of two million yards of overburden was let to David H. Ryan. A slide along the left bank increased the amount of material to be handled to three million yards. Grand Coulee Dam, Columbia Basin Project, Washington
Subjects:
dam construction site preparation
Location:
Washington (State) Grant County Grand Coulee Dam
Latitude:
47.962556
Longitude:
-118.977942
Publisher:
University of Idaho Library Digital Initiatives, http://www.lib.uidaho.edu/digital/
Source:
Army Corps of Engineers Dam Construction photographs, 1933-1965, PG 94, University of Idaho Library Special Collections and Archives
Finding Aid:
https://archiveswest.orbiscascade.org/ark:80444/xv165618
Source Identifier:
94-1-1
Type:
Image;StillImage
Format:
image/jpeg

Contact us about this record

Source
Preferred Citation:
"Removal Of Overburden (Site preparation)", Columbia River Basin Project: Dam Construction in the Pacific Northwest, University of Idaho Library Digital Collections, https://www.lib.uidaho.edu/digital/crbp/items/crbp1205.html
Rights
Rights:
In copyright, educational use permitted. Educational use includes non-commercial reproduction of text and images in materials for teaching and research purposes. For other contexts beyond fair use, including digital reproduction, please contact the University of Idaho Library Special Collections and Archives Department at [libspec@uidaho.edu](mailto:libspec@uidaho.edu). The University of Idaho Library is not liable for any violations of the law by users.
Standardized Rights:
http://rightsstatements.org/vocab/InC-EDU/1.0/